Engineering Report
Noosa on Weyba
1 Introduction
This report has been updated in response to the Request for Information (RFI) from Sunshine Coast
Regional Council, dated 28th February 2013. The responses to this request are contained within the report.
We have provided an index in Appendix G, which locates the responses to the relevant RFI items within the
report for ease of reference.
Northbrook Corporation Pty Ltd has commissioned the services of Cardno (Qld) Pty Ltd to prepare an
Engineering Report for the proposed Noosa on Weyba Development (the development) situated at Walter
Hay Drive, Noosa.
This engineering report will accompany the Development Application for a Preliminary Approval overriding
the Planning Scheme under Section 242 of the Sustainable Planning Act 2009.
Cardno has carried out an engineering assessment of the bulk earthworks, roadworks, stormwater drainage
and servicing in order to demonstrate the site is suitable for development. This assessment has been based
on the proposed layouts found in Appendix A and prepared by ML Design:
Structure Plan (MP-005) - this is used for reference, but is not part of the Preliminary Approval.
Precinct Plan (MP-006) - this is the plan that forms part of the Preliminary Approval.
To support this report, engineering sketches have been prepared and included within Appendix C.
The objectives of this assessment are to:
> Undertake a site inspection to confirm the existing conditions and determine suitability for development
from a civil engineering perspective;
> Understand the overall earthworks cut and fill requirements for the development;
> Ensure the layout generally complies with horizontal and vertical road design requirements;
> Select suitable road cross-section profiles with consideration to the environment, functionality and safety;
> Ensure sufficient space and functionality of stormwater treatment devices and drainage structures;
> Ensure the site can be adequately serviced with connection to water and sewer networks;
> Ensure the proposed pad and road levels provide flood immunity and appropriate evacuation routes;
> Ensure the development is designed so that suitable provision for public transport can be achieved;
> Review relevant Local and State guidelines, policies and plans to ensure general compliance; and
> Ensure the project can be developed in a manner that protects the environment using the latest urban
design principles.
1.1 Proposed Development
The development is located within Sunshine Coast Regional Council (SCRC), in the suburbs of Noosaville
and Weyba, south of the Noosa CBD. The site is traversed by two existing road reserves, north-south
Walter Hay Drive, and east-west Hollett Road. Cardno Sketch SK001 (Appendix B) indicates the site’s
location.
The total site area is 303ha consisting of Lot 1667 on M3772, Lots 11 and 12 on RP 893393, Lot 2 on
RP160983, Lot 7 on RP46782, Lot 53 on SP16357 and Lot 2 on SP179590. Drawing No M2090-001
‘Constraints Plan 1’ prepared by JFP and included within Appendix 2 details the applicable land parcels and
current zoning.
The development proposes to redefine the existing lots into approximately 139.5ha of koala habitat
protection / enlargement of the Noosa National Park, approximately 105.5ha of environmental protected land
and approximately 58ha of net development area. The development will consist of community title schemes
October 2013 Cardno 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.