Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2016-07-18 General Committee Meeting - Item 3 - Attachment 1 - Flood Management Plan

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Hydrologic study/investigation (with respect to flood




                        T
studies) means a study aimed at determining rainfall and




                      F
associated stream flows in a range of scenarios (see flood




                    A
study).




                 DR
Hydrology is the term given to the study of the rainfall
and runoff process; in particular, the evaluation of peak
flows, flow volumes and the derivation of hydrographs for
a range of floods.

Overlay means an extra layer of assessment in planning
schemes. The provisions of an overlay code are usually
triggered by overlay maps that depict extra information to
the information on the zoning maps.

Planning scheme is a local planning instrument for
regulating development in Queensland. Planning schemes
regulate what development must be assessed before it can
be undertaken, the type of assessment required and the
criteria used in an assessment in each council region. They
also contain codes with which self-assessable development
must comply.

Bathymetric survey is information relating to river
and lake bed surfaces. Bathymetric survey is typically
undertaken below normal water surface levels. (see chapter
7 of this document)




                                                              Noosa Council | Flood Management Plan | Page 40
Log in to download the original file

2016-07-18 General Committee Meeting - Item 3 - Attachment 1 - Flood Management Plan(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.