Original source · versioned page text
2016-07-18 General Committee Meeting - Item 3 - Attachment 1 - Flood Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnThe increasing risks of climate related hazards will likely 9.3 Key initiatives – Planning and
T
affect council in the areas of— policy
A F
• Litigation and legal liability
The implementation plan will include initiatives that aim
DR
• Community expectations to –
• Land use planning and development • Review planning scheme provisions with regards
• Asset and infrastructure planning, design and to flooding to ensure alignment and outcomes are
management consistent with principles adopted via this Flood
Management Plan.
• Financial sustainability.
• In conjunction with the preparation of a new planning
The 2016 Planning Scheme flood hazard area overlay scheme prepare a planning scheme policy outlining
includes parameters which reflect future climate conditions preferred methods and parameters for flood studies
for 2100. These parameters include an increase in rainfall and flood management.
intensity for severe weather events and increases in mean
• Include as part of the planning scheme flood hazard
sea levels over time. To reflect these conditions the design
mapping the areas of maximum flow velocities to
rainfall temporal patterns have been increased by 20%18
assist with development assessment and building and
and mean sea levels raised by 800mm19. These values are
infrastructure design.
consistent with current recommendations and industry
practice for Queensland communities. • Enforce council’s position requiring gravity fed
carparks for new residential development and ensure
Council has commenced the preparation of a Climate there is improved clarity on this in the new planning
Change Adaptation Plan for Noosa Shire. The plan scheme.
will focus on climate related hazards such as flooding, • Establish an internal flooding working group to
storm surge, extreme storm events, coastal erosion and help coordinate flood management functions across
permanent inundation from sea level rise. It will also council and to assist with facilitating council wide
look at adaptation for bushfire hazard and biodiversity input into developing planning provisions and council
conservation. The plan will identify the coastal hazards, guidelines related to flooding.
risks, and vulnerable areas and assets. It will investigate
• Support members of the flood working group by
actions to help minimise the exposure of new assets to
offering professional development opportunities
future damages (eg building extra flood resilience into new
related to planning and policy with regards to flooding.
roads and bridges) and options for improving the resilience
of existing assets and communities. • Prepare a climate change adaptation plan that
addresses future flood hazard risk and the likely
The outcomes of the Climate Change Adaptation Plan will associated consequences for vulnerable communities
be important for informing policy responses for the new and infrastructure and identifies future options for
planning scheme, as well as community, infrastructure and discussion with the community.
financial planning.
18
Increasing Queensland’s resilience to inland flooding in a changing climate: Final Report on the Inland Flooding Study. A joint project of
Department of Environment and Resource Management, Department of Infrastructure and Planning and Local Government Association of
Queensland. 2010
19
The projected sea-level rise of 0.8 metres by the year 2100 is based on climate modelling and probable scenarios of world development
presented in the Forth Assessment Report released in 2007. See IPCC, 2007: Climate Change 2007: Synthesis Report. Contribution of Working
Groups I, II and III to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change [Core Writing Team, Pachauri, R.K and
Reisinger, A.(eds.)]. IPCC, Geneva, Switzerland, 104 pp.
Noosa Council | Flood Management Plan | Page 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.