PM Submission Object - Kerry Simmonds - MCU16/0153 & REC16/0041
provides for less visitor accommodation on the entire site than was originally sanctioned
by the Planning and Environment Court approval of 12 February 2010.
I have serious concerns about the density, site cover, gross floor area, planting area
and plot ratio having regard to the limitations in the Specific Outcomes for the
Eastern Beaches Locality (Semi-Attached Housing Zone). These calculations should
be based on a site area which excludes the land dedication included in the Court
Order approval (Appeal 25847 of 2008) but which does not exclude the land
associated with the Shopping Centre approval.
4. Staging
The Sprout Architects Staging Plan shows that the developer proposes:-
Stage 1 = Multiple Housing of 3 types
Stage 2 = Hotel/Motel
Given, the location of Stage 1 in a swampy area overlooking wetlands, at least 6 metres
below and behind the Peregian Beach Hotel to the east and the IGA supermarket to the
south, the developer’s suggested marketing of these houses at $725,000 to $800,000 must
raise real doubts as to whether or not any of these houses will be built. This is especially
the case if the developer requires a 60 percent pre-commitment before commencing
construction. Council, of course, could not consider the proposed pricing of these houses as
low cost or budget accommodation. While this is the developer’s risk, it has a bearing on
the completion of the proposed Stage 2 with the visitor accommodation.
Therefore, the completion of Stage 2, which contains the developer’s limited commitment
to visitor accommodation must be seriously doubted.
I ask that Council consider the sincerity of the developer in providing visitor
accommodation when it is left to Stage 2 and the developer’s record to date of having built
no visitor accommodation since 2009.
5. Disruption to Peregian Village and surrounding areas during construction if this
DA is approved
5.1 Engineering Services Report – Page 5 in Response 2B states:-
“There will be earthworks required to facilitate construction of stormwater treatment
facilities, sanitary drainage and allow for an aesthetically pleasing and functional built
form. There is little opportunity for fill material to be won on site therefore most of the fill
material will need to be imported”.
While the total amount of fill required does not seem to have been identified Figure 6
“illustrates the ‘swampy’ nature of the lower area of the site in the vicinity of the proposed
gabion wall” and states that “a fill wall of approximately 2.0m will be required”.
I agree with the comment at page 10 of 13 in the Information Request “that the extent of
filling of the site may need to be reduced.”
Document Set ID: 20308174
Version: 1, Version Date: 26/04/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PM Submission Object - Kerry Simmonds - MCU16/0153 & REC16/0041Related documentApplication case desk ↗
PM Submission Object - Kerry Simmonds - MCU16/0153 & REC16/0041Related documentApplication case desk ↗
About this file
- File size
- 124 KB (small file)
- File type
No other editions are linked here.