Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 1 - Changes made to the draft scheme since 11 December 2019
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Source of Section Change Explanation
Change
State Planning Policy
Interactive Mapping
System, as a result of
Noosa Council
completing a locally
specific Bushfire Risk
Assessment.
Ministerial Schedule 2 The following note is also added to each of these maps: Proponents will still
Condition Coastal Protection and Scenic need to check the
Amenity Maps Editor’s Note – Development in the erosion prone area, as shown on the SPP interactive State’s SPP mapping.
mapping system, will be subject to assessment against the assessment benchmarks –
natural hazards, risk and resilience within the SPP.
QA review Schedule 6.8 Planning scheme Key Connections reference is now Key Pedestrian/Cycle connections throughout Amended to ensure
Policies Example clarity
PSP7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.