Original source · versioned page text
P-EA-100527093 - EA Permit - Noosa Shire Council - 20231108 (3)
Attached to the e-mail MCU23/0039 & OPW23/0052 - SARA concurrence agency response.
Permit
Environmental authority P-EA-100527093
based on a reasonable risk-management approach.
Plant and equipment
An appropriately qualified person must install, operate, calibrate, and maintain the plant and
G7.0
equipment required to carry out the activity (including monitoring devices) in a proper and
effective manner.
Records of installation, calibration and maintenance carried out under condition G7.0 must
G7.1
be kept.
Record keeping
Unless otherwise specified by a condition of this environmental authority, records must be:
a) kept for the period outlined in Table 1 – Record keeping requirements; and
b) provided to the administering authority upon request and in the format requested.
G8 Table 1 – Record keeping requirements
Description of records Retention requirement
Monitoring results Retain for 15 years
All other records Retain for 5 years
Chemical storage
G9 Chemicals and fuels in containers of greater than 15 litres must be stored within a secondary
containment system.
Monitoring and sampling
G10.0 All monitoring and sampling required by the conditions of this environmental authority must
be carried out, interpreted, and recorded by an appropriately qualified person.
Unless otherwise authorised in writing by the administering authority, all laboratory analyses
required under this environmental authority must be carried out by a laboratory that has
G10.1
National Association of Testing Authorities (NATA) accreditation for such analyses. The only
exception to this condition is for in situ monitoring of dissolved oxygen and pH.
At least 10 business days prior to commencing a dredge operation, written notification1 must
be provided to the administering authority of the following:
a) Commencement date of the dredge operation; and
b) Footprint of the area subject to the dredge operation; and
c) Quantity of material (in tonnes) subject to the dredge operation; and
G11 d) Expected end date of the dredge operation.
1 Written notification can be via email to [email protected] or mailed to:
Department of Environment and Science
Permit and Licence Management
Implementation and Support Unit
GPO Box 2454
Brisbane QLD 4001
Page 7 of 18 • ESR/2016/3415 • Version 3.00 • Last reviewed: 29 MAR 2023 Department of Environment and Science
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.