App 2 - Protest - Internal Roads Review
ABN: 26 602 913 673
E: [email protected]
P: (07) 5568 0180
A: 1/9 Greg Chappell Drive,
Burleigh Heads, QLD, 4220
protestengineering.com
328 Upper Pinbarren Creek Road, Pinbarren Project PTP/03729
RPD: Lot 3 on RP851976 Number: PTP/03729 – 0001 – Rev1
Area: 256,500m2 Project Name: Access Review
Regulatory Authority: Noosa Shire Council
INTRODUCTION
This letter report outlines the design advice with relation to the existing access routes through site, relating to
access to the proposed ‘Mango Cabin’. This assessment is in response to comments received from Noosa Shire
Council requesting a review of site access to ensure that visitors access to the proposed Cabin is ‘safe’.
The scope of this report is to provide an assessment and recommendations for the client (where required) to
improve the existing access track to provide safer access to future Cabins proposed for the site.
Figure 1 – Contextual Site Location (site location bordered blue)
SITE SETTING
The site is located on a on a hillside. The area is well vegetated, with the site containing a number of existing
ponds and water features (some of which overflow over the existing access road in flood events). As per Figure
1 above, it is evident that the much of the site forms part of naturally valley. Figure 2 below, shows a site profile
traced along the access road to the location of the proposed new cabin.
Gold Coast | Sunshine Coast | Melbourne | Emerald
PTP/02903 8 April 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 5 pages
Page 2
Page 2 of 5
B
V
A
V
B
V
A
Figure 2 - Elevation Profile through site (based on 1m LIDAR data). A marks site access from Upper
Pinbarren Road; B marks proposed cabin; Star marks bridge over creek; ‘Red Line’ marks steep access
location
Figure 2 above shows the access from Upper Pinbarren Road, typically graduates up as you progress into the
site, with one particular section where grades are approximately 40% (1 : 25) (highlighted in Figure 2 above). In
addition there is one creek crossings, via a level crossing north of the caretakers house where a spillway overtops
from the pond. Note, access to the site will be via the existing easement (highlighted green on Figure 1).
Access Road Assessment
The existing condition of the access road has been assessed in general accordance with Noosa Shire Councils
Development Guidelines, Institute of Public Works Engineering Australasia (IPWEA) and QUDM. The purpose of
this assessment is to provide recommendations to improve access for the purposes of site visitors (who may not
be familiar with the sites hazards or non 4WD vehicles). This assessment provides a number of
recommendations to improve site access and general traffic safety for purposes of supporting the proposed
Cabin on the site. The key items to be address are as follows:
1. Poor Signage of general site hazards and conditions (i.e. speed, spillway, flood flow depths at
creek crossings etc.)
2. Narrow roads with no designate passing bays
3. General rutting and poor drainage
4. Grade
Table 1 below summarises these features and some recommended remediation strategies. The evidence and
recommendation in Table 1 have been informed by 2no site visits by a Civil Engineer RPEQ on the 16.08.2019
and 17.09.2019, review of Queensland Globe and consideration of Noosa Shire Councils Development
Guidelines.
PTP/03104 – Lot 195, 1164 Cooroy Belli Ck Road, Ridgewood 28 June 2019
Page 3
ABN: 26 602 913 673
E: [email protected]
P: (07) 5568 0180
A: 1/9 Greg Chappell Drive,
Burleigh Heads, QLD, 4220
protestengineering.com
FEATURE CHAINAGE DESCRIPTION REMEDIATION/WORKS IMAGE
Access General Rutting of the road and Regrade access road, provide 2.5% crossfall
Drive evidence of poor drainage to improve drainage. Formalise table drains
Heavy rutting noted in places.
where required. Resurfacing and grading
Where evident regrade and
required in places with 100mm crushed cover with 100mm compacted
stone. road base.
(Note: It is understood that the client
undertakes regularly maintenance of the
access roads as and when required)
Spillway +460m Evidence that there is Provide a concrete lined spillway channel to
Crossing erosion when pond prevent erosion and provide better access. Form concrete lined ‘v’
overtops and crosses the Spillway apron should be approx. 5m wide spillway.
access road. Flows 150mm thick N32 concrete with SL82 steel
evident to cause soft mesh reinforcement with 50mm cover.
ground and may cause Concrete base to have slip membrane and
difficulty for smaller cars min 300mm thick layer of compacted Type
to pass. No flow depth 2/3 gravel laid on geotextile.
indicator to warn drivers Spillway to be formed to ‘V’ channel profile
of flows over road. to min 3.3% section falls and min 2.5% cross
fall to downstream side to direct channel
flow. Provide rock armouring upstream and
downstream of min D50150mm rock 1m
either side of spillway.
Provide Flow Depth indicator and Spillway
Warning sign
Gold Coast | Sunshine Coast | Melbourne | Emerald
PTP/02903 8 April 2019
Page 4
Page 4 of 5
Access +490m Access road does not Provide signage for site users that access
Drive permit passing. upto Mango Cabin is single lane access
(Junction)
Access +570m Access to Mango Cabin is Regrade steep section to 1:4 (25%). Regrade
Drive steep (circa 40%). Poor access road with 2.5% crossfall falling
drainage and evidence of towards the west (left hand side). Formalise
both erosion and rutting table drain on right hand side to intercept
overland flows from upper fields. Access to proposed cabin
PTP/03104 – Lot 195, 1164 Cooroy Belli Ck Road, Ridgewood 28 June 2019
Page 5
ABN: 26 602 913 673
E: [email protected]
P: (07) 5568 0180
A: 1/9 Greg Chappell Drive,
Burleigh Heads, QLD, 4220
protestengineering.com
CONCLUSION
All works detailed above should comply with following general guidelines for both construction and
maintenance:
• IPWEA Drawings RS056
• General Information on the Construction and Maintenance of Vehicle Crossovers on Council Controlled
Land
• Queensland Urban Drainage Manual (QUDM) for the design and construction or rural table drains and
culverts
It is considered that the should the property owner implement the above strategies, continue to maintain clear
site lines, and general road conditions (in accordance Australian and local council guidelines), the vehicular site
safety can be improved for visitors and users of the site.
We trust this information is satisfactory for your current needs. Should you have any questions, please feel free
to contact the undersigned
Protest Engineering
Ryan Hofman
Senior Civil Engineer
BEng (Hons) CPEng CWEM RPEQ 21643
Gold Coast | Sunshine Coast | Melbourne | Emerald
PTP/02903 8 April 2019
Page 6
Page 6 of 5 PTP/03104 – Lot 195, 1164 Cooroy Belli Ck Road, Ridgewood 28 June 2019 [OCR of page images] Page 6 of 5 PROTEST ENGINEERING Synergy // Efficiency // Productivity PTP/03104 — Lot 195, 1164 Cooroy Belli Ck Road, Ridgewood 28 June 2019