Original source · versioned page text
RFI - Architecturals
AWN01 CLD01 RS01 AWN01 CLD01 CLD02
6 5 4 3 2 1
16,090 3,900 2,100 2,280 3,070
+17.603
Highest point of roof
2 Roof +16.400 GU01
+16.400 +15.800 AWN01
Window / Door Head
O X X O
X
FG FG
1 Upper Level +13.400 O
+13.400 +13.100
Bottom of Slab +12.500 BAL01
Bottom of SCN01
DP01
P2
DP01 P1 DP01 P1 P1 P1 O X X O
+10.100
0 Ground Level
+10.100 BOUNDARY
SCN01 SCN03 BD RBW01 Adjacent landscaped mound
South West Elevation
1:100
CLD01 AWN01 RS01 SCN02 CLD01
G F E D C B A
790 2,080 1,700 5,600 7,110 2,090
RS01
+17.603
Highest point of roof
AWN01
GU01
+16.400 GU01
2 Roof
+16.400 +15.800 AWN01 AWN01
Window / Door Head
FG FG FG FG FG
CLD01
SCN02
+13.400
1 Upper Level
+13.100
+13.400
Bottom of Slab +12.500
Bottom of SCN01 FG
WS
0 Ground Level +10.100 BOUNDARY
+10.100
SCN01 RBW01 DP01 BD P1 RBW01 SCN03
North West Elevation
1:100
B L A C K Mixed Use Building
ELEVATIONS
W O O D
DA3.01
Scale Project No. Date Revision For Capital Prudential
@ A3 202315 21/04/2023 D 7 Woodland Drive, Peregian Beach QLD 4563
a r c h i t e c t u r e & d e s i g n
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.