Log in to see the plans as drawn5. EDGES 5.1. GENERAL SPECIFICATIONS Samples Install a minimum 2.5m long typical portion of each different edge type showing materials, colour, finish and joints for approval by the Landscape Architect. If acceptable, this sample should be retained as a quality benchmark and shall form part of the finished works. 5.2. EDGE TYPES ED01: Edge Type – Concrete edge Material - In-situ concrete (grey Portland cement), 25 mpa or as per Noosa Shire Council requirements Dimension - 100mm wide x 100mm deep, 5mm rounded chamfer to top edges Sub-base depth/material - 100mm compacted road base Expansion joints - 10mm wide Abelflex, max. 5m spacing. Connection reinforcing rod between expansion joints Surface Finish - Smooth trowel finish Colour - Plain grey Levels - Top surface is to finish flush with the adjacent kerbs or pavement ED02: Edge Type– Timber Edge Material - CCA treated hardwood (HW), rough sawn, treatment Class H5 or as per Noosa Shire Council requirements Material dimensions - 100mm tall x 25mm wide Stakes / support - 50 x 50mm HW. Length suitable to be driven firmly into the ground (450mm typ). Install sufficient stakes and nails to hold the edge firmly in position and true to the design line, minimum1 stake per 2 Lm Joins - Connect individual edge timbers with a 1m length of edging set down 20mm below the main edge pieces and fixed to them to achieve a smooth line Colour - None to be applied Levels - Top surface is to finish flush with the adjacent kerbs or pavement URBIS URB -P0003847-001-SP PAGE 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.