P-EA-100527093 - EA Permit - Noosa Shire Council - 20231108 (3)
Attached to the e-mail MCU23/0039 & OPW23/0052 - SARA concurrence agency response.
LOCALITY PLAN
SITE
NOOSA
HEADS
25
NOOSAVILLE
Noosa River Fish Habitat Area
25
NOTES
25
Drawin
g NRD
T34
T35
T36
T33 T37
COPSE 1
T42
COPSE 2
T43
-008
7
D-00
R
gN
r a win
Noosa River Caravan
T1
D
505783 mE
7080270 mN T3
T2 T9-T11
T5 T24 T26 T27 T30 T32
T7
T23 T25 T31
T4 T6 T8 T19 T21 T28 T29
T12
T17 T22
T18 T20
T13-T16
Park Heritage Area
Drawi
ng NR
D-003
D- 006
g N R
Drawing NR in
D-004 Draw
Drawing NR
D-005
0 320
160
Meters
Existing Vegetation
LAT
MHWS
GENERAL NOTES Extent of Works Fish Habitat Area
Extent
SCOPE OF WORKS Seaward Work
1. Dredging and nourishment up to maximum 10,000 tonnes Area Extent
2. Dredging undertaken periodically as required. Fish Habitat Area
3. No works within private lease jetty areas. 25m Buffer
4. No works within 25m of Noosa River Fish Habitat Area. Nourishment
5. No marine plants to be disturbed without approval. (Profile Type 2)
6. Works at Munna Point are in the Noosa River Caravan Park Heritage Area
Nourishment
Landward Extent
DESIGN BASIS Noosa River Caravan
7. Localised erosion occurs due to natural coastal processes and boat wakes. This impacts foreshore amenity, vegetation, parkland and Park Heritage Area
infrastructure. Dredge Area 1
8. Current approvals exist for dredge and nourishment, but these focus on historic sand shoals and erosion hotspots (refer drawing NRD-009). (-4.0m AHD max depth)
9. The Noosa River is dynamic. Shoals have migrated and additional areas require nourishment.
Dredge Area 2
10. The proposed works provide a more flexible approach for the Noosa River southern foreshore from Hilton Esplanade to Weyba Creek. This
(-2.5m AHD max depth)
will allow Noosa Shire Council to manage dredging and nourishment activities in response to changing conditions.
Nourishment Area
DESIGN CONDITIONS
VERTICAL DATUM: AHD HORIZONTAL DATUM: GDA94/56
11. Tide Levels from Queensland Tide Tables 2022 [Munna Point].
HAT +0.63m AHD REVISION REGISTER
MHWS +0.34m AHD - - - - - -
MLWS -0.28m AHD - - - - - -
LAT -0.42m AHD
- - - - - -
12. Bathymetric survey by HydraLogic (25/06/2019).
13. Aerial images from Nearmap dated 17/04/2020. - - - - - -
- - - - - -
DREDGING & NOURISHMENT
1 27.01.23 Initial Issue MM BC AJ
14. All measurements in metres. Dimensions not to be scaled.
REV.NO. DATE DESCRIPTION BY ENG. APP.
15. Dredging is to be undertaken in accordance with the Noosaville Concept Dredge management Plan (ICM, 2023).
16. Material is to be sand suitable for nourishment. Any unsuitable material encountered is not to be placed on the foreshore.
17. Dredging to be undertaken with suitable plant (e.g. small cutter suction dredger with cyclone). International
18. Dredge areas are to target shoals in close proximity to the nourishment area and minimise dredge depth by targeting shoals.
19. Dredging is to target uniform extraction across wide area (i.e. avoid digging holes).
Coastal
20. Nourishment profile is to be consistent with natural foreshore profiles and transition smoothly to the existing profile at the works extent. Management
21. Beach renourishment is not to cover any exposed mangrove pneumatophores. Marine plats survey to be undertaken prior to dredging works OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
and tree protection zone to be pegged out when necessary to avoid impacts (including when exposed pneumatophores are identified). POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
22. Acid sulfate validation testing to be undertaken at a rate of 1 test per 250m³ of disturbed material. In the event that the validation testing WEBSITE www.coastalmanagement.com.au
indicates the material is providing results above 18molH+/tonne (i.e. above the action criteria) a geotechnical expert is to be consulted and
material is to be neutralised at the time of dredging. PROJECT NAME
Noosa River Dredging
MONITORING & MAINTENANCE DRAWING TITLE
23. Foreshore to be monitored periodically, including post-storm events.
24. Dredging to be undertaken as required in response to erosion. Scheme of Works
25. Monitoring of dredging activities to be undertaken in accordance with the Noosaville Concept Dredge management Plan (ICM, 2023). DRAWING No. REVISION:
NRD-001 1
DRAWN : MM CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : As shown DATE : 27 Jan, 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.