Council archive · source document
Attachment 8- Amended Engineering Report MCU12/0208
Very large file (61.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 75, section 1. The text section number identifies this passage in the reader.
DATE PLOTTED: 9 October 2013 3:43 PM BY : GLEN TAYLOR (GOLD COAST)
Basin I5
I5
D RIVE
1.93 Ha Basin H 3
HAY
H3
TER
Basin I4
1.41 Ha
WAL
Basin J
J
Basin I3
I4
3.90 Ha
H2
2.79 Ha
1.77 Ha
Basin H2
I3
2.78 Ha
Basin I2 H1
2.09 Ha
Basin H1
1.48 Ha
I2
3.83 Ha
0.31 Ha
0.68 Ha
Basin I1
CAD FILE: C:\Apps\MR_CUST\ACAD\ACAD2011\TempDwgLocation\AcPublish_3420\510119002-SK910 - SK912.dwg
I1
3.94 Ha
XREF's: X-510119002-BASE; X-510119002-PRECINCT PLAN; X-510119002-CONT-EX
0.73 Ha
HOLLET
ROAD
Basin G4
Cardno Limited
G4
NORTHBROOK CORPORATION PTY LTD
All Rights Reserved.
This document is produced by
Cardno Limited solely for the benefit
NOOSA ON WEYBA PRELIMINARY
of and use by the client in
accordance with the terms of the
and shall not assume any Cardno (Qld) Pty Ltd | ABN 57 051 074 992 A.H.D. MAY 2013 AS SHOWN A1
responsibility or liability whatsoever Springfield Tower, Level 6, 145 Sinnathamby Boulevard
Springfield Central, Qld 4300
to any third party arising out of any
PO Box 4480, Springfield, Qld 4300 EROSION AND SEDIMENT CONTROL
use or reliance by third party on the
content of this document.
Tel:07 3381 0111 Fax:07 3470 1241
Email: [email protected] Web: www.cardno.com.au LAYOUT PLAN - SHEET 2 OF 3 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 8- Amended Engineering Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 61.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.