Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

SUPERSEDEDApproved Plan OPW22-0123

of 78

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
writing. The Superintendent is not obliged to make any additional payment or accept any increase in the
contract period unless agreed prior to the Contractor beginning work.


1.5.         SITE CONDITIONS
The Contractor shall inspect the site, and examine all plans, drawings and reports, and check all aspects of
work under the Contract and refer any discrepancies to the Superintendent for decision, prior to
commencement. Failure to do so will not be taken as a reason to claim a variation.

•      Existing site conditions;
•      Site access and storage requirements.
•      Check all relevant dimensions on site before proceeding with work.
•      No claim for extras arising from failure to obtain measurements and other information on site will be
       allowed.
•      It is the Contractor's responsibility to thoroughly inspect the site and to assess the quantity of cut and fill
       of earthworks required to achieve the grades indicated on the grading plans.


1.6.         LOCAL BUSINESS NOTES
Contractor is encouraged to maximise local industry participation in major procurement opportunities, by
providing local industry with full, fair and reasonable opportunity to tender.

The principle of full, fair and reasonable opportunity can be achieved by:

•      considering the project’s whole-of-life from design to completion and ongoing maintenance
•      ensuring at the tender preparation stage that tenders are packaged in a manner that optimises local
       industry opportunities while enhancing project competitiveness and value for money
•      undertaking a supply market analysis to identify potential local suppliers
•      using Australia and New Zealand (ANZ) standards and codes ‘or equivalent’ in the formulation of
       specifications, tenders and the letting of contracts, wherever it is practicable to do so
•      providing early notice to the market of a planned upcoming major procurement
•      encouraging sub-contractors to support and report against the charter principles
•      using the services of local content specialists such as Industry Capability Network Queensland (ICN Qld)
       and supporting the use of these specialists by sub-contractors.

Full, Fair and Reasonable Opportunity
The provision of equitable opportunity for capable local industry to participate in the procurement activity by
ensuring:

•      Full: Local industry has the same opportunity as other potential suppliers to participate in all aspects of a
       project from design through to completion, in all supply and ongoing maintenance.
•      Fair: Local industry is provided the same opportunity as other potential suppliers to compete for
       investment projects and other market based contracts on an equal and transparent basis.
•      Reasonable: Tenders are free from any unreasonable specifications or requirements that could rule out
       local industry and are structured in such a way as to provide local industry the opportunity to participate.

This definition is consistent with the Australian Industry Participation National Framework.

Procurement
Procurement is the entire process by which all classes of resources (human, material, facilities and services)
are obtained. This can include the functions of planning, design, standards determination, specification
writing, selection of suppliers, financing, contract administration, disposals and other related functions.




URBIS
URB -P0003847-001-SP                                                                                             PAGE   3
Log in to download the original file

SUPERSEDEDApproved Plan OPW22-0123.pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.