Council archive · source document
07/0786 - MCU - Detached House [As Published] · 132007.786
INTEGRATED PLANNING ACT 1997
Material change of use
assessable against a local government's planning scheme
Part D, Version 2.0, 4 October 2004
_
us |
a.
Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a local governments planning scheme.
Nature of the application
A development permit authorises
development to occur, while a preliminary
approval is a step in the approval process
and does not authorise development to occur.
1.
This application is for: (tick 1 or both if appticable)
(1 Preliminary approval for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme (ie.
consideration of the proposal concept)
AND/OR
XX] Devetopment permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.
The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the definition of “gross floor area” go to *
the planning scheme against which the | Detached Housing Zone J
pplication will be assessed,
3. Existing gross floor area: (if epplicable) [ NA |
4. Are there any existing easements on the land?
(No
[Kd YES ~ attach plans of the location and details of the purpose of the easement
Material change of use details 5. Details of the change to the use of the fand: (eg. vacant land to shopping centre, house to apartment building,
vacant land to industry (tyre manufacturing) etc.)
[ Vacant land to detached house |
6. Number of employees: | N/A |
7. Operating days and hours: | N/A
Associated building works details (if (g Site cover: N/A
applicable)
For the definition of ‘site cover’, “gross floor 19 Gross floor area: N/A
area” and “storey” go to the planning scheme
inst which th lication will be A .
assessed, eine ap Peon 10. Number of on-site car parking spaces: | N/A
11. Number of storeys / maximum height above natural ground: N/A
12. Number of employees N/A
13. Hours and days the use will operate | N/A |
Associated operational works details | 14. Details of associated operational works (eg. landscaping, cut and fil, drainage, road works etc.)
{if applicable)
NIA |
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY {applicable to assessment manager)
DATE RECEIVED
REFERENCE
NUMBERIS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0786 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.