Council archive · source document
07/0786 - MCU - Detached House [As Published] · 132007.786
INTEGRATED PLANNING ACT 1997
Land owner's consent (if applicable)
Section 3,2.1(3) of the {PA prescribes that an
application must conlain, or be supported by, the
written consent of the land owner/s, if the application
involves:
(} amaterial change of use;
(3) reconfiguration of a bot;
ii) work on land below high-water mark & not within a
canal as defined under the Coastal Protection and
Management Act 1995;or
(tv) work on rail corridor land defined under the
Transport Infrastructure Act 1994.
Section 3.8.1{2}{a) of the IPA provides that
jandowner’s consent Is not required for a mobile or
temporary ERA .
For more information refer to Guide 1
20.
. Part A, Version 2.4, 29 May 2006
Land owner's consent to the making of this application:
Name
Signature Date
(i) See attached consent letter.
Resource entitlement (if applicable}
Section 3.2.1(5) of the IPA requires evidence of
resource entitlement be given for applications that
involve a prescribed State resource.
Section 3.2.1(10)(a)(ti) of the iPA prescribes that an
application cannot be taken to be properly made
without evidence of the resource entitement.
Advice for completing Q21 & 22 .
Refer to schedule 10 of the Integrated Planning
Regulation 1998 that prescribes the nature of evidence
required by the State in support of the lodging of this
development application,
Adylce for completing Q23
The information In (I) ~ (v) Is mandatory If evidence ts
required under Q22 (il) or (ill) above,
‘The official stamp of the Department of Natural
Resources, Mines and Water Is mandatory where the
application Involves any water of riverine quarry
material under the Water Act 2000.
Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. 23 (vi) must be
completed if the evidence is time limited,
21.
22,
23.
Does this application involve a State resource prescribed under a regulation (other than involving
quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
XI NO - go to. 24 [1 YES - goto a22
This application is accompanied by evidence: (tick applicable box)
oO (i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(vi)
(1 (i) the chief executive of the department administering the resource is satisfied the
development is consistent with an allocation of, or entitlement to, the resource — go
fo Q23 ,
D (ili) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource ~ go to Q23
Evidence of the resource entitlement:
(i) Resource entitlement / “ details
(i) Name of a officer
(iii) Position of “eet officer
(iv) Signature of delegated officer
(vii) Official stamp of the department
administering the resource (if
applicable)
(v) Date
(vi) pe date of evidence a
Assessment triggers 24, Is the IDAS Assessment Checklist completed and attached to this application?
This checklist d it apply if th licatit ies ke ft
the completion Oe ed e ofthe Form onfy. YES [INO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been properly made
Plans / drawings | reports 25. Plans/drawings/reports accompanying this application:
An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope of the proposal
and any potential impact.
Plan / Drawing { Report Number
{i) See Attached Report
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager's)
| DATE
[reew (7F.00
RECEIVED
| b-L07
REFERENCE
NUMBERIS
RECENeeeeS Void Apr |
J
(2007/76
To.
Date ofengagement / /
Notification of Engagement of Private Certifier (Optional formal)
Accreditation Number:
Council, have been engaged as the private cerfifier for the building work referred to in this application.
__ Name: Signature:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0786 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.