Council archive · source document
20839 DA - Change to a Development Approval - Soundproofing [As Published] · 132000.200418.2
AA OL ¢ 04740766 aveuy BOQ NOOSAVILLE TI¥4017W.DOc - Pereging Beach Gymnasium Noise . Pereglan Beach Gymnasium - 22 Deczabét 2000 RECOMMENDATIONS The following additional constructions are recommended to reduce noise emissions t design criterion. We understand that the gym is to be fully air-conditioned and conse constnictions recommended below allow for this. Shop 7 — Aerobics Room All walls enclosing the aerobics room should be full height ie. extending from the cd to the underside of the roof. Service penetrations through ceiling baffles should be $i D meet the quently the mcrete slab ed airtight. Ifthe gap is large, use metal flashing and pack the cavity with insulation. Provide flexible sealant around all edges. The inner wall of shop 7 appears to be full height and is therefore likely to provide s: isfactory sound isolation to the adjacent tenancy. It should be confirmed that this wall is full height for the entire length of shop 7 and shop 8. If any part of the wall is not full height, then with the construction given in Figure 2. block up A new wall is required behind the glazed wall to the corridor. This allows the existing wall to remain untouched. The new wall should be full height and of the following construction: & 1x13 mm fire-rated plasterboard / 64 mm metal studs with 50 mm fibreglass or iusulation / 1x 13 mm fire-rated plasterboard. polyester RFA ACOUSTIC pean FTy LTD @
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20839 DA - Change to a Development Approval - Soundproofing [As Published]Related documentApplication case desk ↗
About this file
- File size
- 938 KB (small file)
- File type
No other editions are linked here.