                                                                                                Engineering Report
                                                                                                  Noosa on Weyba




9              Conclusion
Cardno has carried out an engineering assessment of the bulk earthworks, roadworks, stormwater drainage
and servicing for the development with paramount consideration to environmental protection. The report has
provided an assessment of the suitability of the site for development. In summary, the following conclusions
have been made:
> The development footprint is generally located within the existing cleared areas and minimal additional
  clearing will be required. Environmental sensitive design and construction techniques will be used to
  avoid impact on retained vegetation;
> Earthworks areas have been minimised to limit the impact on the existing vegetation. Excavation is
  generally confined to existing road reserves, proposed roads and the development footprint. Preliminary
  bulk earthworks modelling indicates that a balance cut to fill can be achieved, which could potential
  reduce impact on the surrounding community and Council roads;
> Significant consideration has been given to the environmental values of the site when determining both
  road location and cross sections to minimise disturbance to the natural environment. In general, the
  proposed roads are of an environmentally sensitive design and located within existing cleared areas
  where the impact on the vegetation can be minimised. Road design incorporates functionality and safety,
  whilst minimising the impact on the existing vegetation and recognising the need for fauna crossings;
> The retention of significant vegetation and reduced pavement widths encourage a lower speed
  environment whilst providing added safety to pedestrians, cyclists and wildlife;
> Where roads have been located between the Noosa Wildlife Refuge and the environmental protection,
  the minimum culvert height has been set at 1200mm, with a width of 2700mm, to allow for the safe
  passage of koalas and other animals.
> Minimal upgrades to Hollett Road and Tidswell Road are proposed to provide access points to the
  development. These roads are currently unsealed. The upgrade of existing Council roads will be
  undertaken on behalf of Council or by Council, at an agreed cost to the development;
> Due to the ecologically sensitive location of the site, appropriate stormwater quality treatment is of the
  upmost importance. The proposed WSUD strategy for the site includes community education, large
  rainwater tanks, bio-retention basins, vegetated swales and litter baskets;
> The flood study indicates there are no adverse impacts on flood levels and flows for surrounding
  properties for local and regional flood events. Flood attenuation is proposed through controlled culverts
  and detention basins at various locations. All development areas have sufficient flood immunity in
  accordance with SCRC requirements;
> The development provides an improved flood access for neighbouring properties and a reduction in the
  100 year ARI event the peak flood level around Lake Entrance Boulevard;
> A sewerage network analysis has been undertaken and determined the development can be
  accommodated with external augmentation to Pump Station NVL011 and the Noosa STP. Currently the
  Noosa STP is scheduled to be upgraded in December 2015. The assessment indicates connection to the
  existing network is possible to the north of the development;
> A conventional gravity sewer network is proposed to service the development. Several pump stations are
  required to convey to the flow to the existing network connection points. Alternative servicing strategies
  such as the use of low pressure sewers have been considered for this development. It is envisaged that
  subsequent development applications may result in alternative servicing strategies;
> A water network analysis has been undertaken and determined that no augmentation of the existing
  network is required to accommodate the development. Connection to the existing network is possible to
  the north of the development. A network of trunk mains and smaller mains is required internally to
  maintain Unitywater’s DSS within the development; and



October 2013                                         Cardno                                                    21

Used in these records

About this file

File size
61.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8- Amended Engineering Report MCU12_0208.pdf · 61.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.