Council archive · source document
08/0892 - Transport Type 5 - Domestic Marine - Jetty & Boat Building [As Published] · 142008.892
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkhst, Version 21.2, 31 March 2008
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
FAREA : :
42 is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
[XK] No -Gotoas3 [_] Yes
IPA, schedule 8. part 1, lable 4 tem 2. IP Regulation schedule 1, part 2. table 5, hear i{c)
Wild Rivers code (Note: the code does not cufrentiy contain appicable pravisions tor residential industrial or commercial development inside a designated urban
area)
‘VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
BX] No -Gotoos4 [_] Yes
IPA, schedule 8, part 1, table 4, tems 1A-1G; IP Reguiaton, schedule 2. table 2, tem 5 (vegetation clearing). IP Regulation, schedule 2, table 2, flem 34 {koala
conservation); iP Regulation, schedule 1, part 3, table 4, item (vegetation clearing/mild rer area}; Vegetation Mariagement Act 1999, section 22A (vegetation
clearing/wild river area); Wikt Rivers Act 2005, sections 31F and 43A
FTAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
& No - Goto 04.5 O Yes - Answer (a) and (b) below
IPA, schedule 8 part 1, lable 4, dems 3a}; IP Regulation, schedule 7, table 2, tem 8: JP Regulation, schedule 1, part 3, tate 4, dems 3 and 3A; Water Act 2000, section 966A (wild frver
area); Wild Rivers Act 2005, section 43A; relevant wild river declaration, Wiki Rivers Code
45 {s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water}?
XK No Goto Q4.6 O Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). IF NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3{b): IP Regulation, schedule 2, table 2, tem & IP Regulation. schedule }, part 3, table 4. item 3
Wild Rivers code (Note: the code does not currently contain applicable provisions for taking or interfering with artesian water)
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using @ water truck to pump water)?
[X] No -Gotoas7 [[] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, tent 3(o}{0, IP Regutatinn, schedule 7, tabla 2, nem 8: 1P Regulation, schedule t. part J, tale 4, len 3: Water Act 2600, section O86A (yald river ated),
Wild Rivers Act 2005, section 43A; relevant wild iver dacteratin, Wild Rivas Cove
47 ts any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
[X] No -Gotoass {_] Yes
IPA, schedule 8, part 1. table 4, item 3(c){lij: IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, tem 3
Water Act 2000, section 966A (whit tiver area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note. the code does not currently contain applicable provisions for sub artesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump watery?
DX] No - Gotoa49 [_] Yes - Answer both (a) and (b) betow
WA, schedule 8, patt 1 lable 4 dams tte}() and sta}: 1 Regesatnn, schedule 2, table 2, hem 9: iP Regulation, schedie 7, atl J table 4 nen 3A; Water Act 2000, section 9aGb) (atid
fiver arda): telavant wild river declaration, Wild Rivets Code
49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 {] No 0 Yes
(ii) To increase the storage capacity of a referable dam by more than 10% OO No CO Yes
If yes to either or both (i) or (ii) above - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRWis not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 4; IP Regulation, schedule 2, lable 2. tem 10
fTiDAL WORK; WILD RIVER AREA ]
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
[XI] No -Gotoas11 [_] Yes - Answer (a) and (b} below
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0892 - Transport Type 5 - Domestic Marine - Jetty & Boat Building [As Published]Related documentApplication case desk ↗
About this file
- File size
- 479 KB (small file)
- File type
No other editions are linked here.