Council archive · source document
07/0786 - MCU - Detached House [As Published] · 132007.786
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007 Operational work that is tidal work or |9. The application involves operational work that is: ( tick the applicable boxes) work in coastal management district LI (i) tidal work*® as defined under the Coastal Protection and Management Act 1995 (the For more information refer to Guide 18. For + . . more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or local government fidal areas refer to Guide 24. (1 (ii) tidal work that is prescribed tidal work"! other than in a canal’? -complete Part P of Form 1: or Uni inswered “none of the above” to Q9, an . wae eget the appteaton romuites assensment bythe D (ii) carried out within a coastal management district under the Coastal Act and for - complete Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked. fan agency cher than EPA isthe assessment (J (@)_ constructing or installing works in a watercourse between MHWS and HAT (ie. Manager for the application, a _ + conutrence agency for the application in other than those works in tidal water) where the development has been determined not Telation to this matter. to be assessable against the Water Act 2000 ; Local government is the assessment manager O (b) constructing a canal‘? intended to be connected to tidal waters; for all prescribed tidal work. . tp , [J (ce) constructing an artificial waterway; [1 @ reclaiming land under tidal water; Le) disposing of dredge spoil or other solid waste material in tidal water; (2 (f) interfering with quarry material on State coastal land above high-water mark; (1 (g) draining or allowing drainage or flow of water or other matter across State coastal land above high-water mark; [1 (h) removing or interfering with coastal dunes on land, other than State coastal tand, that is in an erosion prone area and above high-water mark; (1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, above high-water mark; or (iv) none of the above. Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es) mark information refer to Guide 18. For C1 (i) tidal work'3 as defined under the Coastal Protection and Management Act 1995 (the more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; of Ulnar eee Sate 1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; or Q10, the application triggers referral to C1 ii) carried out within a coastal Management district's under the Coastal Act and for - Sigemareanenot 7 (hetine Stet C1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Pari Local govemment is the assessment manager for all prescribed tidal work. Coastal management 41. For more information refer to Guide 18. Dt) “amaterial change of use assessable under a planning scheme involving operational Untess you answered “none of the above” to work carried out completely or partly in a coastal management district's Q11, the application requires assessment by the 7 . . . . . Environmental Protection Agency (EPA). LC (ii) a material change of use assessable under a planning scheme involving building If an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is - manager for the application, EPA is . ‘ . concurrence agency for he applicabon in + the construction of a new premises with a GFA" of at least 1000m? relation to this matter. + the enlargement of the GFA of existing premises by more than 1000m? LI (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated completely or partly in a coastal management district LI (iv) reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with the construction of a canal’? - complete Part M of Form 1 El (v) none of the above 10 Tidal work is defined in sch 10 of the IPA. 11 Prescribed tidal work is defined in the Coastaf Protection and Management Regulation 2003 ang includes certain tidal works completely or partly within a local government tidal area. 12 Canal means canal as defined under the Coastal Protection and Management Act 1995 13 Tidal work is defined in sch 10 of the IPA. 14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes cerlain tidal works completely or partly within a local government tidal area. 15 Coastal management district Is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a coastal management district under section 47(2} of thal Act. 16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed. 17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be accompanied by the application for the operationat works to construct the artificial waterway. Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0786 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.