                                                                                               Engineering Report
                                                                                                 Noosa on Weyba



The existing contours as can be seen on Sketch SK003 indicate there is less than 1m fall across the
diameter of the roundabout which will require minimal earthworks.
Infrastructure along Walter Hay Drive will be realigned as per normal roadworks upgrades if required.
 The assessment also indicates that there is sufficient area available to accommodate the roundabout
including reverse curves. With reference to the existing road reserves and property boundaries, the only
properties that are affected by the roundabout are the properties owned by the proponent of the submission
and therefore there is no concern.
It is also noted that the proposed reduced speed environment on Walter Hay Drive will provide additional
benefits in reducing the potential for fauna conflicts and reducing traffic noise.
A range of alternative connections to Walter Hay Drive were also considered through the design
development. A strengths and weaknesses assessment was carried out to determine the most suitable
intersection type. The assessment compared a staggered priority intersection, priority crossroads
intersection, roundabout intersection, signalised intersection and a grade separated intersection. Following
the assessment, it was determined that the roundabout intersection would be most suited to the site.
The Traffic Impact Assessment prepared by Cardno provides further details for the alternate connections.

3.1.2          Road 2
Cardno Sketch SK103 provides an indicative layout for the proposed Road 2 connection between precinct H
and Hollett Road (east). A detailed tree survey has been undertaken to enable selection of a suitable
alignment to minimise impact on the existing vegetation. The layout demonstrates that a significant portion of
the road footprint can be contained within the existing vegetation cleared area.
Prior to selection of the Road 2 alignment, an existing access driveway (located approximately 100m east of
the proposed alignment) was considered as an alternative Road 2 alignment. Following the ground truth,
flooding assessment and ecological assessment, it was determined that the alternative alignment would
have a greater impact on the environment.
The cross section of Road 2 has been modified to ensure there is minimal environmental disturbance. The
cross sections proposed, as detailed in Section 3.2 below, are adequate for safety and servicing the volume
of traffic predicted on this road, as well as minimising the footprint on the existing vegetation.
Localised widening has also been incorporated at the connection of Road 2 and Hollett road to allow for bus
turning movements.

3.2            Typical Cross Sections
Due to the environmental sensitivity of existing and proposed road alignments adjoining the conservation
and national park areas, it is proposed to utilise a combination of typical SCRC road cross-sections and
modified road cross-sections. Cardno Sketch SK101 indicates the typical cross-sections proposed for the
development.
Where sufficient area is available, the SCRC typical cross-sections have been utilised. In areas of ecological
sensitivity, modified typical sections have been utilised to reduce the extent of clearing. Road 2 and Hollett
Road (east) propose modified cross-sections incorporating a reduced pavement width of 7.4m. This
pavement width reduction will minimise the road footprint, whilst maintaining suitability for bus access. Three
modified typical sections are proposed, each section represents a difference scenario depending on the
existing contours, drainage requirements and cycle / pedestrian requirements.
Where applicable, the cross-sections maintain a 4m service corridor to one side, and 1m electrical easement
to the opposite side.
It is also noted that Road 2 and Hollett Road are part of the trunk road network and therefore proposed to be
SCRC controlled roads. To achieve the optimum ecological and road design outcome, modified cross-
sections have been proposed for these roads. Although these roads are not strictly in accordance with
SCRC policy, we believe this is a practical and ecologically beneficial outcome for the project.
Through the preparation of subsequent development applications and detailed design, further refinement
and analysis of the cross-sections will be undertaken.


October 2013                                        Cardno                                                     12

Used in these records

About this file

File size
61.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8- Amended Engineering Report MCU12_0208.pdf · 61.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.