Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2022.05.13_Unit 1_11 Ventura Drive_Sunrise Beach_DETTORI & CARUSO_Townhouse Renovation_Final Issue

of 37

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (31.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

GENERAL CONSTRUCTION                                                                               GIRDER TRUSS                                                                         SPECIFIC CONSTRUCTION
1: ALL TIMBER FRAMED WALLS TO WET AREAS TO BE LINED WITH F.C.                                      ALL GIRDER TRUSSES TO BE SUPPORTED BY MIN. 3/ MGP10 STUDS OF A SIZE                  - SELECT CUST-ORB ROOF SHEETING TO SELECTION AT 21.5° (MIN. 5°)
2: FLOORS TO ALL WET AREAS TO HAVE A FALL TO A FLOOR WASTE.                                        COMMON TO THE WALL OR 2/ MGP10 OF A SIZE COMMON TO THE WALL AT                       PITCH TO MANUFACTURERS DETAILS.
                                                                                                   EACH SIDE OF AN OPENING IN ADDITION TO THE JAMB STUDS WHEN THE
3: ALL HANDRAILS TO BE 1000MM MIN. ABOVE FINISHED FLOOR (CARPET,TILES ETC),                        GIRDER TRUSS IS LOCATED OVER AN OPENING WHICH DOES NOT EXCEED                        - STRAMIT SPEED DECK ULTRA CONCEALED FIX OR KLIPLOCK 700 ROOF
   WITH 125MM MAXIMUM OPENINGS TO BALUSTRADING.                                                    2460MM IN WIDTH UNLESS NOTED OTHERWISE ON THIS DRAWING.                              SHEETING TO SELECTION AT 1°/3° PITCH TO MANUFACTURERS DETAILS.
4: W.C.'S TO HAVE A MIN. CLEAR WIDTH OF 900 MM.                                                    IF IN THE EVENT THAT THE GIRDER TRUSS LOCATES ARE ALTERED, THE
                                                                                                                                                                                        - 75 x 38 F11 BATTENS AT 900 CRS. WITH 1/75mm TYPE 17 No. 14 BATTEN SCREW FIX.
                                                                                                   BUILDER & OR THE TRUSS MANUFACTURE ARE TO INFORM THIS OFFICE SO
5: INWARD OPENING DOORS TO W.C.'S TO HAVE LIFT OFF HINGES.                                                                                                                              (BATTENS MAY NEED TO BE INSTALLED AT 450CRS IF NO OTHER METHOD OF FALL ARREST IS
                                                                                                   THAT AMENDED DRAWINGS CAN BE ISSUED OR PROVIDE ALTERNATIVE R.P.E.Q.
6: FIRST FLOOR TIMBER FLOORS TO ALL WET AREAS TO HAVE AN APPROVED "WET AREA"                                                                                                            PROVIDED)
                                                                                                   CERTIFIED SUPPORT/JAMB MEMBER SPECIFICATIONS.
7. FLOORING FIXED IN ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS.                                                                                                                  - RAFTERS/TRUSSES AS PER FRAMING PLAN AT 900 MAX. CRS.
8: ALL LAMINATED BEAMS TO HAVE FULL WIDTH BEARING AT EACH END.                                                                                                                          FRAMING ANCHOR TO VERANDAH PLATE & FRAMING ANCHOR/LOOP STRAP TO VERANDAH PLATE.
9: MASONRY CONSTRUCTION TO CURRENT VERSION OF A.S. 3700.
                                                                                                   WORKPLACE HEALTH & SAFETY OVERVIEW
                                                                                                                                                                                        - VERANDAH PLATE AS PER FRAMING PLAN M12 dia BOLT TO
10: WRITTEN DIMENSIONS TO HAVE PREFERENCE OVER SCALED DIMENSIONS AT ALL TIMES.                     - THESE NOTES DO NOT OVERRIDE THE BUILDER'S/PRINCIPLE CONTRACTOR'S CONTROL OF THE    POST W ITH 50mm MAX. NOTCH TO TIMBER POSTS.
                                                                                                   WORK SITE. THEY FORM A GENERAL SUPPLEMENTARY GUIDE AS EACH BUILDER HAS THEIR
                                                                                                                                                                                        - ALL FRAMING AS PER FRAMING PLANS & 'DESIGN-IN-HYNE', 'DESIGN IT', AND 'SMARTFRAME'
                                                                                                   OWN PREFERRED WORK METHODS AND W.H.S. SOLUTIONS.
SITE NOTES                                                                                                                                                                              REPORTS AND RECOMMENDATIONS.
- PLATFORM IMMEDIATELY SURROUNDING THE RESIDENCE TO FALL AWAY FROM THE                             - ALL BUILDING WORK HAS AN ELEMENT OF WORK PLACE HEALTH AND SAFETY RISK.             - M12dia.BOLTS FOR TIEDOWN AT 1350 CRS. JAMBS & CORNERS FROM
RESIDENCE AT A SLOPE OF 1 IN 20 MINIMUM TO A EARTH DRAIN AS INDICATED ON THE SITE                  THE BUILDER/PRINCIPLE CONTRACTOR IS TO PREPARE AND HAVE ON DISPLAY A SITE SPECIFIC   TOP PLATE THROUGH TO FLOOR FRAME.
PLAN.                                                                                              SAFETY PLAN.THAT SITE SPECIFIC SAFETY PLAN IS TO BE REVIEWED AND UPDATED AS NEEDED   or
- THE SURFACE DRAINAGE TO DISCHARGE EVENLY WITHIN THE SITE AND WITHOUT                             TO REFLECT THE CHANGING SITE CONDITIONS.                                             G.I. STRAP TOP AND BOTTOM PLATES & M12dia. BOLT BOTTOM PLATE TO
NUISANCE TO ADJOINING PROPERTIES.                                                                  THE BUILDER IS TO ENSURE ALL PERSONNEL ON SITE ARE BRIEFED ON THE RELEVANT SAFETY    FLOOR FRAME AT 1350 CRS.
- CUT AND FILL BATTERS NOT TO EXCEED A MAXIMUM SLOPE OF 1 VERTICAL TO ...2...                      ISSUES AS APPLICABLE WHILE ON THE SITE.
                                                                                                                                                                                        - SELECT 19mm FLOORING TO MANUFACTURERS SPECIFICATIONS.
HORIZONTAL. (UNLESS OTHERWISE STATED BY A GEOTECHNICAL ENGINEER.
                                                                                                                                                                                        DECKING TO BE HWD WITH 3-4mm GAPS FOR AIR FLOW.
- 1000 MAXIMUM HIGH TIMBER RETAINING WALL WITH 65 DIA AG PIPE (TO DISCHARGE TO                     - THE BUILDER IS TO ERECT A NOMINAL 1.8M HIGH TEMPORARY FENCE AND ACCESS GATE TO
STORMWATER LINE) AND GRANULAR BACK FILL BEHIND AND TO BE WHOLLY CONTAINED                          ISOLATE THE CONSTRUCTION AREA FOR PUBLIC ACCESS.                                     - JOISTS AS PER FRAMING PLAN AT 450ctrs (AS SHOWN). FRAMING
WITHIN THE SITE, ONLY IF INDICATED ON THIS SITE PLAN.                                                                                                                                   ANCHOR TO BEARER & SADDLEGRIP TO POLE PLATE. (MANUFACTURERS
- HEIGHT OF FENCE INCLUDING THE HEIGHT OF A RETAINING WALLS ARE NOT TO EXCEED 2.0                  - THESE DRAWINGS HAVE BEEN COMPILED WITH ALLOWANCE FOR ANTICIPATED SPACE             CONNECTION DETAILS TO TAKE PRECEDENCE FOR ENGINEERED
METRES ABOVE NATURAL GROUND LEVEL, ONLY IF INDICATED ON THIS SITE PLAN.                            REQUIREMENTS FOR ACCESS AND SCAFFOLDING.                                             MEMBERS)
- DRIVEWAY SLOPE NOT TO EXCEED 1 VERTICAL TO 4 HORIZONTAL.                                                                                                                              - 1 ROW MID SPAN BLOCKING TO MATCH JOIST SIZE TO ANY SPAN EQUAL OR GREATER
- DRIVEWAY AND FOOTPATH CROSS OVER BY OWNER.                                                       - THE BUILDER IS TO ENSURE THAT A LEVEL AREA IS PROVIDED AS REQUIRED FOR             THAN 3600. BLOCKING TO ENGINEERED JOISTS AS PER MANUFACTURERS WRITTEN
    = DENOTES SURVEY PEG OR ASSUME SURVEY PEG                                                      SCAFFOLDING FOR CONSTRUCTION WORK AT HEIGHTS. THE BUILDER IS TO CONSULT WITH THE     SPECIFICATIONS.
                                                                                                   SCAFFOLD SUPPLIER AND PROVIDE ADDITIONAL FIXING POINTS TO THE BUILDING TO SECURE     - BEARERS AS PER FRAMING PLAN 2/M12 dia BOLT TO POST MAX. 38mm NOTCH TO POST.
ROOF WATER                                                                                         THE SCAFFOLDING IF REQUIRED.
                                                                                                                                                                                        - 75 X 75 X 4mm SHS COLUMNS FULLY CAPPED AT ENDS SET MIN. 450
RAINFALL INTENSITY OF 250mm/hr WITH ARI OF 20 YEARS (BRISBANE) AS PER PART 3.5.2 OF                - IF THE SCAFFOLD SYSTEMS SELECTED BY THE BUILDER REQUIRES ADDITIONAL SPACE OR       INTO MASS CONCRETE PAD FOOTINGS TO ENGINEERS DETAILS.
THE B.C.A., THE ROOF AREA PER DOWNPIPE IS CALCULATED USING THE STRAMIT QLD. QUAD                   BUILDING FIXING POINTS, THE BUILDER IS TO REQUEST (VIA THE CLIENT) ADDITIONAL
EAVES GUTTER WITH A EFFECTIVE CROSS-SECTIONAL AREA OF 8100 SQ. MM. ACHIEVING A                     CONSTRUCTION DRAWINGS.                                                               - STEEL BEAMS AS PER FLOOR FRAMING PLAN TO BE FULLY SITE WELDED TO S.H.S. COLUMNS AT
MAXIMUM ACTUAL ROOF AREA PER DOWN PIPE OF 50 SQ.M. WHICH GIVES A MAX. PLAN                         THESE ADDITIONAL DRAWINGS AND DOCUMENTATION WILL BE TREATED AS A VARIATION AND       EACH END OR M12dia. BOLTED TO TIMBER POST AND M12dia. BOLTED TO 75x38 F14 FIXING PLATES
DIMENSION OF 49.8 SQ.M. AT 5 DEGREES, 49.2 SQ.M. AT 10 DEGREES, 48.3 SQ.M. AT 15                   CHARGED AT THE HOURLY RATE AS DEFINED IN THE BUILDING DESIGN CONTRACT OF             AT STAGGERED 600ctrs. OR M12dia. CHEMICAL ANCHOR TO BLOCKWORK AS NOTED
DEGREES, 47.0 SQ.M. AT 20 DEGREES, 45.3 SQ.M. AT 25 DEGREES AND USING 100 X 75MM                   ENGAGEMENT.                                                                          - 100 THICK CONCRETE SLAB TO ENGINEERS DESIGN ON 50mm BEDDING SAND, 0.2mm
DOWNPIPES. DOWNPIPE SPACING NOT TO EXCEED 14M.
                                                                                                                                                                                        POLYTHENE SHEETING & TERMITE TREATMENT SYSTEM TO A.S.3660.1(2000).
                                                                                                   - THE BUILDER IS TO ERECT TEMPORARY PLATFORMS OR SCAFFOLDS FOR THE SAFER             (SYSTEM PROVIDED MUST GIVE 50 YEAR GUARANTEE AGAINST FAILURE)
AS PER PART 3.1.2 OF THE B.C.A. IN ACCORDANCE WITH AQS/NZS 3500.3.2, UPVC STORM                    ERECTION OF THE ROOF, CEILING AND HIGH WALLS, AS REQUIRED TO ACHIEVE THE W.H.S.
WATER PIPELINES HAVING A SMOOTH (NON-PROFILED) INTERNAL BORE WITH A FALL OF                        OUTCOMES.
1:100 MIN. & A NOMINAL DIAMETER OF 100MM ACHIEVES A HYDRAULIC CAPACITY OF 8L/s,                                                                                                         PHYSICAL BARRIERS AGAINST TERMITES:
GIVING A MAX. ACTUAL ROOF AREA OF 114.7 SQ.M. OR A MAX. PLAN DIMENSION OF 110.2                    - ALL SUSPENDED INTERNAL TIMBER FLOORS ARE DESIGNED AS PLATFORM FLOORING TO
SQ.M AT 5 DEGREES, 105.2 SQ.M. AT 10 DEGREES, 101.0 SQ.M. AT 15 DEGREES, 97.2 SQ.M. AT                                                                                                  STEEL POSTS TO HAVE AT LEAST ONE END FULLY SEALED AND WELDED WITH 8mm
                                                                                                   PROVIDE SAFE ACCESS AND MOVEMENT. CUT IN FLOORING MAY ONLY BE USED WHEN LAID         PLATE/FLANGE.
20 DEGREES, 93.2 SQ.M. AT 25 DEGREES PER STORMWATER PIPE. (WHERE CONNECTING TO                     OVER A PLATFORM FLOOR.
EXISTING STORMWATER FACILITIES; CAPACITY MUST BE FULLY INVESTIGATED BY THE                                                                                                              TIMBER POSTS FIXED TO GALVANISED STEEL STIRRUPS. MINIMUM 75mm CLEAR GAP ABOVE
CONTRACTOR PRIOR TO CONNECTION AND/OR UPGRADED TO SUIT.                                            - ALL DECKING IS TO HAVE SCAFFOLDING OR SUB-FLOOR PLATFORMS AND TEMPORARY            FINISHED GROUND FOR INSPECTION.
                                                                                                   SAFETY FLOORING AS REQUIRED TO PROVIDE SAFE CONSTRUCTION.                            GALVANIZED ANTCAPS AS APPROPRIATE, FULLY PARGED OR BONDED TO SLABS IN
                                                                                                                                                                                        ACCORDANCE WITH VOLUME II OF THE BUILDING CODE OF AUSTRALIA.
                                                                                                   - ALL STAIRWELL FEATURE LOWER LEVEL HIGH CEILING VOIDS IN THE FLOOR ARE TO BE
BRANDING OF STRUCTURAL                                                                             PROTECTED WITH TEMPORARY FLOORING OR OTHER FALL PROTECTION.
EACH SHEET OF STRUCTURAL GRADE PLYWOOD SHALL HAVE THE FOLLOWING INFORMATION
LEGIBLY AFFIXED THEREON BY THE MANUFACTURER AT THE POINT OF MANUFACTURE AT LEAST                   - ALL ROOFING IS TO BE FITTED WITH STRUCTURAL ANTI-FALL ROOF BATTENS @ MAXIMUM 450   NOTE:
ONCE.                                                                                              CTRS.                                                                                REFER TO ATTACHED TIE-DOWN REPORT FOR DETAILED CONNECTION SCHEDULE.
(A) THE MANUFACTURERS NAME OR REGISTERED MARK.                                                     THESE BATTENS MAY ALSO BE THE STRUCTURAL ROOFING BATTENS.                            ALL CONSTRUCTION TO BE CARRIED OUT IN STRICT ACCORDANCE WITH AS1684.
(B) THE WORD 'STRUCTURAL' OR PRODUCT DESCRIPTION.                                                                                                                                       VARIATIONS FROM TIE-DOWN SCHEDULES PROVIDED SHOULD BE CHECKED AND CERTIFIED
(C) REFERENCE TO THE STANDARD, i.e., AS/NZS 2269.                                                  - THE BUILDER IS TO ENSURE FULL VENTILATION OF THE WORK SITE WITH REGARDS TO THE     BY AN R.P.E.Q. ENGINEER.
(D) THE GRADE OF OUTER PLIES (FACE FIRST, BACK LAST), e.g., CC, CD OR DD.                          USE OF CHEMICALS, SUCH AS, BUT NOT LIMITED TO ; ADHESIVES, SEALANTS, PAINTS AND
     WHERE NON STANDARD VENEER QUALITY HAS BEEN USED IN THE PLYWOOD                                CLEANERS.
     ASSEMBLY. THIS REQUIREMENT MAY BE MET BY REFERENCE TO A PRODUCT
    NAME OR DESCRIPTION THAT REFERENCES THE NON-STANDARD VENEER                                    - THE BUILDER IS TO INSTALL AN EYEBOLT THROUTH THE ROOF SHEETING CLOSE TO GUTTER
    QUALITY IN THAT PRODUCT'S SPECIFIC MANUFACTURING SPECIFICATION.                                IN A CONVENIENT LOCATION FOR SECURING A LADDER FOR SAFER ROOF ACCESS, DURING AND     TERMITE PROTECTION IN ACCORDANCE WITH A.S 3660 (2000):-
(E) THE BOND TYPE OF THE GLUE LINE, i.e., ABOND.                                                   AFTER CONSTRUCTION, THIS EYEBOLT ON THE ROOF WILL HAVE TO CORRESPOND WITH A          NOTE: TERMITE MANAGEMENT SYSTEM IN STRICT ACCORDANCE WITH BCA
(F) AN INDICATION OF THE STRESS GRADE OF THE SHEET, e.g., F7.                                      FIRM, LEVEL PAD AT GROUND LEVEL, SUITABLE FOR LOCATING THE BASE OF THE LADDER.       REQUIREMENTS AND INSTALLED ONLY BY Q.B.S.A. LICENSED AND INSURED PROVIDERS.
(G) THE PANEL CONSTRUCTION CODE e.G., 17-24-7
(H) IF IMMUNIZED OR PRESERVATIVE-TREATED, BRANDING IN ACCORDANCE WITH AS/NZS                                                                                                            HOME OWNER IS TO BE INFORMED OF MAINTENANCE REQUIREMENTS BEFORE A
1604.3.                                                                                                                                                                                 SYSTEM IS ADOPTED.
                                                                                                                                                                                        SUGGESTED OPTION 1: G.I. ANTCAPS FULLY PARGED TO FULL PERIMETER, MIN. 100 CLEAR OF
BRACING                                                                                                                                                                                 FINISHED GROUND AND TERMI-MESH TO ALL SLAB PENETRATIONS, INSTALLED BY LICENCED
                                                                                                                                                                                        INSTALLER, AND MAINTAINED IN ACCORDANCE WITH MANUFACTURER'S WRITTEN
TB1: ANGLED BRACE IN ACCORDANCE WITH                                                                                                                                                    INSTRUCTIONS.
A.S. 1684.2-1999 MANUAL, TABLE 8.18, FIGURE (c) = 1.5kN/M                                                                                                                               SUGGESTED OPTION 2: FULL RETICULATED UNDERSLAB & PERIMETER SYSTEM TO
TB4B: STRUCTURAL PLY SHEET BRACING IN ACCORDANCE WITH A.S. 1684.2-1999                                                                                                                  MANUFACTURERS DETAILS.
MANUAL, TABLE 8.18, FIGURE (h) = 6.0 kN/M                                                                                                                                               ALL SLABS TO COMPLY WITH A.S.2870-COMPACTED AS REQUIRED
* PLY BRACING PANELS LESS THAN 900 LONG TO A MINIMUM WIDTH OF 600, TO HAVE 1/M12 ROD                                                                                                    NOTE:
AT EACH END IN ACCORDANCE WITH A.S. 1684.2-1999 CLAUSE 8.3.6.5                                                                                                                          SYSTEM PROVIDER MUST PROVIDE 50YEAR GUARANTEE AGAINST SYSTEM FAILURE

        PLYWOOD                   STUDS @ 450ctrs
      STRESS GRADE
           F8                     7mm THICK PLYWOOD
           F11                    6mm
           F14                    4mm                                                                                                                                                   NOTE:
           F27                    4mm                                                                                                                                                   ALL SLABS/FOOTINGS/RETAINING WALLS TO ENGINEER'S DETAIL
                                                                                                                                                                                        DESIGN AND SOIL TEST RECOMMENDATIONS
PLYWOOD NAILING TYPES & STRENGTHS REFER TO PAA "STRUCTURAL PLYWOOD WALL
BRACING" LIMIT STATE DESIGN MANUAL, TABLE 1: MINIMUM FASTENER SPECIFICATION.
BRICK PIERS IN ACCORDANCE WITH "BRICK DEVELOPMENT RESEARCH INSTITUTE"
CLAY BRICK CONSTRUCTION DETAILS,
VOLUME No.1, TABLE 12 = 1.5kN/M IN EACH DIRECTION.
M4(B) BRACEBOARD SHEET IN ACCORDANCE WITH AUSTRALIAN HARDBOARDS M4
PRODUCT MANUAL TYPE B = 6.0 kN/M
M4(C) BRACEBOARD SHEET IN ACCORDANCE WTIH AUSTRALIAN HARDBOARDS M4
PRODUCT MANUAL TYPE C = 9.0 kN/M
*BRACING PANELS LESS THAN 900 LONG TO A MINIMUM WIDTH OF 460, TO HAVE
1/M12 ROD AT EACH END IN ACCORDANCE WITH AUSTRALIAN HARDBOARDS M4
PRODUCT MANUAL TYPE E = 6.0 kN/M
JHFC JAMES HARDIE FBRE CEMENT IN ACCORDANCE WITH JAMES HARDIE
BRACING FIXING MANUAL TABLE 4 = 5.3 kN/M

                                      JMF DESIGN                          CLIENT:                                     LOCATION:                    Project number                                                                                              NO:         DATE:            AMENDMENTS:
                                      27 Sunhine Beach Road               Sasha Dettori & Tony Caruso                                              Ventura 2022        General Notes                                                                                           3/01/2022     Existing Plans
                                      Noosa Heads Q 4567                                                              1/11 Ventura Drive,                                                                                                                                      01/02/2022    Concept Plans
                                                                                                                                                                                                                                                                N1
                                                                                                                      Sunrise Beach Qld                                                                                                                                        24/02/2022    Client Amendments
                                     e: [email protected]             PROJECT:                                                                 Date                Scale              Drawn by          JG
                                                                                                                      4567                                                                                                                                                     03/03/2022    Client Amendments
                                     www.jmfdesign.com.au
                                                                          Townhouse Renovation                                                     May 2022                                                                                                                    13/05/2022    Final Issue
                                                                                                                                                                                          Checked by        JMF
                                     QBCC 15200440
Log in to download the original file

2022.05.13_Unit 1_11 Ventura Drive_Sunrise Beach_DETTORI & CARUSO_Townhouse Renovation_Final Issue.pdf · 31.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.