Engineering Report
Noosa on Weyba
Table of Contents
1 Introduction 5
1.1 Proposed Development 5
1.2 Biodiversity Offset Area 6
1.3 Staging 6
2 Earthworks 7
2.1 Geotechnical Investigations 7
2.2 Demolition and Clearing 7
2.3 Excavation 7
2.4 Retaining Structures 8
2.5 Erosion and Sediment Control Plan 8
2.5.1 Phase 1 Construction – Site Setup Works 8
2.5.2 Phase 2 and 3 Construction – Bulk Earthworks and Civil Works 8
2.5.3 Monitoring 8
2.5.4 Reporting 9
2.5.5 Correction Action 9
2.6 Acid Sulfate Soils Management Plan 9
2.6.1 Performance Objectives 9
2.6.2 Performance Criteria 10
3 Roadworks 11
3.1 Trunk Road Alignment 11
3.1.1 Walter Hay Roundabout 11
3.1.2 Road 2 12
3.2 Typical Cross Sections 12
3.3 Existing Road Upgrades 13
3.4 Concrete Works 13
3.4.1 Shared Footpath 13
3.4.2 Kerb 13
4 Stormwater Management 14
4.1 Stormwater Quality Management 14
4.2 Flood Study 14
4.2.1 Minimum Floor Levels / Filling 15
4.2.2 Culvert Crossing 15
5 Sewerage Reticulation 16
5.1 External Connections 16
5.2 External Augmentations 16
5.3 Internal Network 16
6 Water Reticulation 18
6.1 External Connections 18
6.2 Internal Network 18
7 Integrated Water Cycle Management Plan 19
8 Preliminary Acoustic Analysis 20
9 Conclusion 21
October 2013 Cardno iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.