Council archive · source document
Attachment 8- Amended Engineering Report MCU12/0208
Very large file (61.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 30, section 1. The text section number identifies this passage in the reader.
DATE PLOTTED: 24 September 2013 4:57 PM BY : PAUL JACUBA (SPRINGFIELD)
GENERAL
SITE
ROADWORKS
STORMWATER/FLOODING
GENERAL TRUNK SERVICES
LOCALITY PLAN
NOT TO SCALE
CAD FILE: L:\5101-19\002\Acad\Sketch\510119002-SK001.dwg
Cardno Limited
All Rights Reserved.
NORTHBROOK CORPORATION PTY LTD
This document is produced by
Cardno Limited solely for the benefit
NOOSA ON WEYBA FOR APPROVAL
of and use by the client in
accordance with the terms of the
MASTER PLANNING
and shall not assume any Cardno (Qld) Pty Ltd | ABN 57 051 074 992 A.H.D. 13/09/2012 AS SHOWN A1
responsibility or liability whatsoever Springfield Tower, Level 6, 145 Sinnathamby Boulevard
Springfield Central, Qld 4300
XREF's:
to any third party arising out of any
PO Box 4480, Springfield, Qld 4300
use or reliance by third party on the
content of this document.
Tel:07 3381 0111 Fax:07 3470 1241
Email: [email protected] Web: www.cardno.com.au LOCALITY PLAN AND SCHEDULE OF DRAWINGS 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.