te Engineering Report Noosa on Weyba 5101/19-01 5101/19-01 Prepared for Northbrook Corporation Pty Ltd October 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 39 (of 109)
Section 2
Engineering Report
Noosa on Weyba
Document Information
Prepared for Northbrook Corporation Pty Ltd
Project Name Noosa on Weyba
File Reference 121126 Noosa on Weyba - Engineering Report.docx
Job Reference 5101/19-01
Date October 2013
Contact Information
Cardno (Qld) Pty Ltd
ABN 57 051 074 992
Level 6, Springfield Tower
145 Sinnathamby Boulevard
Springfield Central Qld 4300
Telephone: 07 3381 0111
Facsimile: 07 3470 1241
International: +61 7 3381 0111
[email protected]
www.cardno.com.au
Document Control
Version Date Author Author Reviewer Reviewer
Initials Initials
1 12/11/12 Warren Steiner WS Steve Korn SK
2 26/11/12 Steve Korn SK Warren Steiner WS
3 10/10/13 Steve Korn SK Paul Wilson PW
© Cardno 2012. Copyright in the whole and every part of this document
belongs to Cardno and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media
to any person other than by agreement with Cardno.
This document is produced by Cardno solely for the benefit and use by the
client in accordance with the terms of the engagement. Cardno does not
and shall not assume any responsibility or liability whatsoever to any third
party arising out of any use or reliance by any third party on the content of
this document.
October 2013 Cardno ii
Section 3
Engineering Report
Noosa on Weyba
Table of Contents
1 Introduction 5
1.1 Proposed Development 5
1.2 Biodiversity Offset Area 6
1.3 Staging 6
2 Earthworks 7
2.1 Geotechnical Investigations 7
2.2 Demolition and Clearing 7
2.3 Excavation 7
2.4 Retaining Structures 8
2.5 Erosion and Sediment Control Plan 8
2.5.1 Phase 1 Construction – Site Setup Works 8
2.5.2 Phase 2 and 3 Construction – Bulk Earthworks and Civil Works 8
2.5.3 Monitoring 8
2.5.4 Reporting 9
2.5.5 Correction Action 9
2.6 Acid Sulfate Soils Management Plan 9
2.6.1 Performance Objectives 9
2.6.2 Performance Criteria 10
3 Roadworks 11
3.1 Trunk Road Alignment 11
3.1.1 Walter Hay Roundabout 11
3.1.2 Road 2 12
3.2 Typical Cross Sections 12
3.3 Existing Road Upgrades 13
3.4 Concrete Works 13
3.4.1 Shared Footpath 13
3.4.2 Kerb 13
4 Stormwater Management 14
4.1 Stormwater Quality Management 14
4.2 Flood Study 14
4.2.1 Minimum Floor Levels / Filling 15
4.2.2 Culvert Crossing 15
5 Sewerage Reticulation 16
5.1 External Connections 16
5.2 External Augmentations 16
5.3 Internal Network 16
6 Water Reticulation 18
6.1 External Connections 18
6.2 Internal Network 18
7 Integrated Water Cycle Management Plan 19
8 Preliminary Acoustic Analysis 20
9 Conclusion 21
October 2013 Cardno iii
Section 4
Engineering Report
Noosa on Weyba
Appendices
Appendix A Concept Master Plans
Appendix B Constraints Plan
Appendix C Engineering Sketches
Appendix D Preliminary Acoustic Analysis
Appendix E PRELIMINARY EROSION & SEDIMENT CONTROL PLAN
Appendix F Preliminary Acid sulFate soil management plan
Appendix G RFI Index
Tables
Table 1-1 Proposed Indicative Staging 6
Table 2-1 Preliminary Earthwork Design Results 8
Table 3-1 Scope of Existing Road Upgrades 13
October 2013 Cardno iv
Section 5
Engineering Report
Noosa on Weyba
1 Introduction
This report has been updated in response to the Request for Information (RFI) from Sunshine Coast
Regional Council, dated 28th February 2013. The responses to this request are contained within the report.
We have provided an index in Appendix G, which locates the responses to the relevant RFI items within the
report for ease of reference.
Northbrook Corporation Pty Ltd has commissioned the services of Cardno (Qld) Pty Ltd to prepare an
Engineering Report for the proposed Noosa on Weyba Development (the development) situated at Walter
Hay Drive, Noosa.
This engineering report will accompany the Development Application for a Preliminary Approval overriding
the Planning Scheme under Section 242 of the Sustainable Planning Act 2009.
Cardno has carried out an engineering assessment of the bulk earthworks, roadworks, stormwater drainage
and servicing in order to demonstrate the site is suitable for development. This assessment has been based
on the proposed layouts found in Appendix A and prepared by ML Design:
Structure Plan (MP-005) - this is used for reference, but is not part of the Preliminary Approval.
Precinct Plan (MP-006) - this is the plan that forms part of the Preliminary Approval.
To support this report, engineering sketches have been prepared and included within Appendix C.
The objectives of this assessment are to:
> Undertake a site inspection to confirm the existing conditions and determine suitability for development
from a civil engineering perspective;
> Understand the overall earthworks cut and fill requirements for the development;
> Ensure the layout generally complies with horizontal and vertical road design requirements;
> Select suitable road cross-section profiles with consideration to the environment, functionality and safety;
> Ensure sufficient space and functionality of stormwater treatment devices and drainage structures;
> Ensure the site can be adequately serviced with connection to water and sewer networks;
> Ensure the proposed pad and road levels provide flood immunity and appropriate evacuation routes;
> Ensure the development is designed so that suitable provision for public transport can be achieved;
> Review relevant Local and State guidelines, policies and plans to ensure general compliance; and
> Ensure the project can be developed in a manner that protects the environment using the latest urban
design principles.
1.1 Proposed Development
The development is located within Sunshine Coast Regional Council (SCRC), in the suburbs of Noosaville
and Weyba, south of the Noosa CBD. The site is traversed by two existing road reserves, north-south
Walter Hay Drive, and east-west Hollett Road. Cardno Sketch SK001 (Appendix B) indicates the site’s
location.
The total site area is 303ha consisting of Lot 1667 on M3772, Lots 11 and 12 on RP 893393, Lot 2 on
RP160983, Lot 7 on RP46782, Lot 53 on SP16357 and Lot 2 on SP179590. Drawing No M2090-001
‘Constraints Plan 1’ prepared by JFP and included within Appendix 2 details the applicable land parcels and
current zoning.
The development proposes to redefine the existing lots into approximately 139.5ha of koala habitat
protection / enlargement of the Noosa National Park, approximately 105.5ha of environmental protected land
and approximately 58ha of net development area. The development will consist of community title schemes
October 2013 Cardno 5
Section 6
Engineering Report
Noosa on Weyba
including a mix of residential, retirement living, age care and retail precincts accommodating approximately
2,000 people. Cardno Sketch SK002 illustrates the proposed development areas.
The site’s primary access is the proposed roundabout on Walter Hay Drive, with a secondary access from
the south via Tidswell Road. An emergency access connection is also proposed from the west with
connection via Hollett Road to Eumundi-Noosa Road.
The alignment of the emergency access connection to Eumundi Road is contained within the alignment of
the existing track and therefore utilising the existing use of the track.
1.2 Biodiversity Offset Area
Although the development is not specifically located with the urban footprint controls within the South East
Queensland Regional Plan (SEQRP), the site has recently been declared a Biodiversity Development Offset
Area (BDOA). This effectively allows for a development application for a form of urban development to be
submitted on land that is otherwise zoned for rural purposes.
On the 3rd February 2012, the site was declared to be a BDOA project which determines that 139.5ha of the
site is to be dedicated to the State for perpetual Koala Habitat protection. Under the BDOA the 139.5ha of
land to be dedicated is called the “Send” land, which then leaves a balance of 163.5ha of gross development
land, which is called the “Receive” land, for potential development approval for a form of urban development.
The BDOA declaration over-rides the urban footprint controls in the SEQRP and determines that a
development application can be lodged over the 163.5ha of Receive land noting that all normal SPA
requirements must be met to be properly considered and approval potentially granted.
1.3 Staging
To determine the infrastructure phasing, an indicative staging plan has been developed. As shown on
Cardno Sketch SK700, it has been assumed that the development will be constructed over nine stages.
Table 1-1 below indicates precincts to be included within each stage.
It is noted that the staging plan is indicative and that further refinement will be undertaken when the
development application for each precinct is prepared.
Table 1-1 Proposed Indicative Staging
Stage No. Precinct Label Precinct No.
(Plan MP-005 – (Plan MP-006 –
Structure Plan) Precinct Plan)
1 H 3
2 G 2
3 F 2
4 A, B, C, D, E 1
5 I (phase 1) 3
6 I (phase 2) 3
7 K 4
8 J 4
9 L 4
October 2013 Cardno 6
Section 7
Engineering Report
Noosa on Weyba
2 Earthworks
2.1 Geotechnical Investigations
A Geotechnical Investigation has been carried out across the site to determine the likely geotechnical
conditions. In summary, the investigations concluded the following:
> The subsurface conditions at the site generally consist of a layer of either loose sands or soft to firm clay
underlain by stiff or better clays. Weathered rock was encountered in some of the boreholes;
> Soils types indicate that infiltration of stormwater will not be a suitable method of disposal;
> A topsoil stripping depth of approximately 100mm will be required; and
> A detailed acid sulfate management plan will be required. Once the nature and area of disturbance is
finalised, the requirement for further sampling and testing can be determined and an acid sulphate
management plan undertaken.
For further details refer to the Geotechnical Investigation prepared by Cardno.
2.2 Demolition and Clearing
Significant areas of the site have already been previously cleared as part of the current rural land use. The
development footprint is generally located within these existing cleared areas to maximise the retention of
existing vegetation and minimise clearing requirements.
It is proposed to utilise environmental sensitive construction techniques and tree protection zones during
construction to avoid impact on retained vegetation.
Site visits indicate there are no significant existing structures other than a few rural sheds within the
development areas. Any existing fencing and drainage structures will be removed and disposed offsite
during construction.
2.3 Excavation
To understand the cut and fill requirements a bulk earthworks model has been prepared for the site. Existing
site levels have been based on the aerial survey data provided by JFP and indicated on Cardno Sketch
SK003.
Earthworks areas have been minimised to limit the impact on the existing vegetation and retain significant
vegetation. Excavation is generally confined to existing road reserves, proposed roads and the development
footprint.
The earthworks model has been based on preliminary road gradings and adopted building pad levels based
on the flood immunity requirements. Cardno Sketch SK004 indicates the preliminary bulk earthworks levels
and cut and fill zones. No allowances have been included for compaction losses or bulking factors, and a
500mm deep road box has been assumed.
The earthworks modelling has been carried out over four earthworks areas as indicated in Table 2-1 below.
Cut zones are generally located within Areas 1 and 3, and fill zones generally within Area 2. The area
fronting Lake Weyba has been maintained at existing levels to minimise any visual impact of the
development. Maximum cut and fill depths are within 3m and located in areas with substantial buffers to
Lake Weyba and the environment protection areas.
In summary, the assessment indicates that an overall cut to fill balance can be achieved, potentially negating
the requirement for the importation of fill and haulage of material on existing Council roads or through the
local road network. It is noted that further bulk earthworks analysis will be undertaken with subsequent
development applications for each precinct. The further analysis will consider the earthwork staging to
improve the efficiencies of hauling material between precincts.
October 2013 Cardno 7
Section 8
Engineering Report
Noosa on Weyba
Table 2-1 Preliminary Earthwork Design Results
Area Net Cut Net Fill Balance
(m3) (m3) (m3)
1 96,200 14,300 81,900
2 2,200 128,200 -126,000
3 44,500 6,000 38,500
4 5,800 100 5,700
Total 148,700 148,600 100
2.4 Retaining Structures
The development areas generally consist of gentle grades and therefore it is assumed that no inter allotment
retaining walls will be required.
Retaining walls are currently proposed on the eastern boundary of Precinct G, western boundary of Precinct
F, and the road connection between Precincts G and F. Further assessment and refinement of the bulk
earthworks model at the subsequent development application stage will determine final locations and confirm
suitable retaining wall types.
2.5 Erosion and Sediment Control Plan
The aim of the Erosion and Sediment Control Plan (ESCP) plan (Appendix E) is to provide performance
criteria, strategies and procedures to assist in minimising the impact of construction activities on the physical
and social environment.
This ESCP has been prepared with reference to the ‘Best Practice Erosion and Sediment Control (2008)’
guidelines published by the International Erosion Control Association (IECA) Australasia, and current local
best practice engineering and environmental management.
The objective is to control soil erosion on the site and prevent sediment discharge to downstream local water
courses or road stormwater drainage systems during storm events for the construction phase of the project.
Following are the phases for effective erosion and sediment control with details outlined firther within the
report.
2.5.1 Phase 1 Construction – Site Setup Works
The Phase 1 construction works generally involves activities such as installing appropriate stabilised site
access points, establishing site compound areas, and undertaking initial clearing works to allow for the
installation of erosion and sediment control measures and haul roads.
2.5.2 Phase 2 and 3 Construction – Bulk Earthworks and Civil Works
The Phase 2 construction works generally involves the clearing works and bulk earthworks necessary to
create the allotments and roads outlined on the nominated engineering drawings. The Phase 3 construction
works generally involves the civil works associated with the sealing of roadways, the installation of services
and permanent stormwater treatment devices, and the stabilisation of the allotments.
2.5.3 Monitoring
As a minimum the following monitoring should be carried out during the construction phase to confirm
compliance as follows:
> Inspection of any disturbed / filled areas for their potential erosion.
October 2013 Cardno 8
Section 9
Engineering Report
Noosa on Weyba
> Regular (daily) inspections of erosion protection measures.
> Inspections during, or following each significant rainfall event for erosion incidence.
2.5.4 Reporting
It is recommended that a weekly check sheet be filled out and monthly reports, including any testing results,
are prepared by the Contractor. The monthly reports should contain information on the performance of the
erosion and sediment control devices and any water quality monitoring results and a brief description of the
same (including any incidences of non-compliance and corrective actions implemented).
2.5.5 Corrective Action
Non-compliance with the water quality ‘Discharge Performance Criteria’, the strategies outlined in the ESCP
and / or conditions of approval must be dealt with immediately. If there is a breach or infringement of
conditions, action will be taken consistent with the nature and seriousness of the breach or infringement.
2.6 Acid Sulfate Soils Management Plan
The purpose of the Acid Sulfate Soils Management Plan (Appendix F) is to identify potential areas of concern
in regards to acid sulphate soils across the development area and provide possible proposed treatment
processes for these areas to support the preliminary development application.
This plan aims to provide a preliminary identification of the acid-producing potential of the soils in relation to
the proposed works, for the development of management strategies to protect sensitive receptors such as
groundwater and adjacent waterways. The aim of this plan is to minimise the impact of the project on the
physical and social environment.
A geotechnical investigation of the site was undertaken by Cardno Bowler on the 10th May 2012. This
investigation included acid sulphate soils sampling and testing at 8 locations across the site.
At the locations shown on Cardno Bowler drawings, boreholes were excavated to a depth of 2 metres. Field
analysis were carried out on 64 samples taken from the boreholes, with the following results.
> The field pHF testing indicated that actual acid sulphate soils were unlikely to be present at the borehole
locations.
> The field pHFOX testing indicated a low likelihood of Potential Acid Sulphate Soils at the locations tested.
Further laboratory tests (Chromium Reducible Sulfur (Scr) Suite) were undertaken on a total of 16 of the 64
samples taken from the boreholes, with the following results:
> The levels of potential sulfidic acidity (SCR or SPOS) ranged between 0.005% and 0.208%, with the more
significant levels generally being encountered at depths of 1.0m to 1.5m at boreholes BH4, BH30, BH31.
> The levels of actual acidity (s-TAA) ranged between 0.003% and 0.208%, with the more significant levels
generally being encountered at depths of 1.0m to 1.5m at locations BH4, BH30, BH31.
> Recommended liming rates are provided in the test reports located in Appendix B of the geotechnical
investigation report enclosed with this document.
The previous investigations undertaken by Cardno Bowler, and the desktop study indicate that further
investigation of the site will be required and a detailed Acid Sulphate Soils Management Plan be prepared.
This detailed plan will be prepared once the nature and extent of the works in each area has been
determined, and the locations of the further testing required can be accurately provided.
2.6.1 Performance Objectives
To avoid detrimental impact on the soil and water quality and habitat values of the region, as a result of the
discharge of acidic waters from the site during construction activity through the following aims:
> to minimise the potential for the transport of acidic leachate;
> to prevent the development of actual acid sulphate soils; and
> to protect surface water and groundwater quality on the site.
October 2013 Cardno 9
Section 10
Engineering Report
Noosa on Weyba
2.6.2 Performance Criteria
The following are the main items, though not extensive, to be addressed to ensure the performance
objectives are met. Refer to management plan for further detail:
> Site Preparation
> Staff Training - Site Induction
> Storage of Lime on Site
> Site Drainage
> Transportation
> Earthworks
- In areas where excavations may disturb potential or actual ASS, testing shall occur to determine the
liming rate. Acidic materials shall be neutralised in situ prior to any transport within the site.
> Neutralisation
> Dewatering
- In areas where dewatering is required, extracted waters shall be directed to a temporary holding pond.
The extracted waters will then be tested for the parameters. Should the water held in the pond achieve
the release criteria, it may be discharged, however if it doesn’t meet the release criteria, the water is to
be neutralised, and then retested to verify compliance.
> Filling
> Stockpiling
> Monitoring
October 2013 Cardno 10
Section 11
Engineering Report
Noosa on Weyba
3 Roadworks
3.1 Trunk Road Alignment
Protection of environment has been a fundamental principle in the development of the road network. The
road alignment and cross-section profiles have been developed by integrating specialist advice from the
traffic, civil, urban design and ecological disciplines to determine the most environmentally sensitive and
practical road alignment. A combination of low speed signage, traffic calming devices and intentional road
geometry is proposed to ensure environmental protection.
In general, the proposed roads are located within existing cleared areas where the impact on the vegetation
can be minimised. Cardno Sketch SK100 indicates the road hierarchy and proposed alignments for the trunk
road network. The precincts west of Walter Hay are serviced by a main collector road and a rural collector.
The precincts to the east of Walter Hay Drive are serviced by a combination of distributor and collector
roads.
It is proposed the trunk roads indicated on the hierarchy plan within the existing road reserves, will become
part of the SCRC controlled road network. Trunk roads within the private property can become SCRC roads
or part of the Community Title Schemes (CTS). These trunk roads will provide access to the various CTS
precincts which will be designed and approved in subsequent development applications.
To ensure the retention of significant vegetation and provide confidence of the ability to locate roads within
this site, feature tree surveys have been carried out at the proposed Road 2 and Hollett Road West. It is
envisaged that further detailed feature survey will be undertaken at subsequent development applications to
accurately understand the constraints of the existing vegetation adjoining the road alignments. Ultimately,
the road design will incorporate functionality and safety, whilst minimising the impact on the existing
vegetation.
The retention of significant vegetation and reduced pavement widths will also encourage a lower speed
environment which will provide added safety to pedestrians, cyclists and wildlife.
The removal of the road within Hollet Road reserve to the west of Walter Hay Drive and replaced with an
internal driveway to precincts J, K & L has reduced significantly the amount of vegetation to be removed
including old growth trees. The location of the internal driveway is along an existing gravel track which is
largely cleared of vegetation.
The relocation of the collector road within Hollet Road reserve to the east of Walter Hay Drive and relocation
to the internal alignment to the south of precincts F & G, has also greatly reduced the amount of vegetation
to be removed. Hollet Road East will now contain only a 4m wide bushfire emergency and access track
which has been located to reduce the impact on mature and hollow bearing trees.
The SCRC RFI made comment on possible future duplication of Water Hay Drive. Cardno met with council
officers to obtain plans showing this duplication, but Council advised there is no plan indicating this
duplication at present. This road is not controlled by DTMR and therefore we can only conclude there is no
requirement for future duplication dedication.
3.1.1 Walter Hay Roundabout
Cardno Sketch SK102 provides an indicative layout of the proposed Walter Hay Drive Roundabout. The
location of the proposed access to Walter Hay Drive has been determined by consideration of the following
two factors:
1. The ability to provide an access point which does not significantly impact on the flora and fauna of the
existing Bush; and
2. The most suitable location where an access can be constructed without the requirement for excessive
earthworks.
The preliminary assessment indicates that a suitable connection with the eastern and western development
precincts adjoining the roundabout is possible with limited earthworks and clearing of existing vegetation.
October 2013 Cardno 11
Section 12
Engineering Report
Noosa on Weyba
The existing contours as can be seen on Sketch SK003 indicate there is less than 1m fall across the
diameter of the roundabout which will require minimal earthworks.
Infrastructure along Walter Hay Drive will be realigned as per normal roadworks upgrades if required.
The assessment also indicates that there is sufficient area available to accommodate the roundabout
including reverse curves. With reference to the existing road reserves and property boundaries, the only
properties that are affected by the roundabout are the properties owned by the proponent of the submission
and therefore there is no concern.
It is also noted that the proposed reduced speed environment on Walter Hay Drive will provide additional
benefits in reducing the potential for fauna conflicts and reducing traffic noise.
A range of alternative connections to Walter Hay Drive were also considered through the design
development. A strengths and weaknesses assessment was carried out to determine the most suitable
intersection type. The assessment compared a staggered priority intersection, priority crossroads
intersection, roundabout intersection, signalised intersection and a grade separated intersection. Following
the assessment, it was determined that the roundabout intersection would be most suited to the site.
The Traffic Impact Assessment prepared by Cardno provides further details for the alternate connections.
3.1.2 Road 2
Cardno Sketch SK103 provides an indicative layout for the proposed Road 2 connection between precinct H
and Hollett Road (east). A detailed tree survey has been undertaken to enable selection of a suitable
alignment to minimise impact on the existing vegetation. The layout demonstrates that a significant portion of
the road footprint can be contained within the existing vegetation cleared area.
Prior to selection of the Road 2 alignment, an existing access driveway (located approximately 100m east of
the proposed alignment) was considered as an alternative Road 2 alignment. Following the ground truth,
flooding assessment and ecological assessment, it was determined that the alternative alignment would
have a greater impact on the environment.
The cross section of Road 2 has been modified to ensure there is minimal environmental disturbance. The
cross sections proposed, as detailed in Section 3.2 below, are adequate for safety and servicing the volume
of traffic predicted on this road, as well as minimising the footprint on the existing vegetation.
Localised widening has also been incorporated at the connection of Road 2 and Hollett road to allow for bus
turning movements.
3.2 Typical Cross Sections
Due to the environmental sensitivity of existing and proposed road alignments adjoining the conservation
and national park areas, it is proposed to utilise a combination of typical SCRC road cross-sections and
modified road cross-sections. Cardno Sketch SK101 indicates the typical cross-sections proposed for the
development.
Where sufficient area is available, the SCRC typical cross-sections have been utilised. In areas of ecological
sensitivity, modified typical sections have been utilised to reduce the extent of clearing. Road 2 and Hollett
Road (east) propose modified cross-sections incorporating a reduced pavement width of 7.4m. This
pavement width reduction will minimise the road footprint, whilst maintaining suitability for bus access. Three
modified typical sections are proposed, each section represents a difference scenario depending on the
existing contours, drainage requirements and cycle / pedestrian requirements.
Where applicable, the cross-sections maintain a 4m service corridor to one side, and 1m electrical easement
to the opposite side.
It is also noted that Road 2 and Hollett Road are part of the trunk road network and therefore proposed to be
SCRC controlled roads. To achieve the optimum ecological and road design outcome, modified cross-
sections have been proposed for these roads. Although these roads are not strictly in accordance with
SCRC policy, we believe this is a practical and ecologically beneficial outcome for the project.
Through the preparation of subsequent development applications and detailed design, further refinement
and analysis of the cross-sections will be undertaken.
October 2013 Cardno 12
Section 13
Engineering Report
Noosa on Weyba
3.3 Existing Road Upgrades
The development proposes an upgrade to Tidswell Road and a small portion of Hollet Road with a
roundabout..Upgrades to Tidswell Road and Hollett Road are proposed to provide access points to the
development. These roads are currently unsealed and will require full road reconstruction.
It is proposed that the upgrade of existing Council roads will be undertaken on behalf of Council or by
Council, at an agreed cost to the development. As these roads will be also be adjoining environmental
sensitive areas, a combination of low speed signage, traffic calming devices and intentional road geometry is
proposed.
The alignment of Tidswell Road and Holet Road have taken into consideration the old growth and hollow
bearing trees to retain as many as possible, as can be seen on plans 510119/002-SK901 to SK 903 in
Appendix C.
Upgrade works are proposed in accordance with Table 3-1 below.
Table 3-1 Scope of Existing Road Upgrades
Section of Road Current Road Current Carriageway Proposed Width / Type
Reserve Width (m) Formation (refer SK101)
Collector Type 2,
Hollett Road (East) 30 Unsealed
7.4m pavement
Rural Road
Tidswell Road 30 Unsealed
9.0m pavement
3.4 Concrete Works
3.4.1 Shared Footpath
For all trunk collector roads a 2.5m wide shared concrete footpath has been assumed to one-side. A shared
footpath connection is also proposed between the eastern and western section of Hollett Road reserve. This
link has been provided to ensure direct pedestrian and cycle connectivity to both sides of Walter Hay Drive.
A further western link extension is also proposed along Hollett Road (west) with connection to Eumundi-
Noosa Road. Cardno Sketch SK100 indicates the proposed shared footpath locations.
Generally, it is proposed to locate the shared footpath on the standard alignment, however it is noted that
some cases the footpath may be further offset to accommodate existing significant vegetation. The final
alignment will be determined during subsequent development applications and detailed design.
3.4.2 Kerb
It is proposed to utilise a combination of edge restraint, barrier and mountable type kerbs, depending on
required road profile. Protection of park and open space areas will be achieved by either barrier kerb or
bollards, or a combination of both.
Management and control of stormwater runoff will also determine the type of kerb to be adopted on each
section of road.
October 2013 Cardno 13
Section 14
Engineering Report
Noosa on Weyba
4 Stormwater Management
4.1 Stormwater Quality Management
A Stormwater Management Plan (SMP) has been prepared for the development to determine the overall
Water Sensitive Urban Design (WSUD) strategy for the site. The plan outlines WSUD measures that will be
adopted for each precinct and the site as a whole. MUSIC modelling has also been undertaken to ensure
water quality objectives can be met.
Due to the ecologically sensitive location of the site, appropriate stormwater quality treatment is of the
upmost importance. The proposed WSUD strategy for the site includes:
> Community education;
> Reducing potable water demand through use of water efficient devices and appliances;
> Large rainwater tanks (around twice the QDC size requirements) connected to all practically available
roof area to maximise rainwater harvesting and reduce potable water demand;
> Bio-retention basins;
> Bio-retention gardens within the road reserve;
> Bio-retention tree pits within the road reserve;
> Bio-retention swales;
> Vegetated swales;
> Litter baskets;
> Buffer areas; and
> Rehabilitation of Keyser Creek waterway corridor.
Cardno Sketch SK300 provides indicative sizing and locations for the proposed treatment devices. The
proposed treatment devices have been located outside of ecologically sensitive areas and outside of the 100
year ARI extent of inundation, but within the development footprint.
The outlets for stormwater will be designed to minimise concentration of stormwater flows by dispersing the
flows over the terrain of the receiving environment.
MUSIC modelling has shown that the water quality objectives and frequent flow objectives for the site can be
met. The resultant pollutant loads are less than those resulting from the existing rural use of the site. Final
sizing and locations will be refined through the preparation of subsequent development applications and
detailed design.
For further details refer to the SMP prepared by Cardno.
4.2 Flood Study
A flood study has been prepared for the development to determine the flood levels and the potential impact
of development on peak flood levels and flows for neighbouring areas. The study also provides details of the
proposed flood mitigation strategies to be implemented.
In summary, the flood modelling has indicated:
> There is no adverse impacts on flood levels and flows for surrounding properties for local and regional
flood events;
> A reduction in the 100 year ARI event the peak flood level around Lake Entrance Boulevard can be
achieved due to flow attenuation proposed within the site;
> Flood attenuation can be provided through controlled culverts and detention basins;
> 100 year ARI trafficability can be achieved for all proposed and upgraded roads; and
October 2013 Cardno 14
Section 15
Engineering Report
Noosa on Weyba
> An improved flood access for neighbouring properties is possible to Lake Entrance Boulevard/Aspera
Place. This is not required for the proposed development, rather the flood free access as shown on
SK100, is a proposed added benefit to the neighbouring community as a result of the development of the
subject site. This existing residential area is landlocked during a Q2 event as shown on Figure 14 in the
Cardno Flood Study accompanying this submission. Details of alignment and formation will be
determined by Council as this access is not required by this development.
For further details refer to the Flood Study prepared by Cardno.
4.2.1 Minimum Floor Levels / Filling
Cardno Sketch SK301 indicates the pre and post development 100 year ARI inundation levels as determined
by the flood modelling.
The development west of Walter Hay Drive is predominantly outside of the 100 year ARI inundation extent.
Minor sections of filling are required within Precinct I. The 100 year ARI developed case peak flood level is
3.45 mAHD in this area. Therefore the minimum floor levels will be set above 3.95 mAHD to provide
sufficient flood immunity in accordance with SCRC requirements.
Filling is required within the Precinct F and G to ensure that sufficient flood immunity is provided. A
waterway corridor of a minimum 120 metre width will be maintained in this area. The 100 year ARI
developed case peak flood level is 2.90 mAHD in these areas. Therefore the minimum floor levels will be set
above 3.40 mAHD to provide sufficient flood immunity in accordance with SCRC requirements. The entire
area will be filled to levels above the 100 year ARI flood level (with climate change).
The proposed filling within the site will reduce available flood storage, although compared to the available
storage in Lake Weyba and the surrounding floodplain, the reduction is minimal. Flood modelling has shown
that the impact of the reduced flood storage is contained within the site.
4.2.2 Culvert Crossing
The development proposes a number of culvert crossings to provide road access, flood immunity and
stormwater detention. Cardno Sketch 300 and 302 provides indicative locations and sizing for the proposed
culvert crossings.
Where roads have been located between the Noosa Wildlife Refuge and the environmental protection, the
minimum culvert height has been set at 1200mm, with a width of 2700mm, to allow for the safe passage of
koalas and other animals.
The Department of Main Roads Fauna Sensitive Road Design (2000) indicates that culverts of this
height are recommended to allow for passage of small, medium and large mammals and semi-
arboreal mammals (which includes koalas).
The culverts have been sized to these dimensions to specifically allow the movement of fauna between
these areas.
October 2013 Cardno 15
Section 16
Engineering Report
Noosa on Weyba
5 Sewerage Reticulation
A sewerage network analysis has been undertaken to determine the impact of the development on the
external sewerage infrastructure and develop a servicing strategy for the site.
Discussions with Unitywater have indicated that planning for the region was out-dated and therefore not
available. Unitywater has indicated that the existing network is generally adequate, with little operating
issues. In order to undertake the network analysis, GIS and existing pump station design data was provided
by Unitywater.
The proposed development is located within the Noosa Coastal sewerage scheme. This scheme consists of
multiple local catchments that discharge to the Noosa Heads Sewage Treatment Plant (STP). The
Noosaville Industrial catchment is a small local sewerage catchment containing three small pump stations,
discharging to a larger pump station (NVL011) located to the north of the development. It is proposed that
the development would discharge to the Noosaville Industrial catchment.
For further details refer to the Water Supply and Sewerage Analysis prepared by Cardno.
5.1 External Connections
Connection to the external network is proposed at the existing pump station NVL011 within the Noosaville
Industrial catchment. Connection would be discharged via 400 metres of 150 mm diameter rising main along
Walter Hay Drive. The preferred connection (Option 1) is shown through the Noosa Civic Shopping Centre
property which will require land owners consent and these discussions are in progress. The alternative route
(Option 2) is via council roads, which ensures the development will be able to connect to the existing
sewerage infrastructure.
A secondary connection point is also proposed to service Precincts J, K and L at the existing 150 mm
diameter main along Lake Entrance Boulevard. This will involve connecting into existing Unitywater
infrastructure which has easements over the infrastructure to allow connection into the existing network.
An alternative is to pump this small catchment to the proposed network to the east which will ensure this
area can be serviced.
Cardno Sketch SK500 indicates proposed connection points to the existing network.
5.2 External Augmentations
Networks analysis has determined the impact of the development on the existing sewer network from the
proposed connection point to the Noosa STP. The network analysis has included existing catchment
demands and growth projections. The following infrastructure has been assessed:
> Pump Station NVL011 – Current spare capacity of 20% of the development yield requires augmentation
to accommodate full development yield;
> Eenie Creek Road Trunk Mains – Analysis indicates that trunk mains do not surcharge with inclusion of
full development yield;
> Pump Station NVL040 – Analysis indicates that pump station can accommodate additional development
yield, however operating at a lower efficiency; and
> Noosa STP – Analysis indicates the Noosa STP requires augmentation to accept the full development
yield. Unitywater has advised that the augmentation of the Noosa STP is proposed, with a completion
date scheduled for December 2015. It is expected that following the STP augmentations, the STP will be
sufficient to accommodate the development loads.
5.3 Internal Network
An internal sewerage network been developed utilising a conventional sewer system consisting of a network
of mains ranging in size from 150 mm to 225 mm. Analysis has indicated that the use of gravity mains at
minimum grade will be able to service the development.
October 2013 Cardno 16
Section 17
Engineering Report
Noosa on Weyba
Due to the topography of the site, several pump stations are required to convey flow to the external
connection points. Three small pump stations are required to service the Precincts B, D and E on the south
eastern corner of the development. A larger pump station is required to convey flow to the external
catchment.
Cardno Sketch SK600 indicates proposed internal trunk sewer network and pump station locations.
Alternative servicing strategies such as the use of low pressure sewers have been considered for this
development, however for the purposes of this report, a conventional sewer system has been assumed. It is
envisaged that subsequent development applications may result in alternative servicing strategies such as
low pressure sewers.
Whether the development is a body corporate scheme or a council asset, the probable outcome for the
ownership of the sewerage asset will be Unitywater taking ownership of the entire system. This scenario has
been the case for multiple developments Cardno have been involved with and there is no obstacle for this
scenario to happen on this development. Ownership will be determined by the Infrastructure Agreement
which we have been in discussion with Unitywater to complete.
October 2013 Cardno 17
Section 18
Engineering Report
Noosa on Weyba
6 Water Reticulation
A water network analysis has been undertaken in consultation with Unitywater to determine the impact of the
development on the existing water network and develop a servicing strategy for the site.
The proposed development would connect to the existing network within the Noosa Industrial District Meter
Area (NIDMA) and serviced via the Tewantin Reservoirs.
In preparing the water supply servicing strategy a performance assessment of the development was also
undertaken by MWH for Unitywater.
The conclusions of the MWH report were:
> Under maximum hour demand conditions, Unitywater Desired Standard of Service (DSS) were met at the
proposed development site and within Noosa Industrial DMA during the 2038 planning horizon;
> Under fire flow demand conditions, Unitywater DSS were met at the proposed development site and
within Noosa Industrial DMA during the 2038 planning horizon;
> The storage assessment identified that the inclusion of the Noosa on Weyba development brings forward
storage deficiency of the Tewantin Reservoir to 2016 when assessed against the DSS. A total storage
deficiency of the Tewantin Reservoir of 1.64 ML was identified at the 2031 planning horizon; and
> No augmentation of the existing network is required.
For further details refer to the Water Supply and Sewerage Analysis prepared by Cardno.
6.1 External Connections
The existing Noosa water supply network was assessed and suitable connections to the development
identified. An existing 600 mm diameter trunk main along Eenie Creek Road is the primary service main for
Noosa and is in close proximity to the development. In addition, an existing residential development located
immediately north of the proposed development is serviced via a 150 mm diameter main. It is proposed to
utilise both the 600 mm trunk and the smaller 150 mm diameter mains to service the development.
A primary 250mm diameter connection is proposed to the 600 mm diameter trunk main at the intersection of
Eenie Creek Road and Walter Hay Drive. A secondary 200 mm diameter connection is proposed to connect
to the 150 mm diameter main along Lake Entrance Boulevard. Cardno Sketch SK600 indicates the
proposed connection points to the existing network.
6.2 Internal Network
A network of trunk mains and smaller reticulations mains is required to maintain Unitywater’s DSS within the
development.
A 250 mm diameter main along Walter Hay Drive is proposed between the connection at the 600mm
diameter trunk main along Eenie Creek Road and the development. This main will provide the bulk of flow to
the development and is required to maintain non-residential fire flows (30l/s) to the development. A second
200 mm diameter connection to the existing mains at Lake Entrance Boulevard should be considered. An
internal 200 mm diameter distribution main is proposed to convey flow to each precinct within the
development. 150 mm diameter mains will be required to maintain the fire flow DSS. The rest of the
network would comprise of 100mm diameter mains to service properties. Cardno Sketch SK600 indicates
proposed internal trunk water network.
Whether the development is a body corporate scheme or a council asset, the probable outcome for the
ownership of the water asset will be Unitywater taking ownership of the entire system. This scenario has
been the case for multiple developments Cardno have been involved with and there is no obstacle for this
scenario to happen on this development. Ownership will be determined by the Infrastructure Agreement
which we have been in discussion with Unitywater to complete.
October 2013 Cardno 18
Section 19
Engineering Report
Noosa on Weyba
7 Integrated Water Cycle Management Plan
An Integrated Water Cycle Management Plan (IWCMP) has been prepared by Gilbert and Sutherland. The
ICWMP considered several servicing options for the development and recommends Option 4 as the
preferred servicing strategy. Option 4 assumes sewage is treated off-site at the Noosaville STP and
maximises rainwater harvesting at each residence.
The recommendations of the IWCMP will be adopted as part of the WSUD strategy for the site. Rainwater
harvesting will be maximised through the connection of all available roof area to the tank and the utilisation
of rainwater tank sizes around twice the size prescribed by the Queensland Development Code. Collected
rainwater will be used for irrigation, toilet flushing and laundry purposes. This will significantly reduce the
potable water demand of the site.
For further details refer to the IWCMP prepared by Gilbert and Sutherland.
October 2013 Cardno 19
Section 20
Engineering Report
Noosa on Weyba
8 Preliminary Acoustic Analysis
A preliminary acoustic analysis has been undertaken to determine the impact of road traffic noise from
Walter Hay Drive at the development. This preliminary analysis was conducted on the basis of a number of
assumptions that will require further assessment in subsequent development applications.
The preliminary analysis indicates that the use of acoustic barriers at the proposed property boundaries and
future dwelling screening could provide acceptable acoustic treatments for this part of the site.
The acoustic impact for the surrounding existing residential area is expected to be lower for the proposed
roundabout and subsequent lower traffic speeds, compared to the existing road conditions.
For further details refer to the Preliminary Road Traffic Noise Assessment prepared by Cardno and included
with Appendix D.
October 2013 Cardno 20
Section 21
Engineering Report
Noosa on Weyba
9 Conclusion
Cardno has carried out an engineering assessment of the bulk earthworks, roadworks, stormwater drainage
and servicing for the development with paramount consideration to environmental protection. The report has
provided an assessment of the suitability of the site for development. In summary, the following conclusions
have been made:
> The development footprint is generally located within the existing cleared areas and minimal additional
clearing will be required. Environmental sensitive design and construction techniques will be used to
avoid impact on retained vegetation;
> Earthworks areas have been minimised to limit the impact on the existing vegetation. Excavation is
generally confined to existing road reserves, proposed roads and the development footprint. Preliminary
bulk earthworks modelling indicates that a balance cut to fill can be achieved, which could potential
reduce impact on the surrounding community and Council roads;
> Significant consideration has been given to the environmental values of the site when determining both
road location and cross sections to minimise disturbance to the natural environment. In general, the
proposed roads are of an environmentally sensitive design and located within existing cleared areas
where the impact on the vegetation can be minimised. Road design incorporates functionality and safety,
whilst minimising the impact on the existing vegetation and recognising the need for fauna crossings;
> The retention of significant vegetation and reduced pavement widths encourage a lower speed
environment whilst providing added safety to pedestrians, cyclists and wildlife;
> Where roads have been located between the Noosa Wildlife Refuge and the environmental protection,
the minimum culvert height has been set at 1200mm, with a width of 2700mm, to allow for the safe
passage of koalas and other animals.
> Minimal upgrades to Hollett Road and Tidswell Road are proposed to provide access points to the
development. These roads are currently unsealed. The upgrade of existing Council roads will be
undertaken on behalf of Council or by Council, at an agreed cost to the development;
> Due to the ecologically sensitive location of the site, appropriate stormwater quality treatment is of the
upmost importance. The proposed WSUD strategy for the site includes community education, large
rainwater tanks, bio-retention basins, vegetated swales and litter baskets;
> The flood study indicates there are no adverse impacts on flood levels and flows for surrounding
properties for local and regional flood events. Flood attenuation is proposed through controlled culverts
and detention basins at various locations. All development areas have sufficient flood immunity in
accordance with SCRC requirements;
> The development provides an improved flood access for neighbouring properties and a reduction in the
100 year ARI event the peak flood level around Lake Entrance Boulevard;
> A sewerage network analysis has been undertaken and determined the development can be
accommodated with external augmentation to Pump Station NVL011 and the Noosa STP. Currently the
Noosa STP is scheduled to be upgraded in December 2015. The assessment indicates connection to the
existing network is possible to the north of the development;
> A conventional gravity sewer network is proposed to service the development. Several pump stations are
required to convey to the flow to the existing network connection points. Alternative servicing strategies
such as the use of low pressure sewers have been considered for this development. It is envisaged that
subsequent development applications may result in alternative servicing strategies;
> A water network analysis has been undertaken and determined that no augmentation of the existing
network is required to accommodate the development. Connection to the existing network is possible to
the north of the development. A network of trunk mains and smaller mains is required internally to
maintain Unitywater’s DSS within the development; and
October 2013 Cardno 21
Section 22
Engineering Report
Noosa on Weyba
> A preliminary acoustic analysis has been undertaken and indicated that the use of acoustic barriers at the
proposed property boundaries and future dwelling screening should provide an acceptable acoustic
treatments for the site.
> The acoustic impact for the surrounding existing residential area is expected to be lower for the proposed
roundabout and subsequent lower traffic speeds, compared to the existing road conditions.
October 2013 Cardno 22
Section 23
Engineering Report
Noosa on Weyba
Noosa on Weyba
APPENDIX
A
CONCEPT MASTER PLANS
October 2013 Cardno 23
Section 24
NOOSA ON WEYBA| STRUCTURE PLAN NORTHBROOK CORP PTY LTD © M L Design Pty Ltd Drawn by: AR ACN 100 492 304 File Path: P:\NORT0001_Lake Weyba\B_Documentation\B1_Production\B1_Drawings\InDesign\130208 Alternate Design Considerations ABN 89 159 048 228 SCALE - 1:10,000 @ A3 APPROVED FOR ISSUE ____ 25/09/2013 JOB NO: NORT0001 MP-005-[I]
Section 25
NOOSA ON WEYBA
PRECINCT PLAN NORTHBROOK CORP PTY LTD AND J & K HOFMANN
ML Design Pty Ltd 0 50.0 100 200 300 400 500m
ACN 100 492 304
ABN 89 159 048 228 SCALE- 1:10000 @ A3 APPROVED FOR ISSUE: 23/11/2012 © ML Design Pty. Ltd. JOB NO: NORT0001 MP-006-[D]
Plot Date: 23/11/2012
File Path: P:\NORT0001_Lake Weyba\B_Documentation\B1_Production\B1_Drawings\ArchiCAD\Layouts\NORT0001_Layout.pln
Section 26
Engineering Report
Noosa on Weyba
Noosa on Weyba
APPENDIX
B
CONSTRAINTS PLAN
October 2013 Cardno 24
Section 27
2
SP142258,
EMU MOUNTAIN
ae
—=SP167978
@
7
—= RP46782
SP142258
(2)
77
SP177938
ls 1
SP163571
-
53
$P163571
SP163571
(2)
77
SP177938
JONES FLINT & PIKE
J) cevelopment consultants, planners and surveyors
National Park
RP893393
WEYBA
NOTES
(1) This plan was prepared for the purpose and
exclusive use of MANTLE GROUP for the purposes
of preliminary investigation of the existing constraints
covering the land in the plan and is not to be used
for any other purpose or by any other persons or
corporation.
JONES FLINT & PIKE PTY LTD accepts no
responsibility for any loss or damage suffered
howsoever arising to any person or corporation who
may use or rely on this plan in contravention to the
terms of this clause or clauses 2 or 3 hereof.
(2) The information on this plan has been extracted
from Noosa Council and Maroochy Shire Council
plans and is subject to further investigation and is
suitable only for the purpose indicated. The
accuracy of the information has to be verifled
and no reliance should be placed upon such
data for any purpose other than for the purposes
mentioned above.
(3) This Plan may not be photocopied unless this note
is included.
NOOSA COUNCIL
COMMUNITY SERVICES
[4 RURAL SETTLEMENT
RURAL
FA OPEN SPACE CONSERVATION
[a SHIRE BUSINESS CENTRE
MAROOCHY SHIRE COUNCIL
WATER RESOURCE
CATCHMENT AREA
(Lake Weyba Catchment Area)
( : —Yy Y Y >
(A3) 1:15000 revision
sae =—T=| NOOSAVILLE PROPERTIES al
JONES FLINT & PIKE PTY, LTD. ACN. 080414 045 c 5
BRISBANE - JFAP House SUNSHINE COAST ote our nes he anno Fone aanGEh Soe RENSE URE crigiel sue mee Lae M ANTLE G RO U P isons decay
Sebastes Cooeeiond 101 Hencachrteee Guncraeed. 58 designed ccoPyrigit (©) 2008 JONES FLINT & PIKE PTY LTD A M2090-001
Aelephone (07) 3844 7161 ‘telephone (07) 5443 2500 drawn ADW] THS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN
GLADSTONE ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT fle name
59 Goondoon Street, checked | IGL | THE WRITTEN CONSENT OF JONES FLINT & PIKE PTY LTD. M2090-001.DWG
Gladstone Queenslans. 4680
www jip.com.au telephone (07) 4972 2100 [approved | 1GL_| datum DATUM origin (BM) ORIGIN_BM ae AQ _J date 9th October 2006 sy,
Section 28
Engineering Report
Noosa on Weyba
Noosa on Weyba
APPENDIX
C
ENGINEERING SKETCHES
October 2013 Cardno 25
Section 29
Cardno (Qld) Pty Ltd | ABN 57 051 074 992
Springfield Tower, Level 6, 145 Sinnathamby Boulevard
Springfield, Qld 4300
PO Box 4480, Springfield, Qld 4300
Tel: 07 3381 0111
Fax: 07 3470 1241
Web: www.cardno.com.au
Email: [email protected]
NORTHBROOK CORPORATION PTY LTD
NOOSA ON WEYBA
MASTER PLANNING
PROPERTY DESCRIPTION
LOT 2 ON SP179590, LOT 53 ON SP16357, LOT 11 ON RP893393 Drawing No.: 510119/002-SK000
PARISH OF WEYBA
COUNTY OF MARCH Date: 12/11/2012
LOCAL GOVERNMENT: SUNSHINE COAST Client Ref No:
AUSTRALASIA ASIA AFRICA MIDDLE EAST UK/EUROPE NORTH AMERICA LATIN AMERICA
Section 30
DATE PLOTTED: 24 September 2013 4:57 PM BY : PAUL JACUBA (SPRINGFIELD)
GENERAL
SITE
ROADWORKS
STORMWATER/FLOODING
GENERAL TRUNK SERVICES
LOCALITY PLAN
NOT TO SCALE
CAD FILE: L:\5101-19\002\Acad\Sketch\510119002-SK001.dwg
Cardno Limited
All Rights Reserved.
NORTHBROOK CORPORATION PTY LTD
This document is produced by
Cardno Limited solely for the benefit
NOOSA ON WEYBA FOR APPROVAL
of and use by the client in
accordance with the terms of the
MASTER PLANNING
and shall not assume any Cardno (Qld) Pty Ltd | ABN 57 051 074 992 A.H.D. 13/09/2012 AS SHOWN A1
responsibility or liability whatsoever Springfield Tower, Level 6, 145 Sinnathamby Boulevard
Springfield Central, Qld 4300
XREF's:
to any third party arising out of any
PO Box 4480, Springfield, Qld 4300
use or reliance by third party on the
content of this document.
Tel:07 3381 0111 Fax:07 3470 1241
Email: [email protected] Web: www.cardno.com.au LOCALITY PLAN AND SCHEDULE OF DRAWINGS 5
Section 31
DATE PLOTTED: 24 September 2013 4:57 PM BY : PAUL JACUBA (SPRINGFIELD)
EUMU
NDI-NO
I
H
OSA R
OAD
I
J
H
L
I
K HOLLET ROAD
HOLLET
ROAD
E
IV
G
DR
D C B
Y
HA
R
TE
AL
MOST INTERNAL
W
KERB RETURN RADII = 8.0m
F E B
XREF's: X-510119002-BDY-01; X-510119002-CONT-EX; X-510119002-PRECINCT PLAN; X-510119002-BDY-02; X-510119002-DESIGN-06
A
OAD
LR
EL
SW
TID
CAD FILE: L:\5101-19\002\Acad\Sketch\510119002-SK002.dwg
LEGEND
OVERALL LOT
LAYOUT PLAN
Cardno Limited
All Rights Reserved.
NORTHBROOK CORPORATION PTY LTD
Scale 1:5000
This document is produced by
Cardno Limited solely for the benefit
NOOSA ON WEYBA FOR APPROVAL
of and use by the client in
accordance with the terms of the
MASTER PLANNING
and shall not assume any Cardno (Qld) Pty Ltd | ABN 57 051 074 992 A.H.D. 13/09/2013 AS SHOWN A1
responsibility or liability whatsoever Springfield Tower, Level 6, 145 Sinnathamby Boulevard
to any third party arising out of any Springfield Central, Qld 4300
PO Box 4480, Springfield, Qld 4300
use or reliance by third party on the
content of this document.
Tel:07 3381 0111 Fax:07 3470 1241
Email: [email protected] Web: www.cardno.com.au OVERALL LOT LAYOUT PLAN 6
Section 32
DATE PLOTTED: 24 September 2013 4:58 PM BY : PAUL JACUBA (SPRINGFIELD)
EUMU
NDI-NO
I
H
OSA R
OAD
I
J
H
L
I
K HOLLET ROAD
HOLLET
ROAD
E
IV
G
DR
D C B
Y
HA
XREF's: X-510119002-BDY-01; X-510119002-CONT-EX; X-510119002-BDY-02; X-510119002-DESIGN-04; X-510119002-PRECINCT PLAN; X-510119002-DESIGN-06
R
TE
AL
W F E B
A
OAD
LR
EL
SW
TID
LEGEND
CAD FILE: L:\5101-19\002\Acad\Sketch\510119002-SK003.dwg
EXISTING FEATURES
LAYOUT PLAN
Cardno Limited
All Rights Reserved.
NORTHBROOK CORPORATION PTY LTD
Scale 1:5000
This document is produced by
Cardno Limited solely for the benefit
NOOSA ON WEYBA FOR APPROVAL
of and use by the client in
accordance with the terms of the
MASTER PLANNING
and shall not assume any Cardno (Qld) Pty Ltd | ABN 57 051 074 992 A.H.D. 30/08/2013 AS SHOWN A1
responsibility or liability whatsoever Springfield Tower, Level 6, 145 Sinnathamby Boulevard
to any third party arising out of any Springfield Central, Qld 4300
PO Box 4480, Springfield, Qld 4300
use or reliance by third party on the
content of this document.
Tel:07 3381 0111 Fax:07 3470 1241
Email: [email protected] Web: www.cardno.com.au EXISITNG SITE ELEVATIONS 5
Section 33
DATE PLOTTED: 24 September 2013 5:00 PM BY : PAUL JACUBA (SPRINGFIELD)
LEGEND
I
H
I
H
XREF's: X-510119002-BDY-01; X-510119002-CONT-EX; X-510119002-DESIGN-04; X-510119002-BDY-02; X-510119002-CONT-PR; X-510119002-PRECINCT PLAN; X-510119002-DESIGN-06
HOLLET
I ROAD
ROAD G
D C B
BULK EARTHWORKS
LAYOUT PLAN
Scale 1:2500
F E B
K HOLLET ROAD
CAD FILE: L:\5101-19\002\Acad\Sketch\510119002-SK004.dwg
BULK EARTHWORKS
LAYOUT PLAN
Scale 1:2500
BULK EARTHWORKS
LAYOUT PLAN
Cardno Limited
All Rights Reserved.
NORTHBROOK CORPORATION PTY LTD
Scale 1:2500 This document is produced by
Cardno Limited solely for the benefit
NOOSA ON WEYBA FOR APPROVAL
of and use by the client in
accordance with the terms of the
MASTER PLANNING
and shall not assume any Cardno (Qld) Pty Ltd | ABN 57 051 074 992 A.H.D. 24/09/2013 AS SHOWN A1
responsibility or liability whatsoever Springfield Tower, Level 6, 145 Sinnathamby Boulevard
to any third party arising out of any Springfield Central, Qld 4300
PO Box 4480, Springfield, Qld 4300
use or reliance by third party on the
content of this document.
Tel:07 3381 0111 Fax:07 3470 1241
Email: [email protected] Web: www.cardno.com.au BULK EARTHWORKS 6
Section 34
DATE PLOTTED: 24 September 2013 5:01 PM BY : PAUL JACUBA (SPRINGFIELD)
EUMU
NDI-NO
PROPOSED ACCESS TRACK REFER TO SK102
ROAD 11
FOR FLOOD RELIEF OF FOR DETAILS
OSA R
NEIGHBOURING RESIDENTS
ROA
D 15
ROAD 12
OAD
ROAD 13
RO
AD
ROAD 14
9
10
AD
RO
1
AD
RO
7
ROAD
ROAD
8 PROPOSED ACCESS TRACK
ROAD 2
REFER TO SK103 EMERGENCY AND BUSHFIRE
FOR DETAILS ACCESS
4
ROAD
ROAD 6
PROPOSED ROUNDABOUT AT
INTERSECTION 12.5m BUSES
ROAD 3
ROAD 5 TURNING
XREF's: X-510119002-CONT-EX; X-510119002-BDY-01; X-510119002-PRECINCT PLAN; X-510119002-BDY-02; X-510119002-DESIGN-06; 130902 NORT0001 Amended concept post council discussion RevD
HOLLET ROAD PROPOSED PROPOSED
CARPARK TIMBER BRIDGE
HOLLET PROPOSED ROUNDABOUT
EXISTING TRACK TO REMAIN ROAD 17 R OAD AT INTERSECTION FOR
FOR EMERGENCY AND LOCALISED WIDENING FOR BUS TURNAROUND
BUSHFIRE ACCESS BUS TURNING MOVEMENT
ROAD 16
ROAD 27
ROAD 18
ROAD 21
E
IV
DR
ROAD 19
Y
HA
26
ROA
ROAD 31
ROA
ROAD 23
AD
ROAD 22
D 33
R
RO
ROAD 30
D3
TE
ROAD 20
5
ROAD 29
AL
ROAD 24
ROAD 32
W
ROAD 34
ROAD 25
ROAD 28
ROAD 25
O AD LEGEND
LR
EL
SW
TID
CAD FILE: L:\5101-19\002\Acad\Sketch\510119002-SK100.dwg
ROAD HIERARCHY
LAYOUT PLAN
Cardno Limited
All Rights Reserved.
NORTHBROOK CORPORATION PTY LTD
Scale 1:5000
This document is produced by
Cardno Limited solely for the benefit
NOOSA ON WEYBA FOR APPROVAL
of and use by the client in
accordance with the terms of the
MASTER PLANNING
and shall not assume any Cardno (Qld) Pty Ltd | ABN 57 051 074 992 A.H.D. 13/09/2013 AS SHOWN A1
responsibility or liability whatsoever Springfield Tower, Level 6, 145 Sinnathamby Boulevard
Springfield Central, Qld 4300
to any third party arising out of any
PO Box 4480, Springfield, Qld 4300 TRUNK ROAD
use or reliance by third party on the
content of this document.
Tel:07 3381 0111 Fax:07 3470 1241
Email: [email protected] Web: www.cardno.com.au HIERARCHY LAYOUT 6
Section 35
DATE PLOTTED: 24 September 2013 5:01 PM BY : PAUL JACUBA (SPRINGFIELD)
SCRC STANDARD TYPICAL SECTIONS MODIFIED TYPICAL SECTIONS
DISTRIBUTOR ROAD TYPICAL SECTION COLLECTOR ROAD TYPE 2A TYPICAL SECTION
COLLECTOR ROAD TYPE 1 TYPICAL SECTION
COLLECTOR ROAD TYPE 2B TYPICAL SECTION
RURAL COLLECTOR ROAD TYPICAL SECTION
COLLECTOR ROAD TYPE 2C TYPICAL SECTION
EMERGENCY / BUSH ACCESS ROAD TYPICAL SECTION SHARED PATH TYPICAL SECTION
LEGEND
ACCESS DRIVEWAY TYPICAL SECTION
CAD FILE: L:\5101-19\002\Acad\Sketch\510119002-SK101.dwg
Cardno Limited
All Rights Reserved.
NORTHBROOK CORPORATION PTY LTD
This document is produced by
Cardno Limited solely for the benefit
NOOSA ON WEYBA FOR APPROVAL
of and use by the client in
accordance with the terms of the
MASTER PLANNING
and shall not assume any Cardno (Qld) Pty Ltd | ABN 57 051 074 992 A.H.D. 12/11/2012 AS SHOWN A1
responsibility or liability whatsoever Springfield Tower, Level 6, 145 Sinnathamby Boulevard
Springfield Central, Qld 4300
TRUNK ROAD
XREF's:
to any third party arising out of any
PO Box 4480, Springfield, Qld 4300
use or reliance by third party on the
content of this document.
Tel:07 3381 0111 Fax:07 3470 1241
Email: [email protected] Web: www.cardno.com.au TYPICAL CROSS SECTIONS 5
Section 36
DATE PLOTTED: 24 September 2013 5:01 PM BY : PAUL JACUBA (SPRINGFIELD)
XREF's: X-510119002-AERIAL-2; X-510119002-BDY-01; X-510119002-EXIST-TREE; X-510119002-DESIGN-06; X-510119002-DESIGN-04
LEGEND
WALTER HAY DR
LAYOUT PLAN
CAD FILE: L:\5101-19\002\Acad\Sketch\510119002-SK102.dwg
Scale 1:500
Cardno Limited
All Rights Reserved.
NORTHBROOK CORPORATION PTY LTD
This document is produced by
Cardno Limited solely for the benefit
NOOSA ON WEYBA FOR APPROVAL
of and use by the client in
accordance with the terms of the
MASTER PLANNING
and shall not assume any Cardno (Qld) Pty Ltd | ABN 57 051 074 992 A.H.D. 3/09/2013 AS SHOWN A1
responsibility or liability whatsoever Springfield Tower, Level 6, 145 Sinnathamby Boulevard
Springfield Central, Qld 4300
to any third party arising out of any
PO Box 4480, Springfield, Qld 4300 WALTER HAY DRIVE ROUNDABOUT
use or reliance by third party on the
content of this document.
Tel:07 3381 0111 Fax:07 3470 1241
Email: [email protected] Web: www.cardno.com.au DETAIL LAYOUT PLAN 5
Section 37
DATE PLOTTED: 24 September 2013 5:02 PM BY : PAUL JACUBA (SPRINGFIELD)
ROAD 2
DETAILED LAYOUT PLAN
Scale 1:500
XREF's: X-510119002-CONT-EX; X-510119002-AERIAL-2; X-510119002-EXIST-TREE; X-510119002-ECO-MAP; X-510119002-DESIGN-06; X-510119002-DESIGN-04
LEGEND
CAD FILE: L:\5101-19\002\Acad\Sketch\510119002-SK103.dwg
Cardno Limited
All Rights Reserved.
NORTHBROOK CORPORATION PTY LTD
This document is produced by
Cardno Limited solely for the benefit
NOOSA ON WEYBA FOR APPROVAL
of and use by the client in
accordance with the terms of the
MASTER PLANNING
and shall not assume any Cardno (Qld) Pty Ltd | ABN 57 051 074 992 A.H.D. 3/09/2013 AS SHOWN A1
responsibility or liability whatsoever Springfield Tower, Level 6, 145 Sinnathamby Boulevard
Springfield Central, Qld 4300
to any third party arising out of any
PO Box 4480, Springfield, Qld 4300 ROAD 2
use or reliance by third party on the
content of this document.
Tel:07 3381 0111 Fax:07 3470 1241
Email: [email protected] Web: www.cardno.com.au DETAIL LAYOUT PLAN 5
Section 38
DATE PLOTTED: 24 September 2013 4:44 PM BY : PAUL JACUBA (SPRINGFIELD)
EUMU
NDI-NO
I
H
OSA R
OA D
I
J
H
L
I
XREF's: X-510119002-BDY-01; X-510119002-CONT-EX; X-510119002-DESIGN_STORMWATER; X-510119002-PRECINCT PLAN; X510119002-SWD-ZONES; X-510119002-DESIGN-06
K HOLLET ROAD
HOLLET
ROAD
TREATMENT DEVICE TABLE
E
IV
G
DR
D C B
Y
HA
TER
AL
W
F E B
A
PROPOSED STORMWATER TREATMENT AREAS
LEGEND
LAYOUT PLAN
Scale 1:5000
D
OA
LR
CAD FILE: L:\5101-19\002\Acad\Sketch\510119002-SK300.dwg
EL
W
TIDS
Cardno Limited
All Rights Reserved.
NORTHBROOK CORPORATION PTY LTD
This document is produced by
Cardno Limited solely for the benefit
NOOSA ON WEYBA FOR APPROVAL
of and use by the client in
accordance with the terms of the
MASTER PLANNING
and shall not assume any Cardno (Qld) Pty Ltd | ABN 57 051 074 992 A.H.D. 13/09/2013 AS SHOWN A1
responsibility or liability whatsoever Springfield Tower, Level 6, 145 Sinnathamby Boulevard
to any third party arising out of any Springfield Central, Qld 4300
PO Box 4480, Springfield, Qld 4300
use or reliance by third party on the
content of this document.
Tel:07 3381 0111 Fax:07 3470 1241
Email: [email protected] Web: www.cardno.com.au TRUNK STORMWATER MASTER PLAN 6
Section 39
Q1
DATE PLOTTED: 24 September 2013 4:45 PM BY : PAUL JACUBA (SPRINGFIELD)
Q1
Q100
00
0 0
Q1
Q100
00
Q1
00
00
Q1
0
Q10 Q1
00 00
Q1
Q100
Q100
Q100
Q100
Q1
Q1
0
Q100
0
Q100
00
Q1
00
Q100
00
Q1
0 0
Q1
Q10
00
Q100Q100
Q100
Q100 0
Q1
Q1
0
Q100
0
00
Q1
Q100
Q1
00
Q100 0
Q10
00
Q100 00
Q1
Q100
Q1
Q1
00 Q1
0 0
Q1
Q100
Q1
0 00 00
100
QQ1
Q100
Q100
00
Q1
Q1
Q100
00
Q100
Q100
00
Q1
Q1
Q1
00
0
Q1
Q100
0
00
Q100
00
Q1
Q100
Q100
00
Q1
Q1
Q1
00
Q100
Q1
Q100
00
Q1
00
00
Q10
Q1
0
Q1
Q100
Q100 0
00
00
00
Q10 Q100
Q100
Q100
Q1
Q1
Q1
0
Q100
0
0 0
Q100
00
Q100
Q100
Q1
Q100
Q100
Q1
Q1
00
Q100
Q1
Q100
00 Q100
Q100
00
Q100
Q100
Q1
Q100
Q100
00
Q1
Q100 00
Q1
Q100 Q100 Q100 0Q
0 100
Q1
Q1
0
00
Q110000
0Q100
00
00
Q
Q1 Q100
Q1
Q1
00
Q100
Q1
00
Q100
Q1
00
0
0
0
0
Q1
Q1
Q100
Q100 Q1
Q100
I
Q100
Q100
0
Q100 0
00
0 Q100
Q1
Q10 Q1
Q1
0
H
Q100
Q100
0
0 0
0
Q1
Q10 Q1
0
00
0
Q1
Q100
Q100
Q100
Q100 00
Q100
Q1
Q100
Q10
00 0
Q100
Q1
Q100
Q100
0
Q100
0
0
Q100
00
Q10
0
Q1 0 0
0
Q100
Q1
Q1
Q100
I
Q100
00
0
J
Q1
Q10
Q100
Q10 100
0
Q1
0
The text continues on section 40.
Used in these records
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.