GENERAL NOTES PLANTING BEDS CONCRETE AND PAVING PLANT ESTABLISHMENT / CONTINUING MAINTENANCE
A. ARCHITECTURAL WORKS INFORMATION SUBGRADE PREPARATION: GENERALLY: Install exposed aggregate and coloured concrete footpaths, driveways and roadways in the Allow a 12 WEEK Plant Establishment Period from Practical Completion to the satisfaction of the Landscape
Refer to Architect's drawings for all information contained within these documents related to and nominated as Cultivate subgrade surface by thoroughly ripping to a minimum depth of 150mm before spreading topsoil. locations and to the extents as shown on the drawings. Refer drawings for the locations and extents of the Architect.
Architectural Works. This includes all hardscape items such as paving, outdoor structures / shelters, walls and below types. • Maintain adequate watering regime
fencing. Architectural Works information contained within these documents are indicative only and not for TOPSOIL: • Remove weed growth from all mass planting beds and turfed areas
construction or certification purposes. Spread topsoil to a minimum depth of 300mm unless otherwise directed. Proposed topsoil must comply with Type 1 Driveway: Boral exposed aggregate to match ‘Black night’ mix or equal approved based on supplied • Fertilise (as per the notes above)
Australian Standards AS4419-2003 and described as 'Soil blend'. sample. Level of exposure to be determined following sample. • Weed control (as per the notes above)
B. CIVIL WORKS INFORMATION Provide certification of soil types delivered to site, as per AS4419-2003. • Prune planting, control pest and disease management (as per the notes above) to maintain healthy growth ANDREW GOLD LANDSCAPE ARCHITECTURE
Refer to Civil Engineer's drawings for all information contained within these documents related to and FERTILIZER: Type 2 Entry: Portland grey standard concrete trowel finish. Approval based on supplied sample. Not float • Replenish mulch material where necessary
A slow or controlled release fertiliser organic or inorganic to be incorporated generally into the imported (or edges. Trowel finish to be even across whole pour section. • Replace dead / dying plant material PO BOX 5220
nominated as Civil Works. Civil Works information contained within these documents are indicative only and not MT GRAVATT EAST
for construction or certification purposes. excavated / site topsoil). We recommend the following: • Reinstate stakes, ties and marker stakes where necessary QLD 4122
Inorganic Slow or Controlled Release fertilisers: Type 3 Footpath: CCS Full depth coloured concrete sand colour or equal approved based on supplied sample. • Reinstate erosion control matting and other erosion control measures as necessary
C. STRUCTURAL WORKS INFORMATION • Osmocote T 07 3420 0006
M 0405 389 243
Refer to Structural Engineer's drawings for all information contained within these documents related to and • Nutricote Type 4 Footpath: Portland grey standard concrete trowel finish. Approval based on supplied sample. Not float Continue maintenance works beyond Plant Establishment Period as required. E [email protected]
nominated as Structural Works. This includes retaining walls. Structural Works information contained within • Macrocote edges. Trowel finish to be even across whole pour section.
these documents are indicative only and not for construction or certification purposes. • E-Scape PRO by eCo-Enviroment MANAGEMENT PLAN/S:
Type 5 Roadway: CCS Full depth coloured concrete ‘Black 44’ or equal approved based on supplied sample.
D. ELECTRICAL WORKS INFORMATION Organic slow release: Depth and construction detail of roadway to engineer’s detail. The turfed areas shall be throughly watered on the day of turf installation and then as follows at the equivalent
Refer to Electrical Engineer's drawings for all information contained within these documents related to and • Dynamic Lifter of 5l/m², including natural rainfall, or as required to maintain active healthy growth.
nominated as Electrical Works. Electrical Works information contained within these documents are indicative • Organic Link by Plant of Health Type 6: Open jointed pavers located within the lots to be 400 x 400 x 40mm paver to match Boral Exposed
aggregate ‘Coral Coast’ or equal approved based on supplied sample . Weeks 1-3: Twice a week
and not for construction or certification purposes.
WETTING AGENT: Supplier: Exposed aggregate mixes to be Boral Ph 1300 305 980 and coloured concrete pigment to be CCS Weeks 3-12: Once a week or as necessary
E. HYDRAULIC WORKS INFORMATION A wetting agent and / or soil ameliorant including a wetting agent is required to all mass planting beds: (Concrete colour systems) Ph 1800 077 744
• Scotts Hydraflow Wetta Soil If no irrigation, apply the above rates to the mass planting beds. Watering to use rainwater tanks if possible.
Refer to Hydraulic Engineer's drawings for all information contained within these documents related to and
nominated as Hydraulic Works. Hydraulic Works information contained within these documents are indicative • Searle’s Penetraide Plant of Health Soils Soaker Joints: Construct joints in the patterning as shown on the drawings. Approximate locations of joints shown.
• Multipro by eCo-Enviroment Adjust accordingly to suit engineer’s requirement of frequency and types. SPECIAL NOTE
only and not for construction or certification purposes.
PLANTING: DECORATIVE BOULDERS Accord particular diligence to the following prime items:
LANDSCAPE SPECIFICATION NOTES
As indicated on plan.
ORGANIC MULCHING - BULK PLANTING AREAS GENERALLY: Place and secure decorative boulders in the locations as indicated on the drawings. Boulders to TOPSOIL QUALITY and SUBGRADE PREPARATION as specified.
LEVELS-GENERAL NOTES
be placed in a naturalistic and artistic arrangement.
Finish organic mulch surfaces 25 - 40mm below adjacent paving surfaces and / or edging. Finish lawn surfaces
GENERALLY: Proposed mulch must comply with Australian Standards AS4454-2003. PLANT QUANTITY: Use only consistently well nurtured nursery stock from an approved supplier. Check with
flush with adjacent paving surfaces and / or edging. Ensure adequate falls in finished surface levels away from
MATERIALS: Boulders to range in size and vary between 400 x 400, 600 x 600 and 900 x 900 depending on Landscape Architect where species substitutions must be made.
buildings to drainage collection points (eg, field inlets, etc).
MATERIAL: Spread 1" Hoop Bark to a minimum depth of 100mm entirely over planting bed areas as indicated the locations and availability. Source boulders to match with sandstone and gravel materials.
on the drawings. MAINTENANCE: Ensure a continuing maintenance program, including weed/disease, fertilising, watering (but
SUBSOIL DRAINAGE - GENERAL NOTES
GRAVEL beware of over-watering) and replacement of ailing plant material.
Ensure adequate subsoil drainage elsewhere by installing suitable agricultural drainage systems where
SUPPLIER: Centenary Landscape Supplies Ph (07) 3373 4999 or equal approved.
necessary, and especially in areas subjected to site excavation works including retaining walls.
GENERALLY: Install feature gravel to a minimum of 75mm in the locations as indicated on the drawings. GUARANTEE
INORGANIC MULCHING - AS INDICATED SUPPLIER: Centenary Landscape Supplies Ph (07) 3373 4999 or equal approved. Failure to adequately address these items, best practice and relevant Australian Standards WILL result in a
PLANTS sub-standard landscape outcome.
GENERALLY: Install inorganic mulch to a minimum of 75mm entirely over planting areas as indicated on the GRAVEL TYPE 1 PLANTING AREAS:
• NATSPEC shall apply to trees where Council requires this certification. drawings. Weed mat to be installed in all areas of inorganic mulch. MATERIAL: Gravel to be Tenterfield Pearl 20-40mm subject to sample.
• Plants are to be good quality nursery stock from a NIASA Accredited nursery
• They shall be fundamentally free of pest and diseases. MATERIAL: Inorganic mulch to be Tenterfield Pearl 20-40mm subject to sample. GRAVEL TYPE 2 PLANTING AREAS:
• After installation they shall be thoroughly watered. MATERIAL: Gravel to be River washed gravel 'Coastal Mix'.
SUPPLIER: Centenary Landscape Supplies Ph (07) 3373 4999 or equal approved.
TURF LIGHT BOLLARDS
PODIUM PLANTERS
SUBGRADE PREPARATION: GENERALLY: Bollard lights to be installed under the electrical contract. If they are installed prior to landscape
Turfed areas shall be prepared initially by removing all deleterious material TOPSOIL: works, ensure they are protected and maintained during works or rectified with like for like if damaged during
Cultivate subgrade surface by thoroughly ripping to a minimum depth of 150mm before spreading topsoil unless Supply and install imported topsoil suitable for podium planters (UltraGrow Platinum Podium and Container works.
otherwise directed (ie: no cultivation under trees to be retained) Mix.) Proposed topsoil must comply with Australian Standards AS4419-2003 and Australian Standards
AS3743-2003 ‘Potting Mixes’ Refer engineer’s drawings for specification and locations as required.
SOIL: Provide certification of soil types delivered to site, as per AS3743-2003.
Spread turf underlay topsoil to a minimum depth of 100mm unless otherwise directed. Proposed topsoil must FENCING
comply with Australian Standards AS4419-2003 and described as 'Soil blend'. TOPSOIL AERATION AND DECOMPOSITION:
Contractor must allow to maintain finished levels allowing for potential slumping and subsidence. Tamping GENERALLY: Install fencing, screens, gates and associated locks and fixings in the locations as shown on the
TURF: down and light wetting up of soil during placement on podium to ensure air pockets and voids are managed out. drawings. The construction, finishing, fixings, wind loading, footings and final design will be undertaken by an
To be fundamentally free from weeds and disease or other deleterious substances. engineer/ builder. The images and landscape drawings show the extent and design intent and the final finish
• Turf to be Sir Grange (Zeon Zoysia) for all areas within the project designated as 'turf' FERTILIZER: should be coherent with similar elements on site or as discussed with the landscape architect.
Ensure soil nutrient and PH levels are suitable for specific plant species (ie. native or exotic species)
Supplier: Refer Lawn Solutions website for local growers https://lawnsolutionsaustralia.com.au/turf-suppliers/ or Apply appropriate slow release fertilizer (ie. native / exotic species) to each plant as per manufacturer's FENCE TYPE A1: 1500mm or 1800mm high fence (in outdoor shower locations) with 50 x 38mm timber
call 1300 883 711. recommended rates. battens spaced at 50mm or 100mm spacings as indicated on the drawings. Confirm with Architect on site.
A slow or controlled release fertiliser organic or inorganic to be incorporated generally into the imported (or
INSTALLATION: excavated / site topsoil). We recommend the following: FENCE TYPE A2: 1500mm fence with 50 x 38mm battens at 50mm spacings fixed atop retaining wall. Confirm
Turf shall be close turfed with staggered cross-joints and laid in straight lines, running perpendicular to the with Architect on site.
direction of slope (and / or parallel to contours). ORGANIC MULCH - 1 INCH HOOP BARK INORGANIC MULCH - 'TENTERFIELD PEARL' DECORATIVE BOULDERS
Inorganic Slow or Controlled Release fertilisers:
Proposed topdressing soil to comply with Australian Standards AS4419-2003 and as described as • Osmocote FENCE TYPE B Pool Fence: By others, refer Architects Drawings
'Topdressing'. • Nutricote
All joints shall be filled with an approved topdress light soil or sand and the turf shall be lightly rolled. • Macrocote FENCE TYPE C Proposed Fire Protection Fence: By others, refer Architects Drawings
Finished levels shall be 3mm below surrounding surface levels to allow for future top dressing. Allowance • E-Scape PRO by eCo-Enviroment
should be made for shrinkage and settling. FENCE TYPE D1 Boundary Fence Acoustic: By others, refer Architects Drawings
Turf shall be adequately watered once installed, refer Management Plan/s. Organic slow release:
Ensure protection from trampling. • Dynamic Lifter FENCE TYPE E Bin Enclosure: 1500 - 1800mm high fence/ gate with 50 x 50mm battens at 50mm spacings. H
• Organic Link by Plant of Health
FERTILISER: ENTRY FEATURE
Fertiliser to be applied to the turf at the rates and period of time from installation as recommended by the PLANTING:
supplier. If no starter Fertiliser supplied by the supplier, we recommend: To locations as shown on the plan and to the sizes and numbers as shown on the schedule. GENERALLY: Construct a major and two minor signage/ features in the locations as shown on the drawings.
Dynamic Lifter Turf Starter: See indicative images to show materials, design intent and general proportions.
http://www.yates.com.au/products/fertilising/organic-based/dynamic-lifter-turf-starter/ ORGANIC MULCHING:
#tbCQXOZuFJZ01z1B.97 Where specified, proposed mulch must comply with Australian Standards AS4454-2003. 'Composts, soil All required fixings, footings, and construction methodology to engineer's / builder's confirmation and
Lawn Builder™ Seed & Turf Starter Slow Release Lawn Fertiliser: conditioners and mulches'. Spread 1" Hoop Bark to a minimum depth of 75mm entirely over planting bed areas. Landscape Architect's approval. Final locations, extent and positioning to Landscape Architect's approval and
https://www.scottsaustralia.com.au/scotts-brands/lawn-builder/lawn-builder-slow-release- may require the construction of a plinth to ensure visibility and appropriate finished levels.
lawn-fertilisers/lawn-builder-seed-turf-starter-slow-release-lawn-fertiliser/ DRAINAGE CELLS:
Use drainage cells to podium planters MATERIALS: Stone cladding from Eco Outdoor 'Cracken Back' Ph1300 131413. Project logo, lettering font and
SOIL WETTING AGENT: sizing to be confirmed by project marketing / branding consultant.
We recommend the application of a soil wetting agent wetting agent (ie: non biodegradable detergent not Horizontal Application:
crystals) to stop hydrophobia if not already in the starter fertiliser supplied with the turf, at the rates Install VersiCell 30mm (https://elmich.com.au/products/versicell-subsoil-drainage/) or similar drainage cell,
recommended by the manufacturer: installed to manufacturer’s recommendations. STRUCTURE AND BENCH SEATING
• Scotts Hydraflow Wetta Soil Ensure all corners and sharp edges are removed and tapped to avoid damaging the waterproof membrane. SANDSTONE REGULAR STEPPERS SANDSTONE RANDOM STEPPERS
• Searle’s Penetraide Apply final layer of geofabric/ filter fabric (refer below) over entire drain cell area. Lap material minimum 400mm GENERALLY: Design and construct shelter structure with incporated seat in the location as shown on the
• Plant of Health Soils Soaker at junctions or joins. Turn fabric up walls and service risers minimum 300mm. Ensure neat holes cut in around drawings. The images and landscape drawings show the extent and design intent and the final finish should be
services with minimum 15mm clearance. coherent with similar elements on site or as discussed with the landscape architect.
WEEDS, PESTS DISEASE MANAGEMENT
Weeds are required to be removed by physical or chemical (Glyphosate or other herbicides) means. If chemical Vertical Application (to planter walls): The construction methodology, timber sizes, finishing, fixings, wind loading, footings and final design will be
means, as per the manufacturer recommendations. Refer to the following reference for guideline on weeds, Install to manufacturer's specifications to all podium planter garden bed walls over 400mm in height. Lapping undertaken by an engineer/ builder to the landscape architects approval.
pest and disease management joins and junctions by minimum 100mm.
REFERENCE:
http://thelawnguide.com.au GEOFABRIC: TIMBER GARDEN EDGE O 12/10/23 AS-CONSTRUCTED
Install Filterwrap (https://www.geofabrics.co/products/filterwrap™) as per Geosystems Australia details and N 20/06/23 AS-CONSTRUCTED
SYNTHETIC TURF specifications. GENERALLY: Install to the locations as indicated on the drawings. M 19/06/23 REVISIONS AS REQUIRED
L 02/06/23 REVISIONS AS REQUIRED
Supply and install in the locations as shown on the drawing and to manufacturer’s recommendations. VOID FILLER: MATERIAL: Sawn hardwood of Durability Class 1 as defined in Appendix D of AS 1604 or CCA treated K 12/05/23 LOT 9 LILY POOL DETAILS
Install polystyrene blocks cut to size to podium planters as shown on details. Contact Polystyrene Products (or softwood.
Turf to be 'Urban Oasis 30' or equal approved. similar) for space fillers. Ensure geofabric is installed over, to separate soil media from the polystyrene product. SIZE: 3000 x 100 x 15mm nominal edgings, 50mm square pegs, 350mm long. ISSUE DATE REASON
(https://www.polystyreneproducts.com.au) INSTALLATION: Set edgings flush with adjoining surfaces to define planting, grass areas, pathway edges, etc.
Supplier: Urban Turf Solutions or equal approved Fix to pegs with galvanized nails, two per fixing. Drive pegs into the ground at 1200-1750mm centres on the turf THIS DRAWING HAS BEEN PREPARED WITH ALL CARE FROM BASE INFORMATION AVAILABLE
IRRIGATION: side of the edging and on both sides of joints between boards with peg tops 15mm below top of edging. AT THE TIME OF PREPARATION. ALL EXISTING AND RETAINED ELEMENTS ARE SHOWN
Contact : Agata Wilson [email protected] Ensure irrigation is provided as per specification. CURVING: Where the timber edge is to be curved, space the pegs to hold it to a uniform curve. INDICATIVELY ONLY. THE LOCATION OF THESE ELEMENTS ARE BASED FROM SURVEY
INFORMATION. ALL PLANS AND DETAILS ARE TO BE READ IN CONJUNCTION WITH ALL
RELEVANT CONSULTANT'S DOCUMENTATION PACKAGES, INCLUDING (BUT NOT LIMITED TO)
Infill material is washed and dried silica sand as per manufacturer’s specification. SANDSTONE STEPPERS BIO-RETENTION BASIN ARCHITECTURAL, CIVIL, STRUCTURAL, HYDRAULIC, ELECTRICAL, LIGHTING AND SIGNAGE
DOCUMENTATION. ALL ABOVE AND BELOW GROUND SERVICE LOCATIONS ARE SHOWN
Install to manufacturer’s specifications and recommendations. INDICATIVELY. REFER TO THE RELEVANT ENGINEERS DRAWINGS AS REQUIRED. ALL
GENERALLY: Use natural stone, which is uniform quality in each grade, sound and free from defects liable to Refer to Engineering drawings for bio-retention details. Prior to planting, ensure installation of erosion control
CONCRETE PAVING TYPE 1 DRIVEWAY CONCRETE PAVING TYPE 3 FOOTPATH DIMENSIONS ARE TO BE VERIFIED ON SITE.
affect its strength. matting (ie: Jutmaster Fine by Geofabric Australasia), secured as per manufacturer's recommendations.
Ensure grass finishes flush with surrounding surface levels.
SIZE: Random steppers to average approx. 400mm but varying in size/ shape for visual interest with gap of IRRIGATION
Synthetic grass is to be securely fixed on all sides. If a concrete edge is required to allow for secure fixing of approx. 150 – 200mm between to allow for planting.
synthetic grass then the contractor should allow for that inclusion. Planting plan has been designed to survive without an automatic irrigation system. Water additives and water
SIZE: Regular steppers to be 300 x 1500mm min 20mm thickness or equal approved retention elements, along with hardy water-wise plants will ensure an irrigation system is not imperative to the
Grass installation that allows for lifting is unacceptable and the use of pins or nails that are removable by hand long-term maturation and survival of the proposed plants. If approved, install an automatic, fixed position, low
are also unacceptable. SUPPLIER: Sandstone World Ph 0431 285 425 or equal approved. pressure sprinkler irrigation system to all landscaped areas shown on the drawings internal to the site only, to
Noosa Shire Council approval. The irrigation shall meet the following performance requirements and as per the
Subsurface preparation should ensure that turf grades smoothly towards drainage sumps/ trench drains or in LAYING: Subgrade to be fully compacted before mortar bed is laid. Subgrade shall be compacted 95% of manufacturers and/or installers specifications:
the directions shown on the drawings. Falls shall be a minimum 1:75. medium dry density. Mortar to comply with AS 3700 and match sandstone colour as new. Stone should vary in • Summer target application of 32mm
ESSENCE OF PEREGIAN BEACH
size and shape for interest and naturalistic look. • Fully automatic and metered
• Recycled water use (from rainwater tanks)
215 DAVID LOW WAY, PEREGIAN BEACH
• Commercial quality fittings and fixtures
• Mainlines
• Dripline system under mulch
• RPZ backflow prevent device
LANDSCAPE WORK NOTES
All design and documentation, materials supplied and work carried out should be in accordance with the current
relevant Australian Standards and best practice.
JOB No. SHEET No. ISSUE DRAWN BY CHECKED BY
CONCRETE PAVING TYPE 2 ENTRY CONCRETE PAVING TYPE 5 ROADWAY CONCRETE PAVING TYPE 6
19.021 1 O CP/AA/PD AG/NC
AND TYPE 4 FOOTPATH
AS-CONSTRUCTED
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.