Log in to see the plans as drawn6.4 GridFlow flood extent estimation The absolute flood levels and flood flow velocities
T
determined by the GridFlow analysis are not suitable for
F
The GridFlow flood extent estimation project was setting minimum floor levels or for estimating flood flow
A
conducted by the Sunshine Coast Council across all forces. More detailed, local calculations and observations
DR
catchments of the Sunshine Coast. would be required to inform these values. GridFlow flood
extents may be a useful trigger for highlighting potentially
The project’s aim was to prepare a preliminary estimate of
flood sensitive locations that are beyond the limits of
flood inundation extents for a 1% AEP flood event, for all
existing flood models.
identified water courses.
The analysis process utilised to determine the preliminary
6.5 Key initiatives – Flood mapping
flood extent was based upon GIS algorithms which
The implementation plan will include initiatives that aim
determined contributing catchment areas at regular
to –
increments along a waterway and then estimated flood
discharge for each location using standard Rational • Review the flood hazard area mapping for the Ringtail
Method computations. Creek sub-catchment (Cooroibah area) following
completion of the Noosa River Flood Study Upgrade.
A flood extent was then estimated at each location by
• Update disaster management flood mapping series to
applying the computed flood discharge to the standard
reflect flood mitigation works and completion of the
Mannings equation based upon a cross section derived
Noosa River Model Upgrade.
from a Digital Elevation Model (DEM). The resulting
flood extent provides a preliminary estimate for flood • Prepare and maintain flood mapping layers showing
inundation extents. These estimated flood extents do not flood levels, flood extents and associated minimum
consider local channel features or structures which may floor levels for existing and future climate.
influence the actual extents of inundation. • Include 1% AEP flood contour mapping and associated
minimum floor levels mapping, 1%AEP flood extents
In the absence of more detailed local flood modelling the
and depths to Council’s mapping system for officer
GridFlow flood estimation method is a useful first-pass for
assess.
identifying locations that may be subject to potential flood
inundation from a 1% AEP flood event.
Noosa Council | Flood Management Plan | Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.