Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Attachment 8- Amended Engineering Report MCU12/0208

of 109

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (61.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

                                                                                        Engineering Report
                                                                                          Noosa on Weyba




Table of Contents
1      Introduction                                                                                     5
       1.1     Proposed Development                                                                            5
       1.2     Biodiversity Offset Area                                                                        6
       1.3     Staging                                                                                         6
2      Earthworks                                                                                       7
       2.1     Geotechnical Investigations                                                                     7
       2.2     Demolition and Clearing                                                                         7
       2.3     Excavation                                                                                      7
       2.4     Retaining Structures                                                                            8
       2.5     Erosion and Sediment Control Plan                                                               8
               2.5.1     Phase 1 Construction – Site Setup Works                                               8
               2.5.2     Phase 2 and 3 Construction – Bulk Earthworks and Civil Works                          8
               2.5.3     Monitoring                                                                            8
               2.5.4     Reporting                                                                             9
               2.5.5     Correction Action                                                                     9
       2.6     Acid Sulfate Soils Management Plan                                                              9
               2.6.1     Performance Objectives                                                                9
               2.6.2     Performance Criteria                                                                 10
3      Roadworks                                                                                      11
       3.1     Trunk Road Alignment                                                                           11
               3.1.1     Walter Hay Roundabout                                                                11
               3.1.2     Road 2                                                                               12
       3.2     Typical Cross Sections                                                                         12
       3.3     Existing Road Upgrades                                                                         13
       3.4     Concrete Works                                                                                 13
               3.4.1     Shared Footpath                                                                      13
               3.4.2     Kerb                                                                                 13
4      Stormwater Management                                                                          14
       4.1     Stormwater Quality Management                                                                  14
       4.2     Flood Study                                                                                    14
               4.2.1    Minimum Floor Levels / Filling                                                        15
               4.2.2    Culvert Crossing                                                                      15
5      Sewerage Reticulation                                                                          16
       5.1     External Connections                                                                           16
       5.2     External Augmentations                                                                         16
       5.3     Internal Network                                                                               16
6      Water Reticulation                                                                             18
       6.1     External Connections                                                                           18
       6.2     Internal Network                                                                               18
7      Integrated Water Cycle Management Plan                                                         19
8      Preliminary Acoustic Analysis                                                                  20
9      Conclusion                                                                                     21




October 2013                                      Cardno                                                iii

Used in these records

About this file

File size
61.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8- Amended Engineering Report MCU12_0208.pdf · 61.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.