Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
          -
   NOOSA COUNCIL
  APPROVED PLANS
MCU13/0052 29 JAN 2014


[OCR of page images]
 

Ghent

x.
— 3
~~ Sea ee : | NBNCo

Parmesan ay ae EXISTING ENERGEX Limited
POLE 192199

 

 
    
   
 
    
  
  
     
   
   
    
 

 

  

 

 

 

 

 

 

 

 

  
  

   
  
   
   

 

  
 
 
 

 

 

 

 

 

 

 

 

EXISTING ACCESS
GATES Ss
PROPOSED SITE ACCESS
/ (APPROX. 180m) ERICSSON
COPYRIGHT © OPENSTREE TMAP CONTRIBUTORS, CC BY-SA \
ae cm tmmmemevonss LoT2 \
tone, Us tenses euieh oun be ooseened ot baesrentessemeses 98 RP 126723 = \ —
|
/ NATIONAL BROADBAND
NETWORK
* SITE No: 4POM-51-36-BPN
SITE CO-ORDINATES BOREEN POINT NORTH
153 LAKE FLAT ROAD,
MONOPOLE LOCATION SOREEN POINT,
DATUM: MGA (GDA94) | ZONE: 56 QLD 4565
LATITUDE ~26.26670° pi LOT 21 —\\ PRELIMINARY
LONGITUDE 152.98079° Bpailoai SP 149578 SS fe ol os ee
is
EASTING 498 081 IS, L
NORTHING 7094 780 eee eee =
: a A

 

 

 

[Rev Date Revision Details

 

; OVERALL SITE PLAN
NOOSA COUNCIL SCALE 1:10000

@
APPROVED PLANS aurecon

MCU13/0052 29 JAN 2014 ane eae

 

 

 

 

 

 

 

DESIGNER JR
CHECKED. MR
ADDITIONAL NOTES NOTE: APPROVED JI
LEGEND NO RETAINING WALLS ARE PROPOSED. a
AE —AE — EXISTING AERIAL ELECTRICAL LINES NO LANDSCAPING IS PROPOSED 1. THE NBN SUB-MAIN ROUTE SHOWN ON THE DRAWINGS IS INDICATIVE ONLY. | OVWERALL
~iejisltc’y  speteae GRSbERTY SKE (REFER TO PLANNING REPORT). ELECTRICAL CONTRACTOR TO DETERMINE EXACT ROUTE. ELECTRICAL
/ NO STORMWATER DETENTION IS REQUIRED. CONTRACTOR TO LOCATE AND IDENTIFY EXISTING U/G Services PRIOR TO | SITE PLAN
NO VEGETATION CLEARING IS REQUIRED. COMMENCEMENT OF WORK.

PAINTING/WARNING LIGHTS TO COMPLY WITH
STATUTORY AUTHORITY REQUIREMENTS.

 

Revison

Gaara
4POM-51-36-BPN-C2, 02

COPYRIGHT © NBN Co LIMITED ABN 86 136.633 741, ALL RIGHTS RESERVED, VERSION 10- SEPT 2011 2 0 0 i ne ee en)

 

 

 

 

 
Log in to download the original file

APPROVED PLANS - MCU13_0052.pdf · 884 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.