2016-07-18 General Committee Meeting - Item 3 - Attachment 1 - Flood Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 5
A F T
DR
Flood Studies
Noosa Council has a suite of flood studies which cover 5.1.1 Noosa River Flood Study
most of the major waterways and floodplains of the region.
The age and origin of these studies varies from catchment The first major flood study of the Noosa River was
to catchment however, prior to de-amalgamation the completed in 1995 by consultants John Wilson and Partners
(JWP)3. The model is comprised of two separate modelling
Sunshine Coast Council had attempted to standardise
components. The first being the hydrology model which
some of the model approaches and generate a suite of
determines the amount of runoff generated from rainfall
relatively consistent flood studies across the region.
falling on contributing catchments; and the second being
the hydraulic model which determines the depth, extent and
The following sub-sections present a brief summary of the
speed of the runoff (i.e. the flood waters) as they flow along
flood studies available for each of the major catchments
the main waterway corridor(s) of the river. The original
and waterways of the Shire. Further details and documents
flood study utilised a combination of RAFTS hydrological
associated with each of the studies discussed here can be
modelling and one dimensional (1D) MIKE11 hydraulic
found via the Council’s Flood Information Repository modelling. 1D modelling refers to the basic “spine and rib”
established as part of this Plan. structure of the model. The spine being the waterway and
the ribs being linear cross sections of the terrain and river
The community can assess information from this repository
bed profile spaced along the River.
through an online flood search request.
Calibration of the original flood study models was
5.1 Noosa River Catchment Flood primarily limited to a single historical event recorded in
Studies February 1992. The event was considered a major flood
event with a reasonable selection of recorded flood levels
The Noosa River catchment covers approximately 106,000 for calibration. Another major flood event had occurred
hectares and extends from the Cooloola National Park in in 1968 however records for this event were sparse and
the north to the coastal township of Peregian in the south. in some cases determined to have been unreliable and
inconsistent with other relative historical records. Other
The catchment accounts for approximately half of Noosa significant historical events which occurred within the
Council local government area. catchment and river system in the early to mid 1970’s were
determined to have been too minor for calibration.
3
Noosa River Flood Study Noosa River Flood Study, by John Wilson & Partners Pty Ltd and Lawson & Treloar Pty Ltd, May 1995.
Noosa Council | Flood Management Plan | Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.