Council archive · source document
Development Application part 2 of 3 Planning Report - MCU13/0146
18unshine
Council
Coast l fI dREADY]
are you? www.ftoodready.gouu
DISCLAIMERS to the extent of Hooding
on the property. This
Council should only be used as a guide make their own local enquiries
with
Flood intormation provided by and it is recommended that purchasers
or Incomplete FOR THIS INFORMATION.
information may be inaccurate otthe site. NO LIABILITY IS ACCEPTED
to the flooding and drainage history this property. A
regard flood level that could occur on
the highest probable
The property information
supplied does not represent such events would be rare.
level described above may occur, although
the that Council has no
flood more severe than not subject to flooding, simply
does not imply that
the above property is
The absence of flood information
flooding.
nood information for this property this matter.
seek professional advice on
or drainage
issues we recommend you
If there is a history of flooding
THIS INFORMATION
OF
FOR THE ACCURACY
ACCEPTS NO RESPONSIBILITY
SUNSHINE COAST COUNCIL
GLOSSARY OF TERMS
Definition
Term
be completed for a specified property.
The individuaUs reQuesting a Hood search to
flood
Applicant the property for which a
by Council as owning
The individualls that are registered
Registered Owners search is requested. reduced levels
level for defining
Datum (AHD)is the reference
The Australian Height of 0.0 m AHD is
Council of Australia. The level
adopted by the National Mapping
AHD
approximatelv mean sea level. Defined Flood Event.
mathematical modelling or the
A water level derved through
Defined Flood Level which states "Defined Flood
Stte Planning Policy (SPP,2003)
Terminology consistent with for the management of development
a local government
Event is the flood event adopted by
Defined Flood Event
in a particular locality.. storm tide
or occurrence of a flood or
The Annual Exceedance
Probability is the likelihood
usually expressed as a
size or larger in anyone year,
inundation event of a given of 1%,it means that there
is a 1% risk
example, if an event has an AEP
percentage. For
of this event occurring in anyone year. A
in 100)
0.01 or a likelihOOd of 1
(i.e. probability of occurring once in 100 years.
1%AEP be interpreted as only
1% AEP event should not Recurrence Interval) or
called the 100 year ARI (Average
This flood event is also commonly
Q100. relevant
resulls of the anticipated flooding
Is a reference to the
document summarising the
Source of Information to this location.
for which Council has
records.
level from all historic events
Highest Historical Flood The highest flood water
Level recorded.
site where the Highest
Historical Flood Level was
Location Description of A description of the
Recorded Historical Event
Historcal Flood Level occurred.
The date on which the Highest
Date of Historical Event the Town Plan through the
addition
calculated in accordance with
The minimum Ooor level Historical Flood Level.
10 the Defined Flood
Level and the Highest
of the relevant freeboard used as the minimum
floor level.
Minimum Floor Level of these two levels be
Council requires that the higher
the limit to which development
line’ has been set by Council to define
Where a ’regulation is undertaken outside such ’regulation line’.
Flood Regulation Line onto a floodplain, development
may encroach
occurr ng in a unit of time, usually
expressed in millimetres/hour.
The amount of rainfall observed
Rainfa/llntensily of the sea at the tidal station
A tidal datum; the
arithmetic mean of hourly heights 0.0 m AHD
Source: BOM This is approximately
Mean Sea Level of time (preferably 19 years).
over a period
above or below the normal
by a tropical cyclone
The elevation of waler generated
Storm Surge astronomical tide.
in the tropics and is sufficiently
system which develops
A tropical cyclone is a low-pressure km/h greater and gusts in excess of 90
63 or
intense to produce
sustained winds of at least
Tropical Cyclones km/h near the centre. Flood Level. A
above the adopted Defined
A factor of safety usually
expressed as a height and historical and modelling
action
for factors such as wave
freeboard tends to compensate
Freeboard
uncertainties.
F 07 54?S 1277 mllll@tun,".nOCO ’1 QId IIQ~ au
T 07 S47~ 7272
www..",n,hiM ODS,.qlcl.gov~u
Mall Cent.... Old 4560
Locked Bag 72 Sunsl!ine C~~I
Page 3 of 3
Flood Search Cedificate [FSCY3-0809j
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 3 Planning Report - MCU13/0146Related documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.