Preliminary Erosion & Sediment Control Strategy
Noosa on Weyba
Table of Contents
1 Introduction 1
2 Existing Site and Proposed Development 2
2.1 Existing Site Description 2
2.2 Developed Site Description 2
3 Performance Criteria 3
4 Available Management Practices 4
5 Preliminary Soil Loss Assessment 6
5.1 Preliminary Soil Loss Calculations 6
5.2 Preliminary Sediment Basin Calculations 7
6 Erosion and Sediment Control Strategy 8
6.1 Objective / Target 8
6.2 Compliance Criteria 8
6.3 Control Measures 8
6.3.1 Phase 1 Construction – Site Setup Works 8
6.3.2 Phase 2 and 3 Construction – Bulk Earthworks and Civil Works 8
6.4 Monitoring 10
6.4.1 Sediment Basin Monitoring 10
6.5 Responsible Person / Organisation 10
6.6 Reporting 10
6.7 Correction Action 11
7 References 12
Appendices
A REFERENCE DRAWINGS
B FIGURES & SKETCHES
Tables
Table 3-1 Discharge Performance Criteria 3
Table 4-1 Drainage Control Measures 4
Table 4-2 Velocity Control Measures 4
Table 4-3 Erosion Control Measures 4
Table 4-4 Sediment Control Measures 5
Table 5-1 RUSLE Soil Loss Estimate 6
Table 5-2 Sediment Basin Sizing Calculations 7
27 September 2013 Cardno iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.