Original source · versioned page text
App 2 - Protest - Internal Roads Review
ABN: 26 602 913 673
E: [email protected]
P: (07) 5568 0180
A: 1/9 Greg Chappell Drive,
Burleigh Heads, QLD, 4220
protestengineering.com
CONCLUSION
All works detailed above should comply with following general guidelines for both construction and
maintenance:
• IPWEA Drawings RS056
• General Information on the Construction and Maintenance of Vehicle Crossovers on Council Controlled
Land
• Queensland Urban Drainage Manual (QUDM) for the design and construction or rural table drains and
culverts
It is considered that the should the property owner implement the above strategies, continue to maintain clear
site lines, and general road conditions (in accordance Australian and local council guidelines), the vehicular site
safety can be improved for visitors and users of the site.
We trust this information is satisfactory for your current needs. Should you have any questions, please feel free
to contact the undersigned
Protest Engineering
Ryan Hofman
Senior Civil Engineer
BEng (Hons) CPEng CWEM RPEQ 21643
Gold Coast | Sunshine Coast | Melbourne | Emerald
PTP/02903 8 April 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.