Skip to the record
Accept no imitations.

Original source · versioned page text

2016-07-18 General Committee Meeting - Item 3 - Attachment 1 - Flood Management Plan

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
    General Committee Meeting 18/07/2016
    Item 3 Attachment 1


          Noosa Shire
                Flood
          Management
                 Plan




   A F T
DR
        “The direction for future
             flood management
           initiatives in Noosa.”


                   PO Box 141 Tewantin QLD 4565
                P (07) 5329 6500 | F (07) 5329 6501
                            [email protected]
                         www.noosa.qld.gov.au
Log in to download the original file

2016-07-18 General Committee Meeting - Item 3 - Attachment 1 - Flood Management Plan(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 41 sections

Section 2

                        A F T
                     DR

© Noosa Council 2016

General enquires: 8.30 am – 5.00 pm Monday to Friday (excluding public holidays)
By telephone: (07) 53296500 (including after-hours emergencies)
By email: [email protected]
Fax: (07) 53296501
Street Address: 9 Pelican Street, TEWANTIN
Postal Address: PO Box 141, TEWANTIN QLD 4565
www.noosa.qld.gov.au

Disclaimer
This document has been developed by Noosa Shire Council’s Strategic Planning Unit with input from across Council’s other business units.
Information contained in this document is based on available information at the time of writing. All figures and diagrams are indicative only and
should be referred to as such. This is a strategic document which deals with technical matters in a summary way only. Council or its officers accept
no responsibility for any loss occasioned to any person acting or refraining from acting in reliance upon any material contained in this document.


Acknowledgements
Council wishes to thank all interested stakeholders who have taken the time and energy to help guide the development of this plan. Council would
particularly like to thank HydraLogic for their valued assistance with helping to prepare the plan and background information.




                                                                                                     Noosa Council | Flood Management Plan | Page 2

Section 3

Contents   Exectuive Summary................................................................................... 5




                F T
           1.		Introduction................................................................................. 6




           DR A
           2.		 Flooding in Noosa........................................................................ 7

           3.		 History of Flooding in Noosa..................................................... 10

           4.		 Flood Management in Noosa..................................................... 13

           5.		 Flood Studies.............................................................................. 15
           5.1		 Noosa River Catchment Flood Studies........................................................ 15
           5.1.1       Noosa River Flood Study ....................................................................................... 15
           5.1.2       Emerging Issues and Concerns for the Noosa River .......................................... 16
           5.1.3       Noosa Daintree Estate............................................................................................. 17
           5.1.4       Ringtail Creek........................................................................................................... 18
           5.1.5       Lake Entrance Boulevard........................................................................................ 18
           5.2		 Kin Kin Creek............................................................................................... 18
           5.3		 Six Mile Creek............................................................................................... 19
           5.3.1       Lake Macdonald....................................................................................................... 19
           5.3.2       Cooroy Creek........................................................................................................... 19
           5.3.3       Cooroora Creek........................................................................................................ 20
           5.4		 Coastal and Storm Tide Studies................................................................... 21
           5.5		 Key initiatives – Flood studies..................................................................... 21

           6.		 Flood Mapping............................................................................ 22
           6.1		 Noosa Planning Scheme Flood Hazard Area............................................... 22
           6.1.1       2016 Planning Scheme Amendment - Flood Hazard Area .............................. 22
           6.2		 2014 Disaster Management Flood Maps ..................................................... 23
           6.3		 Online flood mapping resources.................................................................. 23
           6.4		 GridFlow flood extent estimation................................................................ 23
           6.5		 Key initiatives – Flood mapping.................................................................. 24

           7.		 Flood Records and Survey.......................................................... 25
           7.1		 Historical Flood records .............................................................................. 25
           7.2		 Flood Gauges................................................................................................ 26
           7.2.1       Maximum Height Gauges....................................................................................... 26
           7.2.2       Radio Telemetry Gauges......................................................................................... 26
           7.3		 Flood Studies Survey.................................................................................... 27
           7.3.1       Ground survey.......................................................................................................... 27

Section 4

Contents   7.3.2		 Bathymetric Survey ................................................................................................ 27




                  T
           7.3.3        Waterway Crossing Survey .................................................................................... 28




              A F
           7.4		 Key initiatives – Flood records and survey.................................................. 28




           DR
           8.		 Flood Search Information ......................................................... 29
           8.1		 Key initiatives – Flood Search Information................................................. 29

           9.		 Planning and Policy.................................................................... 30
           9.1		 Noosa Planning Scheme............................................................................... 30
           9.2		 Climate Change............................................................................................ 31
           9.3		 Key initiatives – Planning and policy.......................................................... 32

           10.		 Disaster Management ................................................................ 33
           10.1		 Disaster Management Preparations............................................................. 33
           10.1.1       Disaster management flood maps......................................................................... 33
           10.1.2       Disaster management triggers................................................................................ 34
           10.1.3       Disaster management redundancy........................................................................ 34
           10.1.4       Real-time flood monitoring.................................................................................... 35
           10.2		 Disaster Management Activations............................................................... 35
           10.2.1       Trained staff resources............................................................................................. 35
           10.2.2       Overall understanding of flood specific procedures........................................... 36
           10.3		 Community Awareness................................................................................. 36
           10.4		 Flood Mitigation........................................................................................... 36
           10.5		 Key initiatives – Disaster management........................................................ 37

           11.		 Implementation and Review...................................................... 38

           Glossary................................................................................................... 39

Section 5

Executive Summary
                   A F T
                DR
The purpose of the flood management plan is to provide      A Capacity Assessment was carried out to review the
a key strategic document to facilitate a consistent         organisation’s flood management capacity across these
understanding within the community and the organisation     core areas. The Capacity Assessment established a
of Council’s flooding resources and direction for future    series of performance targets and recommended some
flood management in Noosa. The Plan and its supporting      desired outcomes to achieve these targets with the aim of
documents act as a central reference for communicating      increasing the overall flood management capability of the
Council’s existing knowledge and capacity in flood          organisation. Key outcomes have been carried forward into
management and as a guide for directing future investment   this plan.
and implementation of actions towards improving the
community’s understanding and resilience to flood risks.    The plan also provides the background context of flooding
                                                            in Noosa, summarises Council’s flooding resources,
The overall aim is that the Noosa community and council     identifies emerging issues and concerns within the
are well informed about flood risk and well prepared for    catchment, waterways and floodplains and establishes key
significant flood events. This can be achieved by Noosa     initiatives to address these.
Council, residents and businesses having access to best
available flood information including past, present and     The plan has been developed as a whole of council
future flooding conditions; ensuring flood resources are    initiative with input from the various council business
up to date, reflect local conditions and take account of    areas. The implementation plan will be reviewed and
existing and future climate; ensuring flood management      updated annually for consideration in annual operational
and disaster management activities are well coordinated     planning and budget processes. Council looks forward to
and communicated across all stakeholders; and ensuring      working with other tiers of government, local businesses,
services are delivered that help protect the community,     community organisations and individual residents to
improve community resilience and improve public access      implement this Plan.
to information.

The plan identifies three core areas:

1. Flooding Resources - information such as flood
   studies, mapping , records, survey and flood searches

2. Planning and policy in Council’s planning scheme,
   building controls and other strategic and operational
   plans, and development assessment

3. Disaster management - how Council prepares for and
   responds to a flood event, community awareness and
   flood mitigation works.




                                                                               Noosa Council | Flood Management Plan | Page 5

Section 6

         1
                      A F T
    Introduction
                   DR
Flooding affects large areas of Noosa Shire and can have          The elements which comprise the Flood Management Plan
considerable consequences for people and property.                and the process for preparing it are shown in the diagram
Council recognises that in order to reduce the risks              below. This has involved the collation of flood studies,
of flooding to communities, assets, economies and                 mapping and records into an online flood information
environments it is important that lessons from the past           repository to improve access to flooding resources;
and advances in knowledge and technology are recorded,            preparation of a background report overviewing the
effectively communicated and applied. Long term planning          historical context of flooding in Noosa, Council’s flooding
and prioritising having regard to both current and future         resources, and emerging issues; and a capacity assessment
climate conditions is important for improving community           of where the organisation is currently at in terms of its
flood resilience.                                                 flood management capabilities.

The Flood Management Plan seeks to improve the Council            Based on the findings, the flood management plan has been
and community’s understanding, preparedness and                   established, including a set of core areas and key initiatives
resilience to flood risk. It provides the basis for coordinated   for each core area. These have guided the development of
decision making, investment, information sharing and              the five year implementation plan.
record keeping.




                                                                                        Noosa Council | Flood Management Plan | Page 6

Section 7

         2
                     A F T
                                                             The contributing catchments of Six Mile Creek are




                   R
                                                             predominantly rural land uses and bushland with




                 D
                                                             watersheds originating from the relatively steep hillsides
                                                             of the area and often inundating low lying property and
                                                             roadways. The Six Mile Creek watercourse and floodplain
                                                             intersects several significant hinterland road networks,
     Flooding in                                             such as Louis Bazzo Drive, Pomona Kin Kin Road and
        Noosa                                                Queens St Cooran.

                                                             Flooding in Six Mile Creek is solely the result of rainfall
The Noosa Council local government area is divided by        runoff and local terrain and features. The waterways of Six
catchments contributing eastwards to the Noosa River or      Mile Creek are unaffected by any tidal conditions.
westward towards the Mary River. Approximately two
                                                             Flood levels in the Noosa River are determined by heavy
thirds of the Noosa River catchment lies within the Shire
                                                             rainfalls generating catchment runoff which drain into
boundary with the remainder extending to the north
                                                             the Noosa River system. Elevated water levels in Laguna
above Lake Cootharaba and draining from the sands of the
                                                             Bay, principally due to storm surge, can cause flooding
Cooloola National Park within Gympie Regional Council.
                                                             in the lower reaches and also impede the discharge of
Refer to Figure 2.
                                                             rainfall derived floodwaters from the river. Local flooding
Six Mile Creek flows northwest from the southern             refers to flooding along the upper reaches of creeks and
boundary of the Shire and is the largest waterway draining   waterways. Local flooding is caused by heavy rainfalls
the western portion of the Shire towards the Mary River.     over local upstream catchment areas and may not be
The Six Mile Creek catchment to Cooran is over 185 km2       associated with flooding from the river.
in area, bordered by Mount Tinbeerwah to the east, Black
Mountain to the south and the Kin Kin Creek catchment
to the north. Six Mile Creek includes two significant
tributaries of Cooroy Creek and Cooroora Creek and the
Lake Macdonald water supply dam owned and operated
by SEQWater. The dam was built in 1965 and its ungated
spillway raised in 1980 to increase the dam’s storage
capacity. The hinterland settlements of Cooroy, Pomona,
Lake Macdonald and Cooran were founded adjacent to the
local water courses of the area and hence have inherited
some vulnerability to flooding.




                                                                           Noosa Council | Flood Management Plan | Page 7

Section 8

                                   T
Downstream of Tewantin, peak flood levels are governed        The Noosa River catchment is large and much of it is




                               A F
by storm surge flooding; upstream of Tewantin, peak flood     relatively flat. The two large lakes along the river, Lakes




                            DR
levels are governed by freshwater river flooding behaviour.   Cootharaba and Cooroibah, provide large storage areas
                                                              which also slow down the flow of flood water on its way
                                                              to the river mouth. Lakes Cootharaba and Cooroibah exert
                                                              a significant effect on river flooding behaviour along the
                                                              Noosa River. Floodwaters generated from catchment areas
                                                              upstream of these lakes spread out across the waterbody




Figure 2: Map of major waterways and catchments.




                                                                                      Noosa Council | Flood Management Plan | Page 8

Section 9

                        F T
as they drain through the lake. The lakes provide a          Apart from regular ocean tides, storm surges affect




                      A
significant amount of temporary storage for passing          water levels in Laguna Bay and flood levels in the lower




                    R
floodwaters. Downstream of the lakes the temporary           reaches of Noosa River. Increased water levels in Laguna




                  D
storage of floodwaters: reduce peak water levels and         Bay result in coastal waters flowing into the Noosa
discharges; slows the rate of rise of floodwaters (flood     River and its lakes, with an associated increase in water
levels typically rise for 1-2 days at Tewantin before        levels. Storm tide flooding can inundate normally dry
peaking); and assist with maintaining elevated flood         land and affect property even without the contribution
levels and discharges for a relatively long period of        of additional rainfall generated flooding in the River.
time (eg. at Tewantin, the February 1992 flood level         The magnitude of a storm surge is determined by
remained over 1.5 m AHD for 45 hours).                       a combination of factors which include: inverted
                                                             barometric pressure; wind setup; and wave setup. These
Flooding behaviour along the Noosa River, especially         affects are cumulative and are added to the normal tidal
its lower more populated reaches, is characterised           conditions at the time. The combined water level from
by relatively low flood depths with generally slow           all of these is referred to as the storm tide. Offshore
moving floodwaters which may persist for extended            storm tide gauges are used to record storm tide levels.
periods which increase inconvenience and nuisance.           The nearest gauge to Noosa River is located offshore of
Fortunately, relatively long ‘warning times’ are available   Mooloolaba.
in which downstream residents can be alerted to the
severity and timing of impending flooding and can            In a similar manner to flood studies, storm tide studies
undertake necessary actions to reduce damage to their        are undertaken to estimate the potential magnitude of
goods and possessions.                                       storm surges for a range of statistical frequencies. Whilst
                                                             generally conducted separately, results of a storm tide
With respect to the consequences of flooding, the main       study are included as a possible boundary condition in
issues along the Noosa River relate to the modest level of   the flood studies to reflect circumstances when the two
flood damage and the nuisance and inconvenience that         events (i.e. storm surge and rainfall flooding) occur at
flooding causes urban communities. As noted above,           the same time. It is a complex science to consider the
flood hazard and risk to life and limb are generally low     coincidence of storm surges and extreme rainfall events.
along the Noosa River system.
                                                             The future of flooding in Noosa is unpredictable. Severe
Normal water levels in the lower Noosa River estuary         weather events that bring flooding will occur. However,
display tidal characteristics and reflect the semi-diurnal   recent research into the world’s changing climate
nature (i.e. there are two high tides and two low tides in   suggests that over time factors such as increased ocean
every period of 24 hours 50 minutes) of water levels in      water levels and increased frequencies of severe weather
Laguna Bay. Water levels in the river will rise and fall     may result in an overall increase in the magnitude and
in response to the tide levels. These affects are greatest   frequency of significant flood events. As a community
at the mouth and progressively dissipate upstream with       with a large proportion of its residents located near the
only relatively minor tidal fluctuations evident in Lake     coast and adjacent to waterways it is imperative that
Cootharaba.                                                  these factors be considered in our long term planning
                                                             for the region.




                                                                                       Noosa Council | Flood Management Plan | Page 9

Section 10

        3
                    A F T
                 DR
                                      “Some of the earliest references to flooding in the region date back
    History of                        to the late 1800’s.”
Flooding in Noosa


Like all areas of Australia, Noosa’s heritage includes        Shortly after this time a communal agricultural
thousands of years of Aboriginal history. However,            settlement began around Lake Weyba in the lower Noosa
little is known of significant weather events and their       River area made up of Brisbane people dispossessed by
impact on the lives of the traditional inhabitants of the     the 1893 floods.
area prior to the arrival of European settlers. The local
modern history of the region is often interspersed with       A handful of historical flood levels recorded in March
severe weather events resulting in shipwrecks and the         1955 represent the commencement of “official” flood
search and rescue of their survivors. It wasn’t until the     records held by the Noosa Council. These records were
mid-1800’s that official surveys and reconnaissance of        further supplemented following a significant flood event
the area were conducted. These early expeditions were         in February 1968.
seeking access to the region’s timber and the River offered
a useful means for transporting timber to the coast for
shipping to Brisbane.

The clearing of large areas of timber within the catchment
and its replacement with orchards, pastures and sugar
cane would have introduced the first significant man
made change to the runoff characteristics of the river
system. Cleared catchments typically have faster runoff
rates and combined with the inherent disturbance to the
ground cleared catchments will often lose large amounts
of topsoil due to erosion. The eroded soil is transported
into local waterways and water bodies often smothering
aquatic ecosystems and reducing their depth and
subsequent capacity to convey flood waters.

Some of the earliest references to flooding in the region
date back to the late 1800’s. During the “Brisbane” floods
of 1893 there are recounts of rain falling for nine days
during which Lake Cootharaba rose by two metres.
                                                              February 1931 Milk Delivery Noosa Council Library Archives




                                                                                              Noosa Council | Flood Management Plan | Page 10

Section 11

Whilst still sparse the recorded water levels in the lakes and
the River from this event remain the highest on record.

The early 1970’s saw a series of successive flood events
impact upon South East Queensland. Cyclones in 1972
(Daisy), 1974 (Wanda) and 1976 (David) delivered
rainfall and flooding across the region and storm surges
to exposed coastal areas. These events impacted heavily
upon the development of Noosa Sound. As a result of
this and negotiations between the Noosa Council and the
state government walls and groynes were put in place to
protect the beach and Noosa Sound. Many of these walls                February 1992 Gympie Terrace Noosa Council Library Archives
are still in place today and continue to serve residents and
the community.
                                                                      depths of 744mm in 24 hours and 960mm over 72 hours
The following two decades were relatively uneventful with             were recorded. These values correlate as an extreme weather
regards to flooding however in February 1992 a complex                event with the severity of the rainfall being estimated as
meteorological event produced a low pressure trough                   being equivalent to a storm with a statistical recurrence
convergence zone in the wake of a departing cyclone (TC               interval of up to 1 in 4,000 years1.
Damon).
                                                                      The February 1992 flood event inundated some 540 lots,
Coastal sea levels were elevated by the storm surge effects           156 of them above floor level, and caused some $1.3
of the cyclone however; fortunately these coincided with              million damage (1995$). The average damage bill for urban
lower seasonal tides. Across the catchment large volumes              communities along the Noosa River system was calculated
of rainfall fell over relatively short durations. Rainfall            in 1995 as being approximately $250,000 per annum2.




February 1931 Anderson’s House, Noosa Council Library Archives



1
 Table 2.7 Flooding in the Noosa River Catchment 1995, updated 2001
2
 Table 4.2 Flooding in the Noosa River Catchment 1995, updated 2001




                                                                                          Noosa Council | Flood Management Plan | Page 11

Section 12

In August 2007, in association with an upper trough              More recent severe weather events that have impacted




                             T
system and an east coast low (ECL) several rainfall stations     more broadly upon south east Queensland such as the




                           F
in Noosa recorded rainfall depths of greater than 650mm          2011 Brisbane Floods, 2013 ex TC Oswald and 2015 ex TC




                         A
in 24 hours.                                                     Marcia have not resulted in significant flooding conditions




                      DR
                                                                 within Noosa Shire. However; many low lying areas of
The flood levels reached in the Noosa River were the             Noosa Shire are prone to flooding from small to medium
highest since 1992 and the third highest on record. This         sized rainfall events. These locations are subjected to more
caused significant flooding in Lake Cooroibah and Lake           regular nuisance flooding that does not generate significant
Cootharaba and moderate flooding at Tewantin. The                loss to the community.
Bureau of Meteorology reported that this particularly rare
event broke many monthly records for August with some            Upon reflection, Noosa Shire has been relatively fortunate
daily totals being the highest on record for any month. The      to not have borne the brunt of some of the broader region’s
most statistically significant rainfall intensity was recorded   more significant flood events. However, the historical
at Coops Corner TM in the river headwaters above Lake            records are relatively short and the Shire’s coastal proximity,
Cootharaba. In only a 3 hour period a total of 415mm             river estuaries and flood plains provide good reason to be
of rainfall was recorded. Water levels in the Lakes and at       vigilant in determining and managing the risks associated
Tewantin remained elevated above minor flood levels for          with flooding.
3 to 4 days.




February 1992 Gympie Terrace Noosa Council Library Archives




                                                                                      Noosa Council | Flood Management Plan | Page 12

Section 13

     4
                  F T
                   Flood Management in Noosa



             DR A
The overall aim for this flood management plan
process is that the Noosa community and council are
well informed about flood risk and well prepared for
significant flood events. This can be achieved through
the following desired outcomes –
                                                         •



                                                         •
                                                             Flood resources are up to date, reflect local
                                                             conditions and take account of existing and future
                                                             climate;

                                                             Flood management and disaster management
                                                             activities are well planned, coordinated and
•   Noosa Council, residents and businesses have             communicated across all stakeholders ;
    access to best available flood information for the   •   Services are delivered that help protect the
    region;                                                  community, improve community resilience and
•   Information on past, present and future flooding         improve public access to information.
    conditions is available and utilised to inform
                                                         Council works with the community to manage flood
    planning and decision making;
                                                         risks and build community resilience in a number of
                                                         ways.




                                                                           Noosa Council | Flood Management Plan | Page 13

Section 14

Flood management priorities have been considered under three core areas -




The following core principles describe the purpose of each core area and provide focus to the key initiatives and
actions arising from this plan.

1.    Flooding Resources
      Core principle 1: To make flood mapping accessible, informative and relevant
      Core principle 2: To understand existing and future flooding conditions
      Core principle 3: To learn from the past

2.    Planning and policy
      Core principle 4: To plan for existing and future climate conditions
      Core principle 5: To improve public access to information

3.    Disaster management
      Core principle 6: To improve community resilience
      Core principle 7: To prepare for flood events
      Core principle 8: To protect our communities




                                                                                  Noosa Council | Flood Management Plan | Page 14

Section 15

             5
                     A F T
                  DR
      Flood Studies




Noosa Council has a suite of flood studies which cover                    5.1.1       Noosa River Flood Study
most of the major waterways and floodplains of the region.
The age and origin of these studies varies from catchment                 The first major flood study of the Noosa River was
to catchment however, prior to de-amalgamation the                        completed in 1995 by consultants John Wilson and Partners
                                                                          (JWP)3. The model is comprised of two separate modelling
Sunshine Coast Council had attempted to standardise
                                                                          components. The first being the hydrology model which
some of the model approaches and generate a suite of
                                                                          determines the amount of runoff generated from rainfall
relatively consistent flood studies across the region.
                                                                          falling on contributing catchments; and the second being
                                                                          the hydraulic model which determines the depth, extent and
The following sub-sections present a brief summary of the
                                                                          speed of the runoff (i.e. the flood waters) as they flow along
flood studies available for each of the major catchments
                                                                          the main waterway corridor(s) of the river. The original
and waterways of the Shire. Further details and documents
                                                                          flood study utilised a combination of RAFTS hydrological
associated with each of the studies discussed here can be
                                                                          modelling and one dimensional (1D) MIKE11 hydraulic
found via the Council’s Flood Information Repository                      modelling. 1D modelling refers to the basic “spine and rib”
established as part of this Plan.                                         structure of the model. The spine being the waterway and
                                                                          the ribs being linear cross sections of the terrain and river
The community can assess information from this repository
                                                                          bed profile spaced along the River.
through an online flood search request.
                                                                          Calibration of the original flood study models was
5.1 Noosa River Catchment Flood                                           primarily limited to a single historical event recorded in
    Studies                                                               February 1992. The event was considered a major flood
                                                                          event with a reasonable selection of recorded flood levels
The Noosa River catchment covers approximately 106,000                    for calibration. Another major flood event had occurred
hectares and extends from the Cooloola National Park in                   in 1968 however records for this event were sparse and
the north to the coastal township of Peregian in the south.               in some cases determined to have been unreliable and
                                                                          inconsistent with other relative historical records. Other
The catchment accounts for approximately half of Noosa                    significant historical events which occurred within the
Council local government area.                                            catchment and river system in the early to mid 1970’s were
                                                                          determined to have been too minor for calibration.



3
    Noosa River Flood Study Noosa River Flood Study, by John Wilson & Partners Pty Ltd and Lawson & Treloar Pty Ltd, May 1995.




                                                                                            Noosa Council | Flood Management Plan | Page 15

Section 16

Three other minor historical events (January 1976, May        Existing climate scenarios are used to inform the disaster




                         T
1985 and June 1985) were used for model verification.         management mapping for the Noosa River. This model




                       F
                                                              continues to utilise the combination of RAFTS hydrological




                     A
The findings of this study and subsequent associated
                                                              modelling and MIKE11 hydraulic modelling that was




                   R
investigations have formed the basis of planning and
                                                              established by JWP in 1995.




                 D
decision making in the River for almost 20 years.

In late 2013, prior to de-amalgamation and as part of a       5.1.2     Emerging Issues and Concerns for the
region-wide flood hazard mapping project, the Sunshine                  Noosa River
Coast Council (SCC) revised and re-ran the design event       5.1.2.1   Foreshore Erosion          and     Flood      Velocity
temporal patterns for all flood models within the Noosa                 Distributions
Council area.
                                                              Several locations along the foreshores of the lower Noosa
The revised design rainfall patterns represent Duration       River and Weyba Creek are currently experiencing shoreline
Independent Storm (DIS) patterns derived from Australian      erosion. In some locations the erosion is threatening
Rainfall and Runoff (AR&R) Intensity Frequency and            infrastructure, reducing accessibility and impacting upon the
Duration (IFD) curves for this region.                        amenity of the shoreline. Council is seeking to understand
                                                              the origin of the erosive forces which are contributing to
For the Noosa River the SCC 2013 update also included
the modifications to cross section depths for the river       the shoreline erosion with the view of developing further
bathymetry near to the river mouth (as applied in the 1995    mitigation plans and works to reduce these forces and where
model) and the inclusion of dynamic tailwater boundary        possible to rehabilitate these sites.
conditions for Laguna Bay.
                                                              Unfortunately, the 1D structure of the original Noosa
The dynamic tide boundary assumed the probability of the      River Flood Study was only suitable for providing a
river flood matched the probability of the storm tide with    broad understanding of the anticipated extents of flood
the peak of the storm tide timed to coincide with the peak    inundation from a variety of flood events and provided
of the rainfall.                                              limited insight into the distribution of flood velocities
                                                              across the river and adjacent floodplains.
The SCC 2013 model updates included model scenarios for
both existing and future climates. Future climate scenarios   Whilst still valid, 1D modelling is rapidly being replaced
were used as the basis for the 2016 amendment to the          by 2D modelling which allows improved representation
Planning Scheme Overlay’s flood hazard area.                  of the terrain surfaces and a more contiguous modelling
                                                              approach. 2D models are typically favoured in locations
                                                              with relatively flat waterway gradients and adjacent flood
                                                              plains, such as in the lower reaches of the Noosa River
                                                              system. Contemporary desktop computing capabilities
                                                              have also increased the useability of 2D models. 2D models
                                                              provide greater insight into the flow paths and associated
                                                              flow velocities of waterways and floodplains. The original
                                                              1D hydraulic flood model was unable to provide any
                                                              reliable flow path or flood velocity information. Hence, to
                                                              address the need to better understand the erosive processes
                                                              associated with flow velocities within the River an upgraded
                                                              2D hydraulic flood model has been commenced.




                                                                                      Noosa Council | Flood Management Plan | Page 16

Section 17

The development of a 2D hydraulic model of the River and                   Sunshine Coast Council commissioned consultants, Projex
its associated floodplains will also provide an insight into               Partners, to undertake a detailed flood investigation4 of the




                        F T
the anticipated overbank flood flow velocities. Knowledge                  site. Subsequently the Sunshine Coast Council undertook




                      A
of the anticipated overbank flood flow velocities will assist              a follow up study to develop a detailed (TUFLOW) flood




                   DR
Council and local builders and developers with identifying                 model of the Daintree Estate reach and determine flood
locations suitable for applying the national Standard for                  mitigation options for the estate. The results of this model
the construction of buildings in flood hazard areas. It will               form the basis for the current disaster management
also provide a more accurate estimation of design flood                    mapping.
velocities in high velocities locations where the Standard
                                                                           Recent flood mitigation works have significantly improved
does not apply. Knowledge of the anticipated magnitude of
                                                                           the flood immunity of affected properties. The Daintree
flood flow velocities is important in structural calculations
                                                                           Estate flood model has been amended to include these
for designing buildings, walls and fences located within
                                                                           works. The resulting inundation extents for the 1% AEP
flood prone areas.
                                                                           (future climate) scenario form the basis of the 2016 Flood
To address the deficiencies of the original 1D flood                       Hazard Area Planning Scheme amendment.
study required it to be upgraded to a contemporary 2D
modelling approach. Where possible, improvements to the
calibration and extents of the flood modelling are being
pursued although there are relatively limited additional
flood records available.

The completion of the upgraded Noosa River flood model
will provide an improved understanding of the distribution
of both tidal velocities and flood flow velocities throughout
the waterway and associated floodplains of the lower
reaches of the Noosa River.

The updated modelling will allow for variations in the shape
of the river’s bathymetry to be modelled to determine the
sensitivity of the waterway’s velocity distributions to these              5.1.4       Ringtail Creek
changes. This will assist with understanding if natural or
                                                                           In 2002 consultants Lawson and Treloar were commissioned
man-made changes to the shape of the river can have a
                                                                           to undertake the Ringtail Creek Hydraulic Investigation5.
demonstrable effect on flow velocities and erosive forces
                                                                           The flood models adopted for this investigation were
along the foreshore.
                                                                           RAFTS for hydrological modelling and DELFT-FLS for 2D
5.1.3         Noosa Daintree Estate                                        hydraulic modelling.

Noosa Daintree Estate is a 97 lot residential estate                       Anticipated inundation extents for a 100 year ARI local
constructed in circa 2000. The estate has been subject to                  catchment event combined with a 20 year ARI Regional
significant flooding on three occasions, with the most                     catchment event were used to inform the existing flood
severe impacts occurring from an event on the 24th                         hazard area of the Planning Scheme Natural Hazards
February 2012.                                                             Overlay map.

4
    Noosa Daintree Estate Report 1 July 2013 by Projex Partners for Sunshine Coast Regional Council
5
    Ringtail Creek Hydraulic Investigation, Lawson and Treloar Pty Ltd 2002




                                                                                              Noosa Council | Flood Management Plan | Page 17

Section 18

Between 2003 to 2005 additional investigations were                   5.2 Kin Kin Creek
undertaken to assess the impacts of proposed developments




                             F T
in the catchments.                                                    In 2002 consultants Lawson and Treloar were commissioned




                           A
                                                                      to investigate the flooding characteristics for the Kin Kin




                        DR
5.1.5      Lake Entrance Boulevard                                    Township7. This investigation prepared a flood model
                                                                      using the Delft FLS 2D hydraulic modelling software.
Following flooding resulting from the February 2012 rain
event, Sunshine Coast Council engaged Projex Partners6 to             In 2013 the Sunshine Coast Council commissioned Water
review a number of areas within the Sunshine Coast region             Technology Pty Ltd8 to undertake an update of the 2002
affected by this flooding. The objective of the exercise was          Kin Kin Flood Model. The earlier Delft FLS 2D model was
to provide a review for each affected area and subsequent             converted to an updated TUFLOW model. The updated
recommendations for Council’s consideration on possible               TUFLOW model has a model grid size resolution of 5m.
further investigation requirements and possible future                The model is described as a sub-model covering a relatively
rectification/mitigation measures.                                    small extent of Kin Kin Creek and extending approximately
                                                                      2km downstream and approximately 600m upstream of
The review of the drainage regime and approved flood study            Kin Kin township.
established that the drainage system has been constructed
in accordance with the development approvals and that                 The hydraulic model is also described as being “partially”
the existing Finished Floor Levels are above the previously           calibrated as it has demonstrated some calibration to
calculated and approved Q100 flood level.                             historical peak flood debris levels and flood profiles
                                                                      however has not been informed by calibrated hydrologic
The February 2012 rain event caused significant flooding
                                                                      inflows and/or downstream water surface elevation
to some properties within the estate. It appears that this
                                                                      boundary conditions. The 2013 investigation also included
flooding was a result of the excessive flows created by the
rain event and potentially exacerbated by downstream                  consideration of the potential impact on anticipated
tailwater conditions within the receiving downstream                  flood levels of re-vegetation within the waterway corridor
channel, as well as the impact of Eumundi-Noosa Road                  immediately upstream of Kin Kin township.
allowing water to back up.                                            The 2013 Sunshine Coast Council flood hazard mapping
The February 2012 rain event has been calculated by                   project utilised the updated Kin Kin Flood Model to
Sunshine Coast Council to exceed a 1 in 100 year                      generate a suite of flood results for existing and future
recurrence interval.                                                  climate scenarios.

                                                                      Future climate scenarios were used as the basis for the 2016
                                                                      amendment to the Planning Scheme flood hazard area.
                                                                      Existing climate scenarios are used to inform the disaster
                                                                      management mapping for Kin Kin township.




6
  Lake Entrance Boulevard Report by Projex Partners for Sunshine Coast Regional Council, August 2012
7
  Kin Kin Flood Study by Lawson and Treloar Pty Ltd 2002
8
  Kin Kin Flood Model Revision and Revegetation Hydraulic Impact Assessment, Water Technology Pty Ltd 2013




                                                                                                 Noosa Council | Flood Management Plan | Page 18

Section 19

5.3 Six Mile Creek                                                  5.3.2       Cooroy Creek




                      T
Currently Council’s flooding information for the main               In 2013 the Sunshine Coast Council commissioned Water




                  A F
watercourse and floodplain of Six Mile Creek is limited to          Technology11 to develop hydrologic and hydraulic models




               DR
the findings of the Six Mile Creek Flood Study Upgrade9             for the township of Cooroy. The primary purpose of this
undertaken by Sunshine Coast Council in 2013 as a                   study was to prepare and calibrate a hydrologic (XP-
part of their regional flood hazard mapping project. The            RAFTS) and hydraulic model (TUFLOW) for the greater
flood model utilised by the Sunshine Coast Council was              Cooroy township area such that Council could then use
based upon an existing flood model originally developed             the model to undertake further analyses.
in 2001 by JWP10 to investigate a dam break scenario at
Lake Macdonald. This base model utilises coarse, sparsely           The hydrologic model included the analysis of the greater
spaced cross section data and does not include details of           catchment areas that contribute to the Cooroy Township
local road crossings. This 15 year old base model is a one          as well as immediate surrounds. Specifically, this included
dimensional hydraulic model which utilises the MIKE 11              Cooroy Creek, Six Mile Creek Left Branch, Cudgerie
modelling platform.                                                 Creek as well as tributaries and sections of the Six Mile
                                                                    Creek main branch. The hydraulic model developed as
The SCC 2013 model updates for Six Mile Creek include               part of this study extends approximately 1km upstream of
model scenarios for both existing and future climates.              the Bruce Highway downstream to approximately 500m
Future climate scenarios were used as the basis for the             downstream of the confluence of the Six Mile Creek main
2016 amendment to the Planning Scheme flood hazard                  branch and Six Mile Creek left branch. The model includes
area. Existing climate scenarios are used to inform the
                                                                    24 separate hydraulic structures located throughout the
disaster management mapping for the Noosa River.
                                                                    model area.

5.3.1      Lake Macdonald                                           In late 2013 Hydrology and Water Management
                                                                    Consulting Pty Ltd (HWMC) was engaged12 by Sunshine
In 2001 consultants JWP were engaged to determine flood
                                                                    Coast Council to undertake further updates to the Cooroy
levels downstream of the dam as a result of severe flooding
                                                                    flood model previously prepared by Water Technology.
combined with embankment failure. The model is a one
                                                                    The results of this model form the basis for the current
dimensional hydraulic model which utilises the MIKE 11
                                                                    disaster management mapping.
modelling platform.

In a 2007 update of a Failure Impact Assessment, the                Recent upgrades to the Bruce Highway have delivered
MIKE11 model was extended a further 15km downstream                 flood mitigation benefits to some properties immediately
in accordance with Department of Natural Resources and              downstream of the highway. The Cooroy flood study
Water (NRW) guidelines and recommendation from the                  model has been amended to include these works and
Sunwater Dam Safety Review.                                         the resulting inundation extents for the 1% AEP (future
                                                                    climate) scenario form the basis of the 2016 amendment
This model has ultimately been adopted as the basis for             to the Planning Scheme flood hazard area.
the Six Mile Creek flood study upgrade undertaken by
Sunshine Coast Council in 2013. Cross sections in the
lower 15km extension of the model were sourced from 5m
contour plans.


 9
  Six Mile Creek Flood Study Upgrade Final Report By Sunshine Coast Council February 2014
 10
    Noosa Shire Council Lake MacDonald Dam Break Flood Study by John Wilson and Partners June 2001
 11
    Cooroy Flood Study by Water Technology, July 2013




                                                                                       Noosa Council | Flood Management Plan | Page 19

Section 20

5.3.3      Cooroora Creek                                             Following the February 2012 flood, SCC carried out survey
                                                                      to record peak flood levels reached during this event and




                               T
The main watercourse flowing through the town of




                             F
                                                                      these were used in the investigation for model calibration.




                           A
Pomona is Cooroora Creek, with several of its tributaries




                        DR
also flowing through the township.                                    HWMC’s analysis of the rainfall intensities recorded at the
                                                                      Pomona rain gauge for the February 2012 event, estimates
During the evening of February 24, 2012, Pomona was                   that this event was equivalent to approximately a 500 year
subject to a major flood event which impacted homes,                  Average Recurrence Interval (ARI) event.
businesses and infrastructure across the region. During
this event, the township was inundated by flows from                  The design event results of the HWMC flood study model
Cooroora Creek and its various tributaries.                           form the basis of the disaster management mapping for
                                                                      Pomona based upon existing climate conditions.
Following the event, the Sunshine Coast Council engaged
the consulting engineering firm, Projex Partners Pty Ltd,             Recent flood mitigation works have included house/land
to undertake a flood investigation study13. This study                resumptions and removal, earthworks and channelising of
reviewed the history of previous flood studies in the region,         local drainage in and around Rifle Street.
undertook a site inspection and made recommendations
regarding future works. One of these recommendations                  The Cooroora Creek flood study model has been amended
was to complete local and regional flood modelling so as to           to include these works and the resulting inundation extents
provide accurate design flood levels through the township.            for the 1% AEP (future climate) scenario form the basis of
                                                                      the 2016 amendment to the Planning Scheme flood hazard
In 2013, prior to de-amalgamation, the Sunshine Coast                 area.
Council commissioned Hydrology and Water Management
Consulting Pty Ltd (HWMC) to setup and calibrate a                    Additional model runs for minor (2 year ARI), moderate
detailed flood model14 that was suitable for defining                 (10 year ARI) and extreme (500 year ARI) flood events,
flooding characteristics within all significant flow paths            which include the recent mitigation works, are required to
through the Pomona Township and local surrounds.                      update the disaster management map series for Pomona.




12
   Cooroy Mitigation Options Review by Hydrology and Water Management Consulting, December 2013.
13
   Rifle Street, Pomona Drainage Report by Projex Partners for Sunshine Coast Regional Council 2012
14
   Pomona Flood Study by Hydrology and Water Management Consulting, December 2013




                                                                                                 Noosa Council | Flood Management Plan | Page 20

Section 21

5.4 Coastal and Storm Tide Studies                                     5.4.1.2     NDRP Storm Tide Hazard Interpolation
                                                                                   Study (GHD)




                      T
5.4.1.1    Sunshine Coast Storm Tide Study (Aurecon




                    F
           2013)                                                       The NDRP Storm Tide Hazard Interpolation Study15 was




                  A
                                                                       undertaken by GHD on behalf of the Department of




               DR
The Sunshine Coast Storm Tide Study was commissioned                   Science, Information Technology, Innovation and the Arts
by the Sunshine Coast Council prior to de-amalgamation                 (DSITIA). DSITIA were seeking information on the risk of
and completed by Aurecon in December 2013.                             storm tide hazards across the State that would identify the
As a part of the Storm Tide Study a new Noosa River                    relative likelihood of specific communities being subjected
TUFLOW (Classic) model was prepared using a detailed                   to dangerous inundation events.
nested 2D grid and drawing on available survey and                     The principal requirement of this study was to identify,
bathymetric data, along with the latest available LiDAR                based on a consistent methodology using data from
survey. Model calibration was undertaken to demonstrate                existing studies, the Average Recurrence Interval (ARI, or
tidal and storm tide performance at selected locations.                Return Period event) for a range of ocean water levels for
                                                                       each coastal LGA area. The minimum ARI levels required
The Noosa River TUFLOW Storm Tide model covers a large
                                                                       were the 20, 50, 100, 500 and 1000 y ARI event, plus the
computational area which includes the inter-tidal lakes in
                                                                       estimated Probable Maximum Level.
the upper estuary. A relatively coarse 40 m computation
grid was adopted to represent bathymetric and hydraulic                This was a state wide study with reference to Noosa and the
conditions over much of the model area. However, for                   Sunshine Coast.
the Noosa River entrance and the estuarine areas around
Noosa Heads, Noosaville and Tewantin higher resolution                 5.5 Key initiatives – Flood studies
was adopted to ensure model and mapping detail was
adequately represented. Accordingly, the model has been                The implementation plan will include initiatives that aim
prepared as a nested 2D2D model so that these areas could              to –
be modelled as higher resolution, but ensuring the dynamic              •   Prepare a flood study of Six Mile Creek using latest
interactions between the entrance areas and the upper lakes                 flood modelling techniques and standards that are
were maintained. The urbanised areas around the inlet were                  consistent with other flood models for the region.
modelled using a fine grid of 5 m. The nested high resolution
                                                                        •   Upgrade of the Noosa River Model to a contemporary
grid is 6.7 km by 5 km and covers the area from the estuary
                                                                            2D modelling platform and cover the major
inlet upstream to just north of Tewantin and south toward
                                                                            watercourses and floodplains to and beyond Kin Kin.
the entrance to Lake Weyba.
                                                                        •   Explore foreshore erosion within the lower reaches of
The river channels between the lakes, particularly                          the Noosa River using the Noosa River Model.
upstream of Tewantin and between Lake Cootharaba and
Lake Cooroibah, are relatively narrow and were poorly                   •   Include flood mitigation modelling for Daintree
represented at 40 m resolution. To address this, nested                     Estate, Cooroy Creek and Cooroora Creek for all
1D channels were introduced to represent the hydraulic                      design flood events in Council’s Flood Information
conveyance characteristics of these channels.                               Repository.
                                                                        •   Review the custodianship and management of
                                                                            Council’s flood study data (including spatial flood
                                                                            data files) with the view of establishing a clear point of
                                                                            contact with regards to flooding information.

 15
   NDRP Storm Tide Hazard Interpolation Study Report by GHD
 for Department of Science, Information Technology, Innovation and the Arts, May 2013




                                                                                        Noosa Council | Flood Management Plan | Page 21

Section 22

              6
                         A F T
       Flood Mapping
                      DR
Flood maps are the visible product of flood studies and        6.1 Noosa Planning Scheme Flood
flood records. They are a critical tool for communicating          Hazard Area
the findings of a flood analysis and/or an historical level
of inundation. Flood maps are often published for public       Noosa Planning Scheme’s current Natural Hazard Landslide
access and are commonly used for regulatory purposes           and Flooding Overlay series (OM1.3 to OM 9.3)16 depicts a
associated with Planning Scheme overlays.                      flood inundation extent for the Noosa River estuary from
                                                               Lake Cootharaba to the River mouth, Kin Kin township
Flood mapping is also critical for disaster planning (pre an   (Kin Kin Creek) and some sections of creek branches in
event) and disaster management during an event. Flood          Cooroy. These overlay maps typically represent a 1% AEP
mapping can also be used in development assessment to          flood event based upon current climate conditions.
determine the potential exposure of a development site
to mapped flood conditions beyond those presented in a         The Noosa River estuary Flood Hazard Area was derived
regulatory overlay.                                            from the Noosa River Flood Study by JWP 1995. The Kin
                                                               Kin Flood Hazard area was derived from the Kin Kin Flood
Flood maps are a snap shot of a chosen scenario of flood       Study by Lawson and Treloar 2002.
related conditions. Hence a series of flood maps may be
required to adequately cover the needs of the intended         The Cooroy Flood Hazard Areas were derived from the
user.                                                          Cooroy Flood Study by Lawson and Treloar 2002.

Noosa Council possess flood maps for: administering the        6.1.1     2016 Planning Scheme Amendment -
Planning Scheme (Noosa Plan); disaster management                        Flood Hazard Area
planning and response; and development assessment.
                                                               In late 2013, prior to de-amalgamation and as part of a
                                                               flood hazard mapping project, the Sunshine Coast Council
                                                               (SCC) revised and re-ran the design event temporal
                                                               patterns for all flood models within the Noosa Council
                                                               area.



16
     As amended 16 September 2013




                                                                                  NoosaNoosa
                                                                                        Council
                                                                                             Council
                                                                                                | Flood
                                                                                                      | Flood
                                                                                                         Management
                                                                                                              Management
                                                                                                                    Plan |Plan
                                                                                                                           Page| Page
                                                                                                                                  22 22

Section 23

The revised design rainfall patterns represent Duration        •   Major (100 year ARI); or




                         T
Independent Storm (DIS) patterns derived from Australian
                                                               •   Extreme (500 year ARI).




                       F
Rainfall and Runoff (AR&R) Intensity Frequency and




                     A
Duration (IFD) curves for this region.                         The Disaster Management Flood Map series cover all




                  DR
                                                               locations where Council possesses flood models and need
The SCC 2013 update also included the modifications            to be updated periodically to reflect changes within the
to cross section depths for the river bathymetry near to       catchments and upgrades to flood models.
the river mouth (as applied in the 1995 model) and the
inclusion of dynamic tailwater boundary conditions for         6.3 Online flood mapping resources
Laguna Bay.
                                                               Three forms of flood mapping can be accessed via Council’s
The dynamic tide boundary assumed the probability of the       website. These include:
river flood matched the probability of the storm tide with
the peak of the storm tide timed to coincide with the peak     •   River and Storm Tide flood map series prepared
of the rainfall.                                                   by Sunshine Coast Council and accessible via the
                                                                   Disaster and Emergencies and Get Ready web pages
The SCC 2013 model updates included model scenarios for            (http://www.noosa.qld.gov.au/river-and-storm-tide-
both existing and future climates.                                 flood-maps)

                                                               •   Noosa Plan’s Natural Hazard Landslide and Flooding
Future climate scenarios were used as the basis for the 2016
                                                                   Overlay series (OM1.3 to OM 9.3); and
amendment to the Planning Scheme flood hazard area.
                                                               •   Council’s online interactive mapping portal. The portal
The results of the SCC 2013 model updates also form the            currently presents three flood inundation layers:
basis of the current flood mapping and design event flood
                                                               1. Flood 100y Inundation Info – depicts the limit of
levels for the Noosa River.
                                                                  flood inundation mapping derived from related flood
                                                                  studies for a location.
6.2 2014 Disaster Management Flood
    Maps                                                       2. Flood 100y Inundation Area – depicts a flood
                                                                  inundation extent polygon (non transparent) for the
The 2014 Disaster Management Flood Map series are                 100 year (1% AEP) flood inundation based upon
based upon the flood inundation extents derived from the          current climate conditions and derived from the
SCC 2013 flood model updates. Flood inundation extents            Noosa River Flood Study, JWP 1995.
have been projected onto a digital elevation model of the
                                                               3. Proposed Flood Hazard Overlay 2014 – depicts the
ground surface derived from aerial laser survey.
                                                                  proposed amendment to the Planning Scheme as
Disaster management flood maps are based upon existing            advertised for public consultation. Public consultation
climate conditions.                                               ended in October 2015.

                                                               4. Final Flood Hazard Overlay 2016 Amendment
Each flood map series references the relative magnitude of
                                                                  (Pending Minister’s Approval).
the flood event as either:

•   Minor (2 year ARI);

•   Moderate (10 year ARI);




                                                                                   Noosa Council | Flood Management Plan | Page 23
                                                                                                      Noosa Social Strategy | Page 23

Section 24

6.4 GridFlow flood extent estimation                           The absolute flood levels and flood flow velocities




                         T
                                                               determined by the GridFlow analysis are not suitable for




                       F
The GridFlow flood extent estimation project was               setting minimum floor levels or for estimating flood flow




                     A
conducted by the Sunshine Coast Council across all             forces. More detailed, local calculations and observations




                  DR
catchments of the Sunshine Coast.                              would be required to inform these values. GridFlow flood
                                                               extents may be a useful trigger for highlighting potentially
The project’s aim was to prepare a preliminary estimate of
                                                               flood sensitive locations that are beyond the limits of
flood inundation extents for a 1% AEP flood event, for all
                                                               existing flood models.
identified water courses.

The analysis process utilised to determine the preliminary
                                                               6.5 Key initiatives – Flood mapping
flood extent was based upon GIS algorithms which
                                                               The implementation plan will include initiatives that aim
determined contributing catchment areas at regular
                                                               to –
increments along a waterway and then estimated flood
discharge for each location using standard Rational            •   Review the flood hazard area mapping for the Ringtail
Method computations.                                               Creek sub-catchment (Cooroibah area) following
                                                                   completion of the Noosa River Flood Study Upgrade.
A flood extent was then estimated at each location by
                                                               •   Update disaster management flood mapping series to
applying the computed flood discharge to the standard
                                                                   reflect flood mitigation works and completion of the
Mannings equation based upon a cross section derived
                                                                   Noosa River Model Upgrade.
from a Digital Elevation Model (DEM). The resulting
flood extent provides a preliminary estimate for flood         •   Prepare and maintain flood mapping layers showing
inundation extents. These estimated flood extents do not           flood levels, flood extents and associated minimum
consider local channel features or structures which may            floor levels for existing and future climate.
influence the actual extents of inundation.                    •   Include 1% AEP flood contour mapping and associated
                                                                   minimum floor levels mapping, 1%AEP flood extents
In the absence of more detailed local flood modelling the
                                                                   and depths to Council’s mapping system for officer
GridFlow flood estimation method is a useful first-pass for
                                                                   assess.
identifying locations that may be subject to potential flood
inundation from a 1% AEP flood event.




                                                                                   Noosa Council | Flood Management Plan | Page 24

Section 25

         7
    Flood records
     and survey




The collection and archiving of flood records is a task        7.1 Historical Flood records
undertaken to assist future generations by continuing to
improve the understanding of the flood characteristics         Noosa Council has a relatively short history of flood
of an area. Records of historical floods are an important      records for the region. The majority of the region’s highest
reference to support planning and decision making. The         recorded flood levels were obtained following the February
validity of a flood model is often determined by a model’s     1992 flood event. Prior to this a sparse selection of records
ability to reproduce the recordings of an historical event.    exists for the major flood event of 1968 and other significant
                                                               events throughout the 1970’s.
The capture and storage of flood levels is predominantly
a spatial mapping exercise. However, it is important that      It is often difficult to confirm the accuracy and reliability of
these records be maintained in conjunction with design         historical flood levels. Flood levels are often recorded from
flood levels derived from flood studies to ensure anomalies    the remnants of vegetation debris, water stains, damage to
in either data set are recognised (and explored), and to       infrastructure and occasionally from anecdotal references.
maintain a context of reference between actual recorded        These records offer a limited insight into the nature of each
event levels and those proposed as design levels. In doing     flood event and may be influenced by local conditions,
so it is also important to maintain access to all available    survey datums and other physical changes which may have
historical flood records (not just the highest). This will     occurred in the floodway. For these reasons some caution
enable further consideration of the frequency of flooding      is required when interpreting historical records.
at a location.

Determining the frequency of flooding from a series of
historic flood records requires some consistency in the
collection of records to ensure the events recorded reflect
the full nature of flooding experienced over periods of time
at a location.




                                                                                     Noosa Council | Flood Management Plan | Page 25

Section 26

7.2 Flood Gauges                                                                    7.2.2         Radio Telemetry Gauges




                                  F T
To improve the confidence in flood records Council has                              Radio telemetry gauges (also referred to as ALERT stations)




                                A
established a network of flood gauges throughout the                                utilise sensors and electronic systems to continuously




                             DR
major waterways of the area. Council manages two types                              measure water levels and rainfall and transmit these
of flood gauges; these being: Maximum Height Gauges                                 readings in real-time to a stakeholder organisation via
(MHGs) and Radio Telemetry Gauges.                                                  radio signals.

7.2.1         Maximum Height Gauges                                                 The Bureau of Meteorology (BoM) in partnership with
                                                                                    Noosa Council and other State agencies maintain and
Maximum Height Gauges (MHGs) are simple peak water                                  operate a network of ALERT rainfall and river height
level recording stations located throughout the region                              gauges throughout the Noosa Council local government
close to waterways. Noosa Council currently manages                                 area. These rainfall and river height stations are used for
46 MHGs. During times of inundation water surrounds                                 flood warning and forecasting operations in the Bureau’s
the MHG and fills the inside of the gauge via small holes                           Flood Warning Centre located in Brisbane and are also
drilled into the base of the gauge outer housing. When the                          monitored locally to assist with disaster management
flood waters recede from around the gauge water remains                             activities during flood events.
trapped in the cups up to the peak level reached. This
water will remain in the gauge for 2-3 weeks depending                              There are currently eight water level ALERT stations and
upon evaporation. These water levels are recorded during                            12 rainfall ALERT stations. Some stations monitor both
an inspection of the gauge following a flood event. MHGs                            rainfall and water levels whilst others may only monitor
have no moving parts or electrical circuits and hence                               either rainfall or water level.
offer a robust and reliable means of accurately recording
the peak flood level for a given location. Some periodic
maintenance is required to ensure the MHGs remain
functional and accessible.




Rainfall and water level data is collected by stakeholder organisations via the BoM’s Enviromon software.




                                                                                                            Noosa Council | Flood Management Plan | Page 26

Section 27

7.3 Flood Studies Survey                                          7.3.2		 Bathymetric Survey




                       F T
Flood studies will generally be informed by a flood model         Bathymetric survey is information relating to river and lake




                     A
of the area under investigation. Flood models are typically       bed surfaces. Bathymetric survey is typically undertaken




                  DR
computer based simulations of the terrain and other               below normal water surface levels. Detailed bathymetric
landform features combined with algorithms to translate           survey was been collected for the lower reaches of the
rainfall into runoff and flooding conditions. To create           Noosa River in 201017. This survey was collected using a
an accurate flood model of a location requires survey             combination of depth sonar readings and GPS tracking
information of the terrain and any significant features           to map the bed surface of the river. Sandy coastal river
which may influence the flow of flood waters. There are           estuaries like the Noosa River are dynamic systems that are
typically three types of survey data required for flood           continuously changing due to freshwater flows and tidal
models. These being: ground survey; bathymetric survey            currents. This survey offers a snap shot in time of the river
and waterway crossings survey.                                    bed during ambient (non flood) flow conditions.

7.3.1         Ground survey                                       Standard ALS survey techniques do not capture terrain
                                                                  surfaces below water levels although specialised equipment
Ground survey data for flood models was traditionally             and processes continue to be developed in this field. In
collected as a series of cross sections surveyed across semi-     2013 a pilot study was conducted on the Sunshine Coast
regular intervals along a waterway and capturing ground           as a collaboration between the Queensland Government,
levels which extend across the flood plain. The collection        CRC for Spatial Information (CRCSI) and the Department
of cross section survey over large areas is labour intensive      of Climate Change and Energy Efficiency (DCCEE). The
and returns a relatively limited portrayal of the terrain.        aim of the pilot study was to provide useful evidence to
More contemporary survey methods utilise aerial laser             inform future data gathering by considering the methods
scanning (ALS) also referred to as LiDAR. ALS survey              and technology available and the relationship between
is undertaken from a specialised aircraft and sensor              the accuracy of the bathymetry and our confidence in the
equipment and provides a detailed record of surface levels        modelling outputs. The pilot study found that the current
capable of capturing dozens of readings per square metre          technology of bathymetric LIDAR was not recommended
across entire catchment areas. ALS data sets are extensive        for streams, estuaries and lakes but may be an efficient
and offer a detailed assessment of visible surfaces capable       method for near-shore coastal areas.
of generating an accurate representation of the terrain and
other features from potentially billions of surface point         The collection of additional bathymetric survey of the
records.                                                          Noosa River is recommended to supplement existing
                                                                  survey of the River’s bed profile to help monitor and
ALS data sets for a location are generated periodically by        understand changes over time and potential impacts.
government agencies and private suppliers. A 2016 series of
ALS data has been captured for Noosa and post processing
of this data is underway.




17
     Lower Noosa River Hydrographic Survey Definium Survey 2010




                                                                                   Noosa Council | Flood Management Plan | Page 27

Section 28

7.3.3     Waterway Crossing Survey                             7.4 Key initiatives – Flood records and




                         T
                                                                   survey




                       F
Waterway crossing survey provides details of structures




                     A
such as bridges and culverts that cross waterways. The         The implementation plan will include initiatives that aim




                  DR
crossing survey will confirm the available waterway area       to –
beneath a structure and other critical dimensions such as
the thickness of the deck of the structure and the elevation   •   Collect peak flood level records along Kin Kin Creek
of the road surface above which inundation of the crossing         for a variety of flood events to improve flood model
will occur. Accurate waterway crossing survey is important         calibration in this location.
for determining the influence a crossing may have on local     •   Install MHG gauges along Kin Kin Creek adjacent to
flood levels and for planning for disaster management              Dr Pages Road and along Cooroora Creek and Cooroy
responses during flood events.                                     Creek.

Structure survey for Noosa River was undertaken by             •   Review existing radio telemetry flood gauge network
Aurecon in 2011 on behalf of Sunshine Coast Council.               and prioritise potential locations for additional gauges.
The survey includes a collection of 30 annotated sketches      •   Complete additional bathymetric survey of the Noosa
of structure dimensions and relevant flood related                 River to supplement existing survey of the River’s bed
infrastructure elevations. Selections of other structure           profile to help monitor and understand changes over
details are available for some estates and other significant       time and potential impacts.
crossings throughout the catchments.
                                                               •   Develop a guideline for collecting and storing flood
                                                                   related field data

                                                               •   Establish a regular maintenance program and
                                                                   procedures for maintaining the Council’s Maximum
                                                                   Height Gauges (MHGs).

                                                                                          •   
                                                                                              C onfirm    triggers and
                                                                                              procedures for reading
                                                                                              and maintaining Council’s
                                                                                              network of Maximum Height
                                                                                              Gauges.

                                                                                          •   Incorporate all available
                                                                                               historical flood level data
                                                                                               into an accessible GIS
                                                                                               environment.




                                                                                   Noosa Council | Flood Management Plan | Page 28

Section 29

         8
                    A F T
                 DR
    Flood Search
    Information




It was a key recommendation of the 2012 Queensland           8.1 Key initiatives – Flood Search
Floods Commission of Inquiry to make relevant flooding           Information
information more publicly accessible. Making flooding
information available to the public and more specifically    •   Provide an automated flood search certificate system
professional consultants improves consistency between            for generating and issuing certificates.
development applications and Council’s information           •   Prepare advice regarding the process for applying for
resources that will be used to assess applications.              Council flood study information via Council’s website.

Noosa Council currently provides a level of service with     •   Establish a standard agreement for consultants to sign
regards to making flooding information accessible to             when requesting access to Council flood study data
the public. Property searches for Flood Information              files.
can be purchased from Council and some limited flood
inundation mapping is currently available online for
planning purposes via the Council’s Interactive Mapping
Portal.

As flooding information becomes more readily accessible
local governments are progressing towards the on-demand
publication of property searches for flood information.
The automation of preparing property searches for flood
information would improve consistency and potentially
reduce overheads for Council. It is recommended that the
public have on demand access to detailed property specific
flooding information via the organisation’s website.




                                                                                Noosa Council | Flood Management Plan | Page 29

Section 30

          9
                      A F T
                   DR
        Planning
       and Policy




Whilst flood studies, flood mapping and flood data                9.1 Noosa Planning Scheme
collection inform our understanding of the flooding
characteristics of the region it is the organisation’s planning   The most visible application of planning and policy for
and policy positions that define the response.                    flooding is presented from within the Noosa Planning
                                                                  Scheme (The Noosa Plan 2006). The Planning Scheme
Council’s Development Assessment Unit is responsible for          includes provisions in the Natural Hazards Overlay Code
the assessment of development applications and supporting         for:
information such as flood models and associated reporting
                                                                  •   minimum floor levels;
which may be submitted by an applicant in response to the
provisions of the Planning Scheme.                                •   filling and excavations in flood hazard areas;
                                                                  •   storage of hazardous materials with regards to
Flood management covers a diverse range of responsibilities
                                                                      flooding;
and council stakeholders and hence it remains important
for these functions to be overseen and coordinated by             •   design requirements for flood resilience with regards
a clearly identifiable representative or a collective of              to flood immunity relating to essential infrastructure,
representatives which may meet under the banner of an                 community uses, subdivisions, residential and non-
internal flooding working group. Such representation                  residential buildings
would serve to rationalise competing demands from                 •   disaster management and evacuation;
across the organisation, actively promote the sharing of
                                                                  •   ensuring development on the floodplain does not
information, and identify opportunities for mutual benefit
                                                                      impact on the floodplain characteristics and flood
whilst avoiding duplication and conflicts.
                                                                      capacity or downstream properties; and
                                                                  •   considering current and future climate conditions.

                                                                  The Natural Hazard: Landslide and Flooding Overlay
                                                                  series of maps depict a Flood Hazard Area for flood prone
                                                                  locations. The flood hazard area typically represents the
                                                                  extents of a 1% AEP flood event. Developments proposed
                                                                  within the flood hazard area of the Overlay are required
                                                                  to address the relevant provisions of the Natural Hazard
                                                                  Overlay Code and respond to the requirements outlined in
                                                                  Planning Scheme Policy 01.




                                                                                     Noosa Council | Flood Management Plan | Page 30

Section 31

Requirements for minimum floor levels to achieve                9.2 Climate Change




                         T
acceptable standards of flood immunity are presented in




                       F
the Detached House Code and the Building Works Code.            Along with other levels of government, Councils have




                     A
                                                                a responsibility for planning and preparing for natural




                  DR
The planning scheme provisions also reflect the State           hazard risks within the community, and this includes
Planning Policy for Safety and resilience to hazards.           longer term climate related risks associated with flooding,
                                                                extreme storms, coastal erosion, and changes to rainfall
Council is under some pressure to allow basement carparks
                                                                and temperature.
that can be mechanically pumped in a flood event, as
different to the current position of required underground       The increasing severity of natural hazards and future
carparks to be gravity fed. While Council has made              liability risks means council needs to be taking steps to
some allowance for commercial basement carparks to be           understand the risks to the community, infrastructure and
mechanically pumped, it is not recommended that this be         assets and identifying solutions for the short, medium and
allow for residential developments where resident’s cars        long term.
are at risk. Nonetheless consideration should be given to
new technologies for basement flood prevention and the          Current projections by 2100 indicate:
scheme should ensure that it is written in a way that does
                                                                •   A projected regional sea level rise of 0.8m. This is
not stifle the adoption of innovative solutions.
                                                                    expected to contribute to an increase in the frequency
Council has commenced work on a new planning scheme                 and severity of coastal flooding, increase in tidal
for Noosa Shire which is expected to include similar detailed       extremes and increased coastal erosion
policy positions around flooding and best available flood       •   A southward shift in tropical cyclone activity
mapping as per the current scheme that takes account of
                                                                •   Fewer cyclones but an increase in the intensity of
current and future climate. The new scheme should ensure
                                                                    cyclones and extreme storm events of up to 10%.
flood management outcomes are consistent with broader
policy outcomes and principles for the Shire as set out in      •   More heatwaves: The number of days over 35 degrees
this Plan.                                                          is projected to increase by an additional 30 days per
                                                                    annum by 2100.
Improvements in the consistency between development
                                                                •   Accelerated coastal erosion
application and assessment processes can be gained by
providing clear guidance on preferred or acceptable             •   Permanent inundation of low lying areas
methods and parameters for undertaking flooding analysis        •   Increased areas impacted by storm surge and king
in this region. As for most studies of natural processes            tides
numerous assumptions are required to be made in order
                                                                •   Property and infrastructure may not be constructed to
to simulate the characteristics of the natural environment.
                                                                    cope with increasingly frequent and extreme weather
These characteristics can change from region to region and
                                                                    events.
some parameters may be subject to professional judgement
and local preferences. Where possible, it is recommended
that guidance be provided to outline acceptable (or
recommended) standards for common parameters
required in flood analysis.




                                                                                    Noosa Council | Flood Management Plan | Page 31

Section 32

The increasing risks of climate related hazards will likely               9.3 Key initiatives – Planning and




                            T
affect council in the areas of—                                               policy




                        A F
 •   Litigation and legal liability
                                                                          The implementation plan will include initiatives that aim




                     DR
 •   Community expectations                                               to –
 •   Land use planning and development                                     •   Review planning scheme provisions with regards
 •   Asset and infrastructure planning, design and                             to flooding to ensure alignment and outcomes are
     management                                                                consistent with principles adopted via this Flood
                                                                               Management Plan.
 •   Financial sustainability.
                                                                           •   In conjunction with the preparation of a new planning
The 2016 Planning Scheme flood hazard area overlay                             scheme prepare a planning scheme policy outlining
includes parameters which reflect future climate conditions                    preferred methods and parameters for flood studies
for 2100. These parameters include an increase in rainfall                     and flood management.
intensity for severe weather events and increases in mean
                                                                           •   Include as part of the planning scheme flood hazard
sea levels over time. To reflect these conditions the design
                                                                               mapping the areas of maximum flow velocities to
rainfall temporal patterns have been increased by 20%18
                                                                               assist with development assessment and building and
and mean sea levels raised by 800mm19. These values are
                                                                               infrastructure design.
consistent with current recommendations and industry
practice for Queensland communities.                                       •   Enforce council’s position requiring gravity fed
                                                                               carparks for new residential development and ensure
Council has commenced the preparation of a Climate                             there is improved clarity on this in the new planning
Change Adaptation Plan for Noosa Shire. The plan                               scheme.
will focus on climate related hazards such as flooding,                    •   Establish an internal flooding working group to
storm surge, extreme storm events, coastal erosion and                         help coordinate flood management functions across
permanent inundation from sea level rise. It will also                         council and to assist with facilitating council wide
look at adaptation for bushfire hazard and biodiversity                        input into developing planning provisions and council
conservation. The plan will identify the coastal hazards,                      guidelines related to flooding.
risks, and vulnerable areas and assets. It will investigate
                                                                           •   Support members of the flood working group by
actions to help minimise the exposure of new assets to
                                                                               offering professional development opportunities
future damages (eg building extra flood resilience into new
                                                                               related to planning and policy with regards to flooding.
roads and bridges) and options for improving the resilience
of existing assets and communities.                                        •   Prepare a climate change adaptation plan that
                                                                               addresses future flood hazard risk and the likely
The outcomes of the Climate Change Adaptation Plan will                        associated consequences for vulnerable communities
be important for informing policy responses for the new                        and infrastructure and identifies future options for
planning scheme, as well as community, infrastructure and                      discussion with the community.
financial planning.

18
   Increasing Queensland’s resilience to inland flooding in a changing climate: Final Report on the Inland Flooding Study. A joint project of
Department of Environment and Resource Management, Department of Infrastructure and Planning and Local Government Association of
Queensland. 2010
19
   The projected sea-level rise of 0.8 metres by the year 2100 is based on climate modelling and probable scenarios of world development
presented in the Forth Assessment Report released in 2007. See IPCC, 2007: Climate Change 2007: Synthesis Report. Contribution of Working
Groups I, II and III to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change [Core Writing Team, Pachauri, R.K and
Reisinger, A.(eds.)]. IPCC, Geneva, Switzerland, 104 pp.




                                                                                                  Noosa Council | Flood Management Plan | Page 32

Section 33

     10
                     A F T
                  DR
      Disaster
    Management




10.1 Disaster Management Preparations                            10.1.1    Disaster management flood maps

Disaster management preparation refers to the capacity           Noosa Council has prepared a series of flood inundation
of the organisation to prepare for a disaster management         maps which depict Minor, Moderate, Major and Extreme
activation related to flooding. Typical preparations include:    flood events. These maps represent flood study findings
                                                                 for current climate design flood events with average
•   the production of a series of flood inundation maps
                                                                 recurrence intervals of 2 years, 10 years, 100 years and 500
    which depict a range of flood events across vulnerable
                                                                 years respectively.
    areas;

•   the establishment of observable triggers which               The disaster management flood map series include
    may inform the activation of disaster management             references to radio telemetry water level gauges associated
    responses;                                                   with the mapped waterways. Anticipated design event
                                                                 flood levels at each gauge’s location have been referenced
•   ensuring adequate redundancies exist for critical
                                                                 from the relevant studies and are presented on the maps
    systems and reference material; and
                                                                 as a series of flood totems. Real-time water level readings
•   the training of relevant officers in being able to monitor   transmitted from the gauges to the BoM’s Enviromon
    real-time flood information (rainfall and water levels)      system can be cross referenced to the flood totems to
    via the Bureau of Meteorology (BoM) Enviromon                visually determine the equivalent design flood event for
    system or equivalent.                                        each gauge location. The description of this design event
                                                                 as either a Minor, Moderate, Major and Extreme flood
Council has disaster management plans in place for
                                                                 event can then be used in communications throughout the
Cooran, Kin Kin, Pomona and Daintree Estate.
                                                                 disaster management stakeholders and the community.

                                                                 For this process to function, relevant officers need to
                                                                 be capable of accessing and extracting real-time flood
                                                                 information from the BoM’s Enviromon system.




                                                                                     Noosa Council | Flood Management Plan | Page 33

Section 34

Council provides online access to a series of River and           To provide correct advice during a flood event on the




                          T
Storm Tide maps (in PDF format) for communicating                 current triggers and consequences requires each flood




                        F
the progression of potential flood extents and the relative       gauge to be maintained and calibrated to transmit accurate




                      A
depth of potential flooding within the inundation extents.        incremental signals. Also, once received by the Enviromon




                   DR
These maps are not linked to any identifiable triggers which      system, these signals then need to be translated into
might be used to inform disaster management activation            meaningful rainfall depths or water levels which can then
responses.                                                        be related to real world conditions. All gauges will require
                                                                  periodic maintenance to ensure they are functioning as
The organisation also possess a series of flood maps              expected. In addition to the maintenance of mechanical/
depicting flooding from a variety of flood trigger levels         digital infrastructure of each gauge the numerical
and covering all major waterways and at risk communities.         translations embedded into the Enviromon system should
These maps have been developed following a series of flood        also be periodically checked.
study upgrades undertaken by the Sunshine Coast Council
prior to de-amalgamation. These flood maps should be              Council has identified flood triggers for some telemetry
presented online.                                                 gauges to inform disaster management activation levels.
                                                                  These triggers currently correspond to the design event
10.1.2     Disaster management triggers                           flood levels anticipated at each telemetry gauge location for
                                                                  the 2 year (minor), 10 year (moderate), 100 year (Major)
Setting disaster management triggers is a two stage process.
                                                                  and 500 year (Extreme) average recurrence interval flood
The first stage being the correlation of the recorded (real-
                                                                  events.
time) water level (or rainfall intensity) for a gauge site with
an equivalent design flood event reference (i.e. Minor,           It is recommended that flood triggers to be set for all
Moderate, Major or Extreme). This reference enables the           telemetry gauges and that corresponding on-ground
magnitude of the event to be quantified and communicated          responses and impacts be identified for each trigger level.
effectively. The second stage is then to be able to communicate
the likely consequences to the community of each of the           10.1.3    Disaster management redundancy
design event levels. Consequences may include inundated
roads, inundated properties, isolated communities etc.            To effectively advise on flood related conditions during
The identification of possible/likely consequences from           a flood event requires access to readings or observations
each level of flood event can be informed by desktop              of current water levels and the ability to translate these
analysis and anecdotal advice received from individuals           readings into meaningful advice to other stakeholders.
in the community and stakeholders within Council and              Standard procedures for monitoring river/creek water
associated emergency services. Appropriate responses to           levels and catchment rainfall are dependent upon the
each of the consequences identified are the responsibility        functionality of each of the rainfall and river height gauges,
of each emergency services agency.                                the ability to receive signals from each gauge, the ability
                                                                  to translate these readings into meaningful references and
For efficiency of providing timely advice and                     the ability to communicate these references to a broader
communications during a flood event it is recommended             stakeholder group. To fulfil these standard procedures
that the flood triggers and associated consequences be            requires a number of critical systems to be functional.
determined prior to an event.




                                                                                       Noosa Council | Flood Management Plan | Page 34

Section 35

Available flooding information should be fully redundant        The Enviromon system and its traditional interface are not




                         T
in the event of a disruption to access to council’s network     considered to be user friendly and have not been designed




                       F
however it can be dependent on other technology. It is          for infrequent or intuitive use. Hence, a number of local




                     A
recommended that redundancy options and alternate               governments have begun to explore additional software




                  DR
operating procedures for each system associated with flood      systems that provide greater accessibility, interpretation
monitoring and for providing flood advice to the LDMG           and warning capabilities of Enviromon collected data.
be developed to reinforce the process of providing flood        Such systems may improve user access and the quality of
advice in the event of a failure to one of these systems.       advice provided during flood events. It is recommended
                                                                that Council consider options to utilise additional
10.1.4    Real-time flood monitoring                            software options to enhance the functionality and improve
                                                                accessibility to Enviromon readings.
To fulfil an advisory role with regards to flooding
during a disaster management activation will require
                                                                10.2 Disaster Management Activations
an understanding of the real-time conditions being
experienced in the waterways and catchments within              A local disaster coordination centre will typically be
the Council area. The standard procedure/system for             activated prior to an impending flood event based upon
obtaining this information is currently via the Bureau of       advice received from the Bureau of Meteorology (BoM).
Meteorology’s Enviromon system which is hosted within           However, during the event it will be expected that local
Council and can be accessed via Council’s internal network      conditions are being monitored by council officers
or by remote login to a stand-alone PC.                         supporting the coordination centre and that forecasts from
                                                                the BoM are also being interpreted with regards to local
Varying levels of user proficiency are required to access
                                                                conditions. This requires a good working knowledge of
and manage the Enviromon system. It is recommended
                                                                available flood map products and the BoM’s Enviromon
that a broad user base be trained in a basic proficiency
                                                                system by a sufficient number of trained officers to be able
which would enable them to independently login to
                                                                to cover a rotating shift over at least 24 hours.
Enviromon and view relevant rainfall or water level
readings for gauges within the Council area. A smaller          10.2.1    Trained staff resources
subset of this user group should also be trained in more
advanced management of the Enviromon system. It is              Interpreting real-time flood information requires a basic
also recommended that a single point of contact (with a         understanding of hydrology (rainfall runoff) and hydraulics
hierarchy of alternative contacts) should also be established   (water conveyance) and the ability to translate observed
to ensure coordinated management of the Enviromon               or forecasted information into expected outcomes based
system and communications with Bureau of Meteorology            upon the know characteristics of local catchments and
(BoM).                                                          waterways. Varying levels of understanding of hydrologic
                                                                concepts such as rainfall intensity and duration, runoff
A basic working knowledge of Enviromon amongst                  times of concentration and rainfall volume would be
sufficient staff from across the organisation is required       expected. Similarly varying levels of understanding of
to be able to cover a rotating shift over at least 24 hours.    hydraulic concepts such as rate of rise, backwater effects,
This assumes an eight hour shift with a one hour handover       flood waves and tailwater conditions would be expected.
between shifts. To cover these shifts without duplication
therefore requires a total of four trained staff.




                                                                                    Noosa Council | Flood Management Plan | Page 35

Section 36

In addition to the interpretation of real-time information     At least three officers in Council should possess this overall




                         T
staff would be expected to be capable of effectively           understanding. It is recommended that to provide relevant




                       F
communicating an accurate interpretation to the                officers with these understandings the flood specific




                     A
stakeholders of a disaster coordination centre. The            procedures be documented in a simple guideline.




                  DR
organisation should have 4 trained officers who can
provide interpretation of real-time flood information via      10.3 Community Awareness
monitoring software such as BoM’s Enviromon or other
accessible sources.                                            It is generally accepted that a community’s resilience to
                                                               flooding can be significantly improved, in lieu of flood
It is also recommended that officers actively participate      mitigation, via improved community awareness. Improved
in disaster management training exercises to familiarise       community awareness of potential flooding conditions can
themselves with the protocols and expectations of a            improve preparedness, reduce loss and avoid inappropriate
disaster coordination centre. Flood-specific training could    actions during a flood event that may expose residents to
be conducted independently of other broader disaster           further risk. A dedicated community awareness program aims
management training opportunities to further refine            to promote awareness of flood risks and strategies to manage
specific flooding related skills.                              or minimise these risks. For instance, initiatives could include
                                                               awareness for drivers attempting flooded crossings.
10.2.2    Overall understanding of flood specific
          procedures                                           Council’s website includes some general information
                                                               related to promoting an awareness of flooding. The
In addition to possessing a basic technical competency in      website includes a brief description of types of flooding
hydrologic concepts and a general understanding of local       and references to a variety of flood mapping resources
disaster management practices, it is also recommended that     including river and storm maps and flood specific layers
relevant officers possess an overall understanding of their    displayed within Council’s Interactive Mapping portal.
role and flooding specific procedures/services expected
                                                               The organisation periodically promotes flood related
to be provided during a flood event. This may include
                                                               services and messages to the community. It is recommended
confirming an understanding of: how to prepare a situation
                                                               the organisation to undertake a dedicated community
report; the frequency expected to provide advice; the format
                                                               awareness program at least every two years.
of the advice provided; the sources of reference to inform
advice; and knowing who to provide the advice to.
                                                               10.4 Flood Mitigation
                                                               Flood mitigation represents an infrastructure response to
                                                               improving community flood resilience. As with all capital
                                                               works programs, the delivery of flood mitigation requires
                                                               long term planning and prioritisation. Prioritisation of
                                                               mitigation options and investment may be influenced by
                                                               considering who the main beneficiaries of the works are and
                                                               how the works are to be funded. Flood mitigation works may
                                                               include upgrades to culverts, bridges and road elevations to
                                                               improve the flood immunity of a roadway or to improve the
                                                               conveyance of flood waters and reduce the potential for flood
                                                               waters to back up and cause damage or nuisance.




                                                                                    Noosa Council | Flood Management Plan | Page 36

Section 37

Council has recently undertaken flood mitigation works in     •   Review the gauge translations in Enviromon every




                        T
Pomona (2016) and near Daintree Estate (2015) to improve          two years to ensure accurate real world conditions are




                      F
the resilience of the local communities and residents who         being reported.




                    A
had been affected by recent flood events. Flood mitigation




                 DR
                                                              •   Review standard procedures for receiving and
works for Ashgrove Drive Cooroy are currently underway
                                                                  providing flood advice with the view to identify critical
in association with the Bruce Highway upgrade.
                                                                  systems within this process. Identify redundancy
There is currently no documented strategy for flood               options and alternative procedures in the event of
mitigation for this council. A flood mitigation strategy          possible failures to critical systems.
helps to documents mitigation opportunities prioritises       •   Establish a user group with basic proficiency in the
these works and includes an implementation plan for their         operation of the Enviromon system and a user group
delivery. It should act as a road map for future investment       with advanced proficiency in the system.
in flood mitigation activities and facilitate improved
                                                              •   Explore options to utilise additional software to
communications across all related stakeholders regarding
                                                                  enhance the functionality and improve accessibility to
site selection and prioritisation of works.
                                                                  Enviromon readings.
Forecasted increases in mean sea levels and rainfall
                                                              Disaster Activation
intensities associated with future climate scenarios may
require broad scale mitigation works to be considered if      •   Provide basic competency training in hydrologic
existing standards of service for trafficability and flood        and hydraulic characteristics of the Noosa Council
immunity are to be maintained. A flood mitigation strategy        catchments and waterways.
may also consider non-structural responses which opt to
                                                              •   Provide specific flood disaster management training
redefine standards of service for vulnerable locations.
                                                                  to relevant council officers or stakeholders to further
It is recommended that a flood mitigation strategy to be          refine specific flooding related skills.
prepared including a detailed implementation plan for
                                                              •   Ensure basic training has been provided to flood
prioritising and costing potential actions.
                                                                  related officers on the procedures to follow during a
                                                                  flood event.
10.5 Key initiatives –
     Disaster management                                      Community awareness

                                                              •   Prepare and deliver a community flood awareness
The implementation plan will include initiatives that aim
                                                                  program.
to achieve the following–
                                                              Flood mitigation
Disaster preparation
                                                              •   Prepare a project scope outlining the desired structure
•   Determine flood trigger levels for vulnerable
                                                                  and outcomes for a Flood Mitigation Plan.
    communities or vulnerable infrastructure items with
    one (or more) of the Council’s radio telemetry gauges     •   Incorporate relevant recommendations from the
    and document the likely associated consequences.              Flood Mitigation Plan into Council’s overall 10 year
                                                                  capital works program.
•   Undertake regular maintenance of all radio telemetry
    gauges.




                                                                                  Noosa Council | Flood Management Plan | Page 37

Section 38

    11
                   A F T
                DR
 Implementation
   and Review




Council aims to achieve the key initiatives of the Flood
Management Plan over a 5 year implementation period.
An implementation plan will be developed, that describes
priority actions and identifies responsibilities and
timeframes.

Progress on the Flood Management Plan will be reviewed
and reported to Council annually. The implementation
plan will be updated to reflect the review process.




                                                           Noosa Council | Flood Management Plan | Page 38

Section 39

  Glossary
                     A F T
                  DR
These definitions are taken from within this document and
from the Queensland Floods Commission of Inquiry Final
Report Queensland Floods (2012)

Annual Exceedance Probability (AEP) means the
chance of a flood of a given or larger size occurring in any
                                                                Defined flood event (DFE) is the flood event adopted by
                                                                a local government for the management of development in
                                                                a particular locality.

                                                                Defined flood level (DFL) is the level of a flood that
                                                                would occur during a defined flood event (DFE).
one year, usually expressed as a percentage. For example,
if a peak flood discharge of 500m3/s has an AEP of 5%,          Flood map is a map which depicts the extent of a
it means that there is a 5% chance (1 in 20 chance) of a        particular flood or floods, for example the 1% AEP flood
500m3/s or larger event occurring in any one year (see          or a historical flood.
ARI).
                                                                Flood study is a scientific investigation into flooding in a
Australian Height Datum (AHD) means a common                    particular area, usually the catchment of a river system. It
national surface level datum approximately corresponding        may involve hydrologic and hydraulic investigations and a
ton mean sea level.                                             statistical analysis of the frequency with which floods have
                                                                occurred in the past.
Average Recurrence Interval (ARI) means the long
term average number of years between the occurrence             Flow velocity means the flow rate of water over an area
of a flood as big as, or larger than, the selected event. For   and is measured in cubic metres per second (m3/s) or
example, floods with a discharge as great as, or greater        cumecs.
than, the 20 year ARI flood event will occur on average
                                                                Hydraulic studies/investigations (with respect
once every 20 years. ARI is another way of expressing the
                                                                to flood studies) means an analysis that estimates the
likelihood of occurrence of a flood event (see AEP).
                                                                behaviour of flood flow (that is, flow rate, velocity, depth
Building controls are standards that regulate the               and extent of inundation) as it passes through a floodplain
construction of buildings, as distinct from planning            (see flood study).
controls that regulate where buildings are constructed.
                                                                Hydrologic model (runoff routing model) uses rainfall
These standards can be found in the Building Code of
                                                                data and estimates of the proportion of the rainfall which
Australia and the Queensland Development Code, or in
                                                                turns into runoff and the time which the runoff from each
planning instruments.
                                                                part of the catchment takes to flow into the stream to
                                                                estimate flow in the stream over time.




                                                                                    Noosa Council | Flood Management Plan | Page 39

Section 40

Hydrologic study/investigation (with respect to flood




                        T
studies) means a study aimed at determining rainfall and




                      F
associated stream flows in a range of scenarios (see flood




                    A
study).




                 DR
Hydrology is the term given to the study of the rainfall
and runoff process; in particular, the evaluation of peak
flows, flow volumes and the derivation of hydrographs for
a range of floods.

Overlay means an extra layer of assessment in planning
schemes. The provisions of an overlay code are usually
triggered by overlay maps that depict extra information to
the information on the zoning maps.

Planning scheme is a local planning instrument for
regulating development in Queensland. Planning schemes
regulate what development must be assessed before it can
be undertaken, the type of assessment required and the
criteria used in an assessment in each council region. They
also contain codes with which self-assessable development
must comply.

Bathymetric survey is information relating to river
and lake bed surfaces. Bathymetric survey is typically
undertaken below normal water surface levels. (see chapter
7 of this document)




                                                              Noosa Council | Flood Management Plan | Page 40

Section 41

   A F T
DR




      Noosa Council | Flood Management Plan | Page 41

Section 42

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.