2020-07-16 SM Agenda - Item 1 - Attachment 1 - Changes made to the draft scheme since 11 December 2019
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Source of Section Change Explanation
Change
DSDMIP 9.4.9 Waterways Works Code Overall outcomes revert back to what they were in the advertised version Once the Noosa River
request Plan is finalized this
may be revisited in
future scheme
amendments.
QA Review Table 9.4.10 Waste Management Corrected the order of the POs. No text change. There was a
Code sequencing glitch in
ePlan where PO1 and
PO2 were sitting
beneath all the
subsequent POs
rather than at the
beginning.
See the original