Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2016-07-18 General Committee Meeting - Item 3 - Attachment 1 - Flood Management Plan

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                   T
Downstream of Tewantin, peak flood levels are governed        The Noosa River catchment is large and much of it is




                               A F
by storm surge flooding; upstream of Tewantin, peak flood     relatively flat. The two large lakes along the river, Lakes




                            DR
levels are governed by freshwater river flooding behaviour.   Cootharaba and Cooroibah, provide large storage areas
                                                              which also slow down the flow of flood water on its way
                                                              to the river mouth. Lakes Cootharaba and Cooroibah exert
                                                              a significant effect on river flooding behaviour along the
                                                              Noosa River. Floodwaters generated from catchment areas
                                                              upstream of these lakes spread out across the waterbody




Figure 2: Map of major waterways and catchments.




                                                                                      Noosa Council | Flood Management Plan | Page 8
Log in to download the original file

2016-07-18 General Committee Meeting - Item 3 - Attachment 1 - Flood Management Plan(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.