Original source · versioned page text
DAForm1.pdf
Number of parts created
12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot
Lot on plan description Area (m2) Lot on plan description Area (m2)
12.2) What is the reason for the boundary realignment?
13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)
Existing or Width (m) Length (m) Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?
Road work Stormwater Water infrastructure
Drainage work Earthworks Sewage infrastructure
Landscaping Signage Clearing vegetation
Other – please specify:
14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
Yes – specify number of new lots:
No
14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
PART 4 – ASSESSMENT MANAGER DETAILS
15) Identify the assessment manager(s) who will be assessing this development application
Noosa Council
16) Has the local government agreed to apply a superseded planning scheme for this development application?
Yes – a copy of the decision notice is attached to this development application
The local government is taken to have agreed to the superseded planning scheme request – relevant documents
attached
No
Page 5
DA Form 1 – Development application details
Version 1.3— 28 September 2020
[OCR of page images]
Number of parts created
12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot
Lot on plan description Area (m?) Lot on plan description Area (m?)
12.2) What is the reason for the boundary realignment?
13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)
Existing or Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?
LJ Road work L Stormwater LJ Water infrastructure
LJ Drainage work CJ Earthworks CL Sewage infrastructure
CJ Landscaping UD Signage LJ Clearing vegetation
LJ Other — please specify:
14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
LJ Yes — specify number of new lots:
[No
14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
PART 4 —- ASSESSMENT MANAGER DETAILS
15) Identify the assessment manager(s) who will be assessing this development application
Noosa Council
16) Has the local government agreed to apply a superseded planning scheme for this development application?
LD Yes — a copy of the decision notice is attached to this development application
LJ The local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached
XX] No
Page 5
DA Form 1 — Development application details
Version 1.3— 28 September 2020
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (DAForm1.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.