                             STORMWATER TREATMENT AND
                              WATER QUALITY MANAGEMENT
                                                      PLAN
                                                     VERSION 1


                                                         FOR


                                                  Kevin and Val Kelly


                                                      MAY 2013


                                  RECONFIGURATION OF LOT 136 ON MCH978


                                              STAGE 1       -
                                                                4 LOTS


                                    55 LAKE MACDONALD DRIVE, COOROY




                                                                             ~~~
                                                                         ~~
                                                                         ~




                                              J’
Callaghan & Toth                             ~~
  Civil, Environmental &
                                         ~
  Hydraulic Engineers
                                        j’
  A.B.N.5905570314
  8/41 Sunshine Beach Rd
  Noosa Junction Q 4567

  Telephone (07)54749081
  Facsimile (07)54749041
  Job No:    1225
  Document No.: 1225_SWQMP_1
  WYffl.callaghanandtoth.com.au
Full text of the other 72 pages

Page 2

                                                                                                                         ~
                                                                                                                Callaghan & Toth

                                                    DOCUMENT HISTORY


Document Reference:                                    No: 1225 SMP.doc [Rev 1]


Project Manager:                                       Alex McWilliam


Author:                                                Lex Toth NPER3 (ENV)(CIVIL)RPEQ 6069 CPESC

Reviewer:                                              Jane Davissen BE (ENV)


Client:                                                Kevin and Val Kelly


Contact Person:                                        Alex McWilliam (07 54 555425)




DISTRIBUTION LIST

                                                            POSITION ON
       NAME                    ORGANIZATION             MANAGEMENT TEAM              REVISION       REVISION             REVISION
                                                                                             0           1                  2


 Kevin and Val Kelly                                            Client                                   1



   Jane Davissen               Callaghan & Toth                 Author                       1           1




   Alex McWilliam          McWilliam Property              Project Manager                   1           1




   Max Watterson               Max Watterson &                 Planner                       1           1
                                  Associates



                               Sunshine Coast            Assessment Officer                              1
                               Regional Council




REVISION LIST


         REVISION                        DATE DISTRIBUTED                       ISSUED BY                     CHECKED BY




             1                              May 2013                            Lex Toth                     Jane Davissen




             The information contained in this report is confidential and proprietary to Callaghan and Toth. It may

             only be used by the person to whom it is provided, for the stated purpose for which it is provided, and
                 must not be imparted to any third person without the prior written approval of Callaghan and Toth.

                 Callaghan and Toth reserve all legal rights and remedies in relation to infringement of its rights in
                                                  respect of its confidential information.
                                                    OCallaghan & Toth
                                                            2013




                                                                                                                                       2
55 Lake MacDonalld Drive   -

                               Stage 1                  SMP Revl.doc                                             May 2013       1225

Page 3

                                                                                                                                             ~
                                                                                                                                      Callaghan & Toth




CONTENTS

1.     SUMMARY............................................................................................................................................5
2.     INTRODUCTION                                                                                                                                ................5
                                  ..................................................................................................................




3.     DESCRIPTION.....................................................................................................................................6
     3.1     Proposed Works............................................................................................................................6
4.     WATER QUALITY MANAGEMENT PLAN..........................................................................................10
     4.1     Proposed On-Site Stormwater Treatment Process ......................................................................1 0
     4.2     MUSIC Model..............................................................................................................................1 0
       4.2.1        Source Nodes ......................................................................................................................1 0
       4.2.2        Treatment Nodes .................................................................................................................10
       4.2.3         Rainfall Data ........................................................................................................................11
     4.3     MUSIC Modelling Results ............................................................................................................11
       4.3.1        Water Quality Objectives .....................................................................................................11
       4.3.2        Assessment of Results ........................................................................................................12
5      FLOODING ASSESMENT REPORT ..................................................................................................15
     5.1     Existing Conditions.................................................................................................................... ..15
     5.2     Proposed Drainage System....................................................................................................... ..15
6      CONCLUSIONS & RECOMMENDATIONS ........................................................................................15
APPENDIX 1                   -

                                  Preliminary Storm water Quality Management Plan                               ..................................................
                                                                                                                                                                     A
APPENDIX 2                   -
                                  MUSIC Results          .........................................................................................................
                                                                                                                                                                     B
APPENDIX 3                   -
                                  Site Photos      ...............................................................................................................
                                                                                                                                                                     C
APPEN DIX 4                  -
                                 Q10 Pre and Post Development............................................................................... D




                                                                                                                                                                     3
55 Lake MacDonalld Drive    -

                                 Stage 1                       SMP Revl.doc                                                            May 2013         1225

Page 4

         ~



                                                                                                                                   ~
                                                                                                                             Callaghan & Toth

    LIST OF REFERENCES


    1.        EN HEALTH (2004)Guidance on the Use of Rain Water Tanks.

    2.        Engineers Australia (2006)Australian Runoff Quality. Australian Runoff Quality
             Guidelines.

    3.        Healthy Waterways (2006)Water Sensitive Urban Design Technical Design Guidelines
             for South East Queensland

    4.       Queensland Development Code Part 4.3 (Oct 2008)Alternative Water Sources.
    5.       Water by Design, MUSIC Modelling Guidelines for South East Queensland                                                  -
                                                                                                                                        Version 1
             (December2010)
    6.       Wong, T., Breen, P. & Lloyd, S. (2000)Water Sensitive Road Design                                            -

                                                                                                                              Design Options
             for Improving Stormwater Quality of Road Runoff. CRC for Catchment Hydrology
             Technical Report No 00/1.

    7.       Deemed to Comply Solutions               -
                                                          Stormwater Quality Management (South East
             Queensland)


    LIST OF FIGURES


    Figure 1.1                        Site Location Pian...   ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
                                                                                                                                                  7

    Plan No. 01                       Stormwater Quality Catchment Layout....                     ... ... ... ... ... ... ... ... ... ... ...
                                                                                                                                                  8

    Plan No. 02                       Stormwater Quality Treatment Devices...                     ... ... ... ... ... ... ... ... ... ... ...
                                                                                                                                                  9

    Figure 4.1                        MUSIC Model for the Proposed Development............                                ...............
                                                                                                                                                  13

    Figure 4.2                        Bioretention Basin Detail........        ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
                                                                                                                                                  14




    LIST OF TABLES


    Table 4.1                         MUSIC Catchment Areas...            ... ... ... ...... ... ... ... ... ... ... ... ... ... ... ... ...
                                                                                                                                                .10

    Table 4.2                         Comparison of Load Reductions...                ... ... ...   ... ... ... ... ... ... ... ... ... ... ...
                                                                                                                                                  .11
I                                                                                                                                                 .15
    Table 5.1                         Pre-Development and Post Development Discharges...                                    ... ... ... ... ...




                                                                                                                                                         4
    55 Lake MacDonalld Drive   -

                                   Stage 1            SMP Revl.doc                                                            May 2013            1225

Page 5

.
                                                                                           ~
                                                                                       Callaghan & Toth

    1.        SUMMARY

    The key points of this investigation are as follows:


         1.   Runoff from road widening, footpaths and driveway crossovers is to be cleaned of
              nutrients and gross pollutants via a Bioretention Basin and then released to existing to
              the gully.
         2.   The increase in pollutant loads due to the increase in impervious areas is to be
              attenuated.
         3.   Water saving devices for new fixtures are required.
         4.   Stormwater Detention is to be incorporated into the Bioretention Basin to achieve no
              increase in runoff concentration.




    2.        INTRODUCTION

    This report was written as part of an Reconfiguration of a Lot application Information Request
    for Sunshine Coast Regional Council:


              Submit a preliminary Storm water Management Plan (SMP)showing how stormwater
              from the development will be treated to meet current best practice load based reduction
              targets and how peak discharge will be limited to pre-development rates for all events
              from the 1 to 100 year ARI storm events. The preliminary SMP should be designed in
              accordance with the preliminary master as a result of Item 1.


    As such this Stormwater Management Plan (SMP)has been prepared in accordance with the:


         1.   Water Sensitive Design Code in the Noosa Plan; and
         2.   Water Sensitive Urban Design Technical Design Guidelines for South East Queensland,
              published by Health Waterways.

    The site subject to this report is Lot 136 on MCH978 located at 55 Lake MacDonald Drive,
    Cooroy (refer Site Location Plan Figure 1.1).

    This SMP considers the new hardstand areas, including road widening, footpath, driveway
    crossovers, and new roof areas for the proposed 4 lots. This report also aims to demonstrate
    that the proposal complies with relevant codes and guidelines and that the storm water runoff
    will not change the surrounding hydrology.


    A Bioretention basin is required for the site. This device will enable the water quality objectives
    to be achieved. Water minimisation is in accordance with the guidelines.


    The Model for Urban Stormwater Improvement Conceptualization (MUSIC)has been used to
    assess the     suitability of various treatment devices and to model existing and predicted pollution
    export loads and concentrations.




                                                                                                          5
    55 Lake MacDonalld Drive   Stage 1
                               -
                                              SMP Rev I.doc                             May 2013   1225

Page 6

~




                                                                                          ~
                                                                                      Callaghan & Toth

    3.        DESCRIPTION

    The site is an existing rural lot with one house and partly cleared land for rural pursuits. The
    site is bounded by Lake MacDonald Drive to the south-east, residential development to the
    south-west and vacant rural land to the north.


    This site is subject to the ponding of floodwaters. The Q1 00 year ARI flood levels indicate that
    the extent of flooding does not impact on Stage 1 of the proposed Lot Reconfiguration.




    3.1      Proposed Works

    It is proposed to reconfigure one lot into four lots as part of a larger reconfiguration. This stage
    one   reconfiguration will include:

             Widening Lake MacDonald Drive in front of the four lots.
             Reconstruct the pedestrian footpath fronting the four lots.
             Construct driveway crossovers to the four lots.
             Provide services


    As a result of these works stormwater drainage and treatment devices are required to drain the
    site, attenuate flows and treat stormwater runoff to acceptable levels.

    Plan 01 shows the catchments identified onsite. Plan 02 shows the treatment device locations.




                                                                                                           6
    55 Lake MacDonalld Drive   Stage 1
                               -
                                            SMP Revl.doc                               May 2013   1225

Page 7

                                                                                                          ,                                                       ’~rr{rt
                                                                                                                                                                       ’ll1i’Ct
                                                           \.                                                                                        I
                                                                            ....( ".
                                                                                                                                               ))’

                                                                                                                                                J
                                                                                                                                                                                     ~

                                                                                                                                             .g/
                                                                     ~
                                                                                                                                         i,
                                                                    ~            ~       KenSlngto                                      J>
                                                                 ~                                  "’0                               ../J
,I’
,/    c......-)                                             c’"
                                                          Q.,"               ~
                                                                            q>
                                                                                         ~
                                                                                           1

            (                                                \.. ~._



                   J---’’r/~,!.
                                .s:"
                                  ~...
                                                               ~
                                                                 Q,,,,’ti
                                                                                 (J/’"
                                                                                    7~(/kaCt



                                                                                                                   ~~
                                                                                                                       /
                                                                                                                     ~,~
                                                                                                                                 .~
                                                                                                                                                              ~Plne..’"
                                                                                                                                                                            "69
                                                                                                                                                                              ’0/’1f.<
                                                                                                                                                                                                ;.",..",-
                                                                                                                                                                                              tr’"
                                                                                                                                                                                                         O\~


                                                                                                              ~~    \.. %
                                                                                                                                                                                     ,,;
                                                                                                            ~
                                                                                                                       " ~Q                                                               ~
                                                                                                                           <l!
                                                                                                                            \.                                                            1>
                                                                                                                             ~                                                                ~

                                                                                                          .,.~<)
                                                                                                                                                                                               ..


                                                                                                                                                           ..r.i
                                                                                         ~~                                      >\                                                            ,
                                                                                         Cemetery

                                                                                                               (                  ~,
                                                                                                                                                     :::
                                                                                                                                                     J!
                                                                                                                                                     c:

                                                                                                                                                     ~
                                                                                                                                                                                                    \
                                                                                                                                             r~-10,...


,r;;
                                                                                                                           /
  .c-~                                                                                                                                                                              Gumtree Dr-....
      I!
  if                                                                                                                                                                                CooroY:NooS<lJRd
                                                                                                                                                           f
                                                                                                                                                          ~
                                                                                                                                                      ;
                                                                                                                                              ",tl’~


      ,
           600m       Johnson                       It

                        t;ark                (,\i
 -+(12011                                ~"t
                                       ...




                                                         project
           Callaghan & Toth                               PROPOSED 4 LOT SUBDIVISION                                                                       SITE LOCATION PLAN
                  Civil, Environmental &
                                                         location
                  Hydraulic Engineers
                                                           55 LAKE MACDONALD DRIVE.
                    8/41 Sunshine Beach Rood
                                P.O. Bo. 2305              COO ROY
                            NOOSA HEADS 4567
                                                                                                                                                                     Figure                    1.1
                   Ph: 54749081 fax: 54749041
                    ....colloghonondlolh.com.ou
                                                         Source: hllp://.hereis.com.au/                                                              Scale: NTS                   Paqe 7


[OCR of page images]
 

yong HS

Yatrah gp

 

 

 

 

er

 

  

1s
3 oe
i eo
tt y
: a hy
Uy.
# te
ft ‘ A
¢ ¥
¢ ¥
it 1 >
t 4 2
# a g
z ¥ §
oN 7
t CB Primary 2
4 X cd
s oe
% ws
a ¢ 5
i 3 é
BE ¥
a x
y os &
| Sapphire-st... o™  e
Ps
»
ad
se
By
RS

 

&, ¢
. ~~
%
@ 3
% } e,
% 3
1 2
é
% g
© =
n e
S
Wit,
Gumtree Or
Ci
0rey-Noosa Rd wl
CP ay,
Ra é
a
cr

 

Callaghan & Toth

Hydraulic Engineers

8/41 Sunshine Beoch Rood
P.O. Box 2305

NOOSA HEADS 4567

Ph: 54749081 Fax: 54749041
www, ghanandtoth.com.au

i

—

Civil, Environmental &

Project
PROPOSED 4 LOT SUBDIVISION

location
55 LAKE MACDONALD DRIVE,
COOROY

SITE LOCATION PLAN

Figure 1.1

 

 

 

 

 

Source: http://whereis.com.cu/

 

Scole: NTS Page 7

Page 8

                                                         ’"                               CONNECTION TO EXISTING PAVEMENT DETAIL
                                                                                                                                           N
                                                          ~                                                                                II
                                                                               LOT 3
                                                                               RP202304




                                                                    LOT 99
                                                                    RP881300
      ~
     ~


J                     if                  ~
                                                ,
                                                     ~~
     SITE LOCATION N.T.S


                                                         LOT 3
                                                         RP113733


lAD WORKS LAYOUT PLAN 1
lAD WORKS LAYOUT PLAN 2
NGlTUDtNAI. SECTION
   s SECTIONS
-
  LOT 17 TO 20
OUT PLAN 1
.AN
T PLAN


ON                                             LOT 135
rROL PLAN                                      MCH978




                                    LOT 6
                                    SP218739




ARD DRAWINGS
ROOT BARRIERS
_S 1050t TO 2100f
1lAE. C.I. CONCRETE FILLED COVER
                                                                                                                              CATCH~ENT   .- - .
ICKFlWNG or STORt.lWATER DRAINAGE PIPES
YPE 2
 GENERAL ARRANGE~ENT
ANTI PONDING                                                                                                        SEDIMENT AND EROSION CONTROL

Page 9

       ’~                                                                                                            G     -
                                                                                                                               GUIA
                                                                                                                     GC- GOLDEN CANE
                                                                                                                     HP   HOOP P[NE
                                                                                                                           -




                                                                                                                     [B    -
                                                                                                                               IRONBARK
                                                                                                                     J    -
                                                                                                                               JACARANDA
                                                                                                                     LEP- LEOPARD
                                                                                                                     t,IA-1AAHQGANY
                                                                                                                     1A0   -
                                                                                                                                t.IANGO
                                                                                                                     lAP   -
                                                                                                                                t.lAPLE
                                                                                                                     N     -
                                                                                                                               NATIVE
                                                                                                                     P     -
                                                                                                                               PALlA
                                                                                                                     PB- PAPERBARK
                                                                                                                     PI    -
                                                                                                                               P[NE
                                                                                                                     PN    -
                                                                                                                                PANDANAS
                                                                                                                     PO    -
                                                                                                                                POINCIANA
                                                                                                                     S     -
                                                                                                                               STR[NGYBARK
                                                                                                                     SC    -
                                                                                                                                SCRUB
                                                                                                                     SH    -
                                                                                                                                SHE OAK
                                                                                                                     S[    -
                                                                                                                               SILKY OAK
                                                                                                                     TT         TEA TREE
                        LOT 21
                                                                                                                           -




                                                                                                                     WL    -
                                                                                                                                WATTLE
                                                                                                                     X     -
                                                                                                                               EXOTIC

                                                                                                                                S

:1

G WITH GRAVEL
3JECT TO CBR TESTING



    TO IPWEAQ STD DWG R-0050 CHARCOAl
CK WITH f72 IAESH (PROVIDE 75mm IAINIIAUIA
)ER CONCRETE If SUBGRADE CBR VALUE=<6)


TOPSOIL, fERTlUSE &: GRASS SEED
    OR MULCHED (80% COVER BY ON
’ERTIUSE &: TURf fOOTPATH 2m WIDE


SOIL, fERTlUSE &: GRASS SEED
flENANCE). TOPSOIL, fERTlUSE &:


 WITH KERB EDGE




                                                                                                      ~
:RETE                                                                                                  ~
                                                                                                        ’Q
                                                                                                         ct>
fOOTPATH TO SEO
fOR WIDTHS
                                                                         ~
                                                                                            REAUN WATERIAAIN AND ABANDON
                                                          -::              ~
                                                                                            OLD UNE UNDER WIDENING
                                                                            ’Q
[HOLE
                                                           ~                 ct>
E INVERT UNE KERB &                                         ~
                                                                ’t..r.
STD DWG R-0080                                  q                 ~
,
     ELECTR[CAL
                                                -v
                                                ’Q
                                                                                                                                            II
                                                    ’t>                  TO HOUSE [S TO BE REIAOVED                                         N
                                                                           IS TO BE REIAOVED


                                        LOT 1                                                                                               II

Page 10

                                                                                               ~
                                                                                           Callaghan & Toth

4.       WATER QUALITY MANAGEMENT PLAN

4.1      Proposed On-Site Stormwater Treatment Process

The developed site was divided into MUSIC model sub-catchments as shown on Plan No. Plan
01. The proposed treatment train for the development site is illustrated on Plan No. 02 and
listed below:


The Bioretention Basin will treat the stormwater runoff from the road widening and verge works,
and allotments. The treated runoff will then be directed to a Bioretention Basin within new
drainage reserve. The bio-retention component will remove the nutrients, heavy metals, and
retard flow.




4.2      MUSIC Model

4.2.1 Source Nodes


Catchment areas of source nodes within the proposed development have been identified as
sub-catchments such as roofs, yard, road and verge. MUSIC allows for characteristics of these
source nodes to be amended to ensure that accurate   pollution generation and hydraulic
characteristics for each sub-catchment are used to generate stormwater runoff within the
model. Table 4.1 below details the sub-catchments used in the MUSIC model, land use,
percent imperviousness and area of each sub-catchment. The MUSIC Modelling Guidelines for
South-East Queensland                    Version 1 December 2010 have been used to set level of
                                         -




imperviousness. The guidelines detail of urban residential pollutant export parameters have
been used for each node.



TABLE 4.1            MUSIC CATCHMENT AREAS (DEVELOPED)


              Catchment                                   land Use          Music Impervious   Area (ha)


  Habitable Roof Area Lot 17                 -
                                                 20     Urban   -
                                                                     Roof        100%             0.08


          Yard   -
                     Lot 17 to 20                       Urban   -
                                                                     Yard         30%             0.167



        Road Widening + Verge                           Urban   -
                                                                     Road         90%             0.125


              TOTAL                                                                            O.372ha



4.2.2    Treatment Nodes


The "MUSIC Modelling Guidelines for South East Queensland" Version 1 prepared by Water by
Design and dated December 2010 has been used to set the rainfall runoff parameters and
pollutant export parameters for the site.

The land use type used for this model was "Urban" and the values in the guideline shown in
Table 3.7 and Table 3.8 of the guidelines have been used in this model.




                                                                                                             10
55 Lake MacDonalld Drive   -

                               Stage I                SMP Revl.doc                         May 2013   1225

Page 11

                                                                                         ~
                                                                                      Callaghan & Toth

     1.   Bioretention Basin has been placed in a proposed Drainage Reserve adjacent to Lake
          MacDonald Drive. One (1)bio-retention basin is proposed with an area of 25m2. It has
                 layer depth of 0.5m and an extended detention depth of 0.3m. The size and
          a filter

          depth of the systems have been designed in accordance with Figure 4.2. The bio-
          retention basin drains to a gully within the site.



4.2.3     Rainfall Data


The meteorological data used for the MUSIC Model was the data for Cooroy from 01/01/92-
31/12/01. The choice of the data was based on the mean annual rainfall for Cooroy being
similar to the mean annual rainfall for Lake MacDonald Drive:


The mean Annual Rainfall for Cooroy                        92   -
                                                                    02 = 1585mm


The MUSIC Modelling Guidelines for South East Queensland               -
                                                                         Version 1 December 2010
details that Cooroy data for 1973 to 1983 should be used. This data has an annual average
Rainfall of 1600mm. It is considered that the 10 year period from 1992 2002 has a relatively
                                                                                  -




close mean annual Rainfall to the recommended 10 year period and as such is acceptable to
use in this case.



4.3       MUSIC Modelling Results


The MUSIC modelling program has been used to investigate the performance of various
treatment options in the treatment train. MUSIC Version 5 is capable of incorporating rainwater
re-use in the model. These features have been used         in making comparisons between different
stormwater management systems for this report.


4.3.1     Water Quality Objectives


This model meets the pollution load reduction target as detailed in Water by Design Deemed to
Comply Solutions Storm water Quality Management (South East Queensland) version 1.0-
                           -




Table A-2. The following have been included in Appendix 2.


          .      The treatment train effectiveness for the system.


          .      The MUSIC Version 5 Summary Report.


The information above indicates that the new lots will achieve reductions in pollutant loads as
detailed in Table 4.2 below.


          TABLE 4.2:              COMPARISON OF LOAD REDUCTIONS


              Parameter                           MUSIC                POLLUTANT
                                              REDUCTION                    LOAD
                                                RESULT                 REDUCTION
                                                                        TARGETS
              Flow                                 1.4%
              Total Suspended Solids              94.7%                    80%
              Total Phosphorous                   73.6%                    60%
              Total Nitrogen                      60.9%                    45%




                                                                                                        11
55 Lake MacDonalld Drive   -

                               Stage 1      SMP Revl.doc                              May 2013   1225

Page 12

 ’
.




                                                                                             ~
                                                                                          Callaghan & Toth

     4.3.2 Assessment of Results
     The developed site has been modelled as a series of Urban sub-catchments, which incorporate
     Water Sensitive Urban Design (WSUD)treatment trains. Plan No 02 shows the proposed
     locations of the bio-retention basin. The reductions listed in Section 4.3.1 above comply with
     Council’s requirements. Therefore, it is considered that the proposed stormwater treatment
     system is currently sufficient to reduce the pollutants prior to exiting the site.




                                                                                                            12
     55 Lake MacDonalld Drive   Stage I
                                -
                                             SMP Rev l.doc                                May 2013   1225

Page 13

        .



    ~           .


.




                               I,G                                                   lCl
                                                                                     "’T



                      La 17 :020
                                            ,

                                            -
                                                Y<lrd                           ROi~wa      [~



                                                   ’"
                                                             ""                 tl
                                                              ""            J
                                                                "




         !.C)
                                                                   .I ~
                                                                    JU,~I tio II
                                                                                                            -.




                                                                                            Sior ~ten on ~ sin
                                                                                                            fo

’117 tf’ ~I- Riof ~tea                                                                                           ~yivinl’ ’Ide I Drat ’Cl :ar!m1ent-




                                                  project

    Callaghan & Toth                               PROPOSED 4 LOT SUBDIVISION                                     MUSIC MODEL FOR THE
            Civil, Environmental &                                                                               PROPOSED DEVELOPMENT
                                                  location
            Hydmulic Engineers                     55 LAKE MACDONALD DRIVE

~~
~
    II
              8/41 Sunshine Beach Rood
                           PO BOX 2305
                      NOOSA HEADS 4567
             Ph: 54749081 Fox: 54749041
              ....colloqhonondtoth.com.au
                                                   COOROY


                                                   Seale: NTS                              DATE: MAY 2013
                                                                                                                               Figure        4.1
                                                                                                                                               13

Page 14

                                                          6.25


                                                       ’   ’
                                                ’
                                                      v
                                             ’         ’
                                                   ’  ’
                                             ’           ’
                                                   ’
                                           ’             ’
                                                ’
                                           ’          ’
                                                ’         ’J
                                         v
                                            ’         ’
                                         ’         ’      ’    0
                                            ’          ’J
                                           ’      ’          ’ ~
                                               ’       ’
                                           ’        ’J       ’
                                        v
                                               ’          ’
                                            ’       ’
                                        ’       ’J        ’
                                            ’          ’
                                           ’    ’            ’
                                             ’J        ’
                                           ’       ’         ’
                                             ’            ’
                                                   ’
                                                ’         ’
                                     ".                ’
                                                ’            ’
                                     ’       ’         ’
                          ’                                  ’
                                    ’              ’
                          ’                  ’




           ._-------------~-------------------------------------------------
                     x




               /
           x




    /                    BIORETENTION
                          SCALE NTS
                                                                 BASIN    PLAN




                   PIT. PIPEWORK AND
                   OUTLET CONFIGURATION
                   AS PER IPWEAQ STD                                     SURCHARGE GRATE UGHT DUlY "TELLAM          BIORETENTION LARGE
                   DWG WSUD-002                                          SPG 900x600 NORMAL GRATE & FRAME           COARSE SEDIMENT
                                                                         ON LEGS" MIN   100 GAP TO PIT.             FOREBAY 200

                                                                         CONTRACTOR TO MEGAPOXY ALL JOINS.          RIVER STONES OVER
                                                                                                                    GEOTEXTILE

                                                                                        WITH




RL102.60




                                .
                                 ~.’   -.."..’_-;,.
                                -
                                    -"_.                                                                     base

Page 15

..

                                                                                             ~
                                                                                         Callaghan & Toth

     5         FLOODING ASSESMENT REPORT

     5.1      Existing Conditions

     This site is not subject to ponding of floodwaters from the adjacent channels and the Q 100 year
     ARI flood levels (Plan 02 shows the Q100 flood level). The buildings and carparks are above
     the Q 100 year ARI flood levels.


     5.2      Proposed Drainage System

     The road surface level is proposed to be drained to an underground drainage system capable of
     taking a Q10 flow. The overflow will discharge to the Bioretention Basin where it will alternate
     flows to be equal to pre-development concentrations.


     The habitable floor level for the proposed development is not affected by the Q 100 flood level.


     The Bioretention Basin has been modelled to act as a detention/infiltration basin. The basin size
     and weir size is sufficient to reduce the increase in runoff for a Q 10 and Q 100 storm back to
     predevelopment levels as shown in Table 5.1. Refer to attached Detail detention basin
     calculations for Q 10 Pre and Post development flow in


              TABLE 5.1:               Pre-Development and Post Development Discharges

                   Location                                Q5              Q10                       Q100
                   Pre-Development                    0.115 m3/s        0.133 m3/s               0.222 m3/s
                   Post Development                   0.118m3/s         0.128 m3/s               0.233 mJ/s




     6        CONCLUSIONS & RECOMMENDATIONS

     An integrated water management approach has been used to assess the site’s stormwater
     requirements and water management needs. In summary:

         .    The proposed four lots area can be treated by a treatment train consisting of one 25m2
              bio-retention basin.
         .    This proposed treatment train achieves the current best practice load based reduction
              targets as prescribed in the Water by Design Deemed to Comply Solutions        -




              Stormwater Quality Management (South East Queensland) version 1.0     Table A-2
                                                                                         -




         .    The new lots have sufficient flood free areas to build residential infrastructure in
              accordance with Council’s requirements.
         .    The rainwater tank and bioretention areas are able to attenuate the runoff
              concentrations back to Pre Development levels and so the development will not have an
              impact on the hydrology of the receiving waters.




                                                                                                             15
     55 Lake MacDonalld Drive   -

                                    Stage 1        SMP Revl.doc                          May 2013     1225

Page 16

                                                                      ~
                                                                   Callaghan & Toth


APPENDIX 1                               Preliminary Stormwater Quality
Management Plan




                                                                                   A
55 Lake MacDonalld Drive   -

                               Stage 1   SMP Revl.doc                 May 2013   1225

Page 17

                                                                                                                                                                          .
                                                                                                                                                                          ,




 APPENDIX 1:                    Preliminary Stormwater Quality Management Plan
                                        EROSION AND SEDIMENT CONTROL PROCEDURES
                                                                                                                                                        -
                                                                                                                -   -                               -   .   ~_..-
                                                                                               -,                             ’~   ._-~                             -’-




                                                                    Construction Phase


Objective   Minimise erosion of soils during civil works construction.

            Minimise loss of sediment from site during civil works construction.

            E&SC measures shall be designed to achieve discharges from the construction site during rainfall events (1 year ARI) to meet the following
            criteria:

                 ~      pH 6.5 to 8.5
                 ~      Suspended Solids < 50mg/L (80th percentile)
            Turbidity to be calibrated.

            Description                                                                                  Responsibility            Timeframe


            .   Install construction fencing to ensure works only occur within designated area.          .   Foreman               .      Prior   to          works
Actions
            .   Establish a single stabilised entry / exit point.                                                                         commencing
            .   Trucks shall use designated entry to site works areas and shall be washed down at a      .   Foreman               .
                                                                                                                                          Ongoing
                prior to exiting the site.
            .   Undertake drainage control measures including:                                           .   Foreman               .
                                                                                                                                          Ongoing
                           -

                                Bypass ’clean’ up-slope water around any soil disturbances
                           -
                               Transport stormwater through the work site in a non-erosive manner
                           -
                                Minimise hydraulic damage to the adopted erosion and sediment control
                                measures     during storm events.
            .   Undertake erosion control measures including:                                                                      .
                                                                                                                                          Ongoing
                           -
                                Limit the area of exposure
                                                                                                         .   Foreman
                           -
                                Progressive stabilisation of disturbed areas with native groundcovers
                           -
                                Heavy mulch to cover on disturbed areas open without activity for more
                               than 20 days
            .   Undertake sediment control measures including:                                                                     .
                                                                                                                                          Ongoing

Page 18

                          -
                              Sediment basins
                          -
                              Sediment fences                                                                  .   Foreman
                          -
                              Field inlet sediment controls
             .
                 Stockpiles of soil shall be controlled by sediment fences on the down slope side.
             .
                 Any stockpiles of fine soil material (excludes coarse sandy materials) shall be covered
                 with plastic sheeting and sandbags if there is no requirement to access a stockpile
                 within three (3)days.
             .   Water from the external catchment will diverted around/through the site via established
                 road kerb and channel and stormwater system and not allowed to enter disturbed
                 areas of the site.

             .   Stormwater runoff within the site shall be directed via stabilised swales to silt traps.
             .   Disturbed areas should be progressively stabilised as quickly as possible completion
                 of cell and rehabilitation earthworks.
             .   Stabilise disturbed areas with heavy mulch (50mm thick) to ensure that erosion does
                 not occur in disturbed   areas   within 20 days of inactivity, even though works      might
                 continue later.


Monitoring   The Contractor will carry out weekly inspections to check:                                        Foreman            Weekly
                 )Works are only occurring within designated area

                 )Erosion and Sediment Control measures to ensure they are cleaned out and
                     maintained in working order.

                 )Stabilisation is occurring on a progressive basis.

                 )For litter and debris

                 )For discharges from sediment basins.

             The Contractor shall take samples during 4 rainfall events every six months to determine
                                                                                                               Foreman            As required
             levels of TSS, turbidity, pH, Dissolved Oxygen. Total Nitrogen, Total Phosphorus and oil &
             grease in runoff discharging from the construction site.


Reporting    )Contractor to maintain a log of inspections, maintenance actions.                                )Project Manager   )As required

             )Records are to be logged and kept for verification of compliance on a need basis.

             )Records of water quality testing to be retained for compliance.

Page 19

Incidents    );>   Bioretention systems not installed correctly                                             );>   Foreman and       );>   As required

             );>   Sediment builds up on the surface of systems.
                                                                                                                  Project Manager

             );>   The vegetation dies off.

             );>   Pondage of water is in excess of one hour.
             );>   Erosion occurs.

             );>   Pondage of water occurs at every minor rainfall event.
             );>   Weed growth occurs.

             );>   Water quality parameters exceed performance criteria.

             If the results of monitoring indicate performance criteria are not met undertake one or all    Foreman and Project     As required
Corrective
             of the following:                                                                              Manager
Action
             .     Undertake a survey of erosion and        sediment control   measures   and   determine
                   effectiveness of current controls.
             .     Reassess the risks of the works areas and determine if further controls will remedy
                   any problems.

Page 20

                                                              BIORETENTION SYSTEMS
             -
                                                                                                                     ~




                                                                      DESIGN PHASE


Objective        To design low maintenance effective stormwater treatment devices to achieve a no-worsening result over the existing pre-development
                 situation in the creeks adjacent the site.



                 Description                                                                                        Responsibility    Timeframe


Actions          Consulting Engineer to design Bioretention Systems in accordance with:                             Design Engineer   During design
                     ~   Bioretention Systems requirements as outlined in the "Water by Design                                        process
                                                                                                 -
                                                                                                     Construction
                         and Establishment Guidelines" Version 1 dated February 2009 prepared by Healthy
                         Waterways
                     ~   Calculations as per BBC Water Sensitive Road Design Guidelines.

                 Consulting Engineer is to ensure that the Bio-Retention Zones are:
                     ~   located in a suitable area,

                     ~   sized according to guidelines,

                     ~   provided with the appropriate construction materials, subsoil drainage and outlet pipe,
                         and

                     ~   incorporated into a stormwater treatment system also including gross pollutant traps,
                         sediment traps, oil traps, detention storages, etc.


Monitoring       Consulting Engineer to ensure that operational works drawings reflect requirements of this         Design Engineer   During design
                 Stormwater Quality Management & Assessment Report.                                                                   process


Reporting        Consulting Engineer to provide Stormwater Quality Management & Assessment Report with              Design Engineer   As required
                 Operational Works application.
                 Design Engineer to provide Operational Works drawings in accordance with requirements.
                 Council is to review the Operational Works Plan and provide relevant documentation relating to
                 application.

Page 21

Incidents         The Bio-Retention Zones are not approved according to submitted plans.


Corrective        The Consultant will amend the design or placement of the Bio-Retention Zones to reflect              Design Engineer   As required
Actions           Council’s requirements and design guidelines.

                  Amend MUSIC model to assess whether changes have affected treatment train effectiveness.

                  Amend treatment train characteristics to ensure that water quality objectives are achieved.




                                                                   CONSTRUCTION PHASE


Objective         The Contractor will install the Bio-Retention Systems in accordance with the Operational Works
                  drawings, including:
                      .   Bioretention Basin   (25m2)


Actions           Description                                                                                          Responsibility    Timing

Up to             Construct bioretention systems in accordance with steps as detailed in "Water by Design       -
                                                                                                                       Foreman           During civil works
installation of   Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands"
filter media      Version 1 dated February 2009.

                  Supervising RPEQ complete Bioretention Construction and Establishment Sign-Off Forms from
                  Water by Design 2009 and submitted to Council prior to On-maintenance.

                  Bioretention systems to be constructed at the end of civil works for the development.

                  Bioretention basin areas used for sediment basins during civil works construction shall have
                  sediments removed prior to layout of bioretention system, drainage media and filter media.

                  Contractor to ensure bioretention systems are protected from sediment laden stormwater runoff
                  during construction period or only install once upstream catchment is stabilised.
                  Following installation of filter media, install temporary cover of geotextile covered with topsoil
                  and turf. This temporary cover will provide protection to Bioretention Basin and Bioretention
                  Swales filter media during building works occurring on site.

Page 22

                                                                                                                                                             .




Following 24   Remove temporary cover of geotextile, topsoil and turf following:                                      Contractor         Following On-
month                                                                                                                                    maintenance or
                     .
                         Acceptance of bioretention systems on maintenance, or                                                           80% completion of
protection
period               .   80% completion of building works upstream of bioretention systems.                                              building works.
               Plant approved plantings into bioretention systems as per construction drawings.

               Contractor to conduct regular watering of all planted bio-retention systems until such time as
               plants are established.
               Maintain bioretention system for a minimum period of 12 months, until system is accepted Off-
               Maintenance.


Monitoring     Hold point   -
                             once bioretention basin   underdrainage pipe work is installed   -

                                                                                                  inspection with     Contractor and     Following
               Council to ensure in accordance with design.                                                           Council            underdrainage
                                                                                                                                         pipe work
               Sample drainage layer, transition layer, filtration media materials must be stockpiled on-site and
                                                                                                                                         installation
               certification that the filtration media complies with guidelines.

               The Contractor will carry out weekly inspections of the Bio-Retention Systems (Including during
                                                                                                                      Contractor
               the defects liability period). The following will be examined at each inspection:                                         Weekly
               );>   Sediment build up on the surface
               );>   Health of vegetation
               );>   Pondage during major storms not infiltrating into the sand
               );>   Erosion at the outlet
               );>   Pondage during minor storms
               One month after installation of plants in bioretention system:                                         Contractor
                                                                                                                                         One month after
               );>   Field test hydraulic conductivity in accordance with FAWB guidelines.                                               installation


Reporting      );>   Contractor to maintain a log of inspections, watering and other actions.                         );>   Contractor   );>   As required

               );>   Records are to be logged and kept for verification of compliance on a need basis.

               );>   Bio-retention designer I Engineer shall perform inspections during construction stage and fill
                     out Water by Design forms for compliance.

Page 23

                                                                                                                                                                           .
                                                                                                                                                                               .




Incidents    ::   Bioretention systems not installed correctly                                                   ::                                     ::

             ::   Sediment builds up on the surface of systems.

             ::   The vegetation dies off.

             ::   Pondage of water is in excess of one hour.
             ::   Erosion occurs.

             ::   Pondage of water occurs at every minor rainfall event.
             ::   Weed growth occurs.


Corrective   ::   Contractor to amend installation to ensure it complies with Operational Works drawings.        ::       Contractor                    ::   As required
Action
             ::   The Contractor will check up stream sediment control and fix failures. The sediment build up
                  will be shovelled off the non-woven geotextile of the Bio-Retention Systems. The geotextile
                  will be replaced at the beginning of the defects liability period

             ::   Unsuccessful plantings will be replaced as required. A normal allowance of 10% should be
                  made for unsuccessful plantings. Ensure watering rates are adequate and increase if
                  necessary.

             ::   Replace geotextile where used, check and if necessary replace sand media with coarser
                  sand. Check that slotted pipe is not blocked and outlet free draining. Replace and repair
                  where necessary.

             ::   Erosion should be repaired and investigate measures to reduce erosion e.g. install rock
                  spalls upstream of the erosion so as to dissipate the flow across a broad area.
             ::   Dominating weeds should be removed by hand and taken to the Council’s Refuse Centre.
                                                                                                                            ~. ---_--_--        .   -
  -                                                                                                                   ~                    ~-
                                                                                                                                                              .




                                             Operational Phase

Objective    The Council is to include the Bio-Retention Systems into their maintenance program.


             Description                                                                                         Responsibility                         Timing

Actions      Inspect Bio-retention systems every three months for first year of operation to determine           Contractor                             Three monthly
             maintenance requirements.

Page 24

             Undertake general maintenance such as:

                 ~   Remove accumulated litter / debris
                 ~   Remove accumulated sediments
                 ~   Remove weeds and dead plants
                 ~   Replace plants where necessary
                 ~   Water plants if necessary
                                                                                                                   Council      Every ten years
                 ~   Control erosion and sediment loss upstream or within system where necessary.

             Routine clean outs of bio-retention systems should be planned on a ten-yearly basis.


Monitoring   The Council Landscape Gardener will carry out six monthly inspections of the Bio-Retention            Council      Six monthly
             Systems. The following will be examined at each inspection:
                 ~   Sediment build up on the surface under the river stones
                 ~   Health of vegetation
                 ~   Pondage during major storms not infiltrating into the sand
                 ~   Erosion at the outlet
                 ~   Pondage during minor storms
                                                                                                                   Contractor   Two years after
             Two years after plants are established in bioretention system:
                                                                                                                                installation
             Undertake field testing of hydraulic conductivity of filter media to assess impact of vegetation on
             hydraulic conductivity, in accordance with FAWB guidelines.
                                                                                                                                Biennial
             Test hydraulic conductivity every two years, in accordance with FAWB guidelines.                      Council


Reporting    Inspection Records are to be logged and kept for verification of compliance on a need basis.          Contractor   As required

             Records of any maintenance are to be logged and kept on site.

             Records of environmental incidents and corrective actions should be kept on site and Council
             notified of any problems.


Incidents    Sediment builds up on the surface.

             The vegetation dies off.

             Pondage of water is in excess of one hour.
             Excessive erosion occurs within the system.

             Pondage of water occurs at every minor rainfall event.

Page 25

             Weed growth occurs.



Corrective   The Council Landscape Gardener will check up stream sediment control and fix failures. The     Contractor and   As required
Action       sediment build up will be removed without damage to existing vegetation.                       Council

             Unsuccessful plantings will be placed as required. A normal allowance of 10% should be made
             for unsuccessful plantings.

             Ensure watering rates are adequate and investigate plants with higher drought tolerances if
             significant numbers of plants die during dry periods.
             Replace geotextile, check and if necessary replace sand media with coarser sand. Check that
             slotted pipe is not blocked and outlet free draining. Replace and repair where necessary.

             Erosion should be repaired and investigate ways to reduce erosion occurrence e.g. place rock
             spalls upstream of the erosion so as to dissipate the flow across a broad area.
             Dominating weeds should be removed by hand and taken to the Council’s Refuse Centre.

Page 26

                                                            ~
                                                         Callaghan & Toth


APPENDIX 2                               MUSIC Results




                                                                         B
55 Lake MacDonalld Drive   -

                               Stage I   SMP Rev l.doc      May 2013   1225

Page 27

                                   Receiving          Node          Drainage            Easement                  1/05/2013 3:41:53      PM




                                                    Treatment   Train   Effectiveness


                  Flow   (HL/yr)   Peak   Flow   (m3/yr)    TSS    (kg/yr)          TP   (kg/yr)   TN   (kg/yr)   Gross   Pollutants   (kg/y

Sources                  4.51             11.0E-3                 1.05E3                  1. 96          9.43                  96.2



Residual   Load          4.45             24.7E-3                  55.’                  0.517           3.69                  0.00



,Reduction                1.4              -123.7                   94.7                  73.6           60.9                 100.0

Page 28

     ....TT...z.r:::-.’TrrrFT-~_...r.".r’zx::-~~=m........=:____T%1’=.,..._Z
      DESCRIPTION
     Lake Macdonald Drive Stige 1 (4lots)

     =-~"""e=:=-
                                                       =~=:_--==x:.::z.__==--==-=-~
     VersionNumber
                                                                                                                                                   200 (MUSICSetup File version number)


     Meteoro&ogicalTemptate
                                                                                                                                                         (MlB Filename)
    Cooroy
    m..-=-.a.z=~_~e...,..                                              -==--:::ZTm..-.:zs=~:I:=.a.=.m..~




    Node Type
                                                                                                                       UrbanSourceNode                   UrbanSourceNode                  Urban50urceNode
    Node Name
                                                                                                                                                                                                                     (NodeType)
                                                                                                                       Roadways                          lot 17 to 20 Roof Area
                                                                                                                                                                    -
                                                                                                                                                                                          lot 17 t020 Yard
                                                                                                                                                                                                    -

                                                                                                                                                                                                                     (Node Name)
    Node 10
                                                                                                                                                     1                                3                          5 (Node10)
    Coordinates
                                                                                                                       -17.6854585049689:69.068548329 -418.835305397327:-5.992232097 -184.758742922395:61.12064704
    General-location
                                                                                                                                                                                                                     (CoordinatesHIX:y])
                                                                                                                       Roadways                          Lot 17 to 20 Roof Area
                                                                                                                                                                    -
                                                                                                                                                                                          Lot 17 t020 Yard
                                                                                                                                                                                                    -



    General. Notes
    General- Fluxes Daily  -




    General- Fluxes        -
                               Sul>-Daily
    Areas   -
                Total Area (ha)
                                                                                                                                                 0.125                            0.08                       0.167 (ha)
    Areas -Impervious (")
                                                                                                                                                   90                              100                         30 (%)
    Areas   -
                Pervious (")
                                                                                                                                                    10                                o                        70 (%)
    RainfalHlunoff -Impervious Area               -
                                                      Rainfall Threshold (mm/day)                                                                    1                                1                         1 (mm/day)
    Rainfall-Runoff Pervious Area Soil Storage Capacity (mm)
                       -                     -



                                                                                                                                                  500                              500                        500 (mm)
    Rainfall-Runoff    -
                           Pervious Area -Inltiol Storage ("of Capacity)
                                                                                                                                                   50                               50                         SO (%of Capacity)
    Rainfall-Runoff    -   Pervious Area     -   Field Capacity (mm)
                                                                                                                                                  200                              200                        200 (mm)
    Rainfall-Runoff Pervious Area -Infikratlon Capacity CoeffICient
                       -

                                                                                                        a
                                                                                                    -

                                                                                                                                                  211                              211                        211
    Ralnfal~Runoff Pervious Area -Infikratlon Capacity Exponent b
                       -
                                                                                                -



                                                                                                                                                                                     5                          5
    Rainfall-Runoff Groundwater Properties -Inkiol Depth (mm)
                       -


                                                                                                                                                   50                               50                         50 (mm)
    Rainfall-Runoff Groundwater Properties
                       -                                   -
                                                               Daily Rocha..e Rate (%)                                                             28                               28                         28 (%)
    Rainfall-Runoff Groundwater Properties
                       -
                                                           -
                                                               Daily Baseflow Rate (%)                                                             27                               27                         27 (%)
    RainfalHlunoff Groundwater Properties
                       -
                                                           -
                                                               Dally           ep Seepage Rate (%)
                                                                           ,
                                                                                                                                                    0                                o                          o (%)
    Total Suspended Solids          -
                                        Ba.. Flow Concentratioo                -
                                                                                   Mean (log mill)                                                   1                               o                          1 (log mill)
    Total Suspended Solids          -
                                        Base Flow Concentration                -   Std De.(log mill)                                              0.34                               o                       0.34 (log mill)
    Total Suspended Solids          -
                                        Ba.. Flow Concentration                -
                                                                                   Estimation Method
                                                                                                                                                                                                                1 (Index from 0to 1 for "Mean" I "Stochastically ,enerated")
    Total Suspended Solids          -
                                        Base Flow Concentration                -
                                                                                   Sertal Correlation (R squared)’                                  0                                o                          o {R squared)
    Total Suspended Solids          -
                                        Storm Flow Concentration                   -
                                                                                       Mean (log mill)                                            2.43                              1.3                      2.18 (log mill)
    Total Suspended Solids Storm Flow Concentration
                                    -
                                                                                   -
                                                                                       Std Dev (log mill)
,
                                                                                                                                                  0.39                            0.39                       0.39 (10,mill)
    Total Suspended Solids Storm Flow Concentration
                                    -                                              -
                                                                                       Estimation Method                                            1                                1                          1 (Index from 0to 1 for "Mean" I "Stochastically ,en.rated")
    Total Suspended Solids          -
                                        Storm Flow Concentration                   -
                                                                                       SeriolCorrelation (R squared)                                0                                o                          o (R squared)
    Total Phosphorus Base Flow Concentration
                            -
                                                                   -
                                                                       Mean (log mill)                                                           -0.97                               o                       -0.97 (log mg/l)
    Total Phosphorus Base Flow Concentration Std Dev (log mill)
                            -
                                                                   -

                                                                                                                                                  0.31                               o                       0.31 (log mg/l)
    Total Phosphorus       -    Base Flow Concentration- Estimation Method
                                                                                                                                                                                                                1 {Index from 0to 1 for "Mean" I "Stochastlcally,enerated")
    Total Phosphorus Base Flow Concentration
                            -
                                                                   -
                                                                       Serial Correlation (R squared)                                               0                                o                          o (R squared)
    Total Phosphorus Storm Flow Concentration
                            -
                                                                       -
                                                                           Mean (log mill)                                                        -0.3                            -0.89                      -0.47 (log mg!l)
    Total Phosphorus Storm Flow Concentration
                            -
                                                                       -
                                                                           Std Oev (log mill)                                                    0.31                             0.31                       0.31 (log mg!l)
    Total Phosphorus Storm Flow Concentration
                            -
                                                                       -
                                                                           Estimation Method                                                        1                                1,                         1 {Index from 0to 1 for "Mean" I "5tochastically,enorated")
    Total Phosphorus Storm Flow Concentration Serial Correlation (R squared)
                           -                                           -

                                                                                                                                                    0                                o                          o (Rsquared)
    Total Nitrogen    -   Base Flow Concentration          -
                                                               Mean (log mill)                                                                    0.2                                o                        0.2 (la,mill)
    Total Nitrogen    -
                          Base Flow Concentration          -   Std Dev (10,mill)                                                                  0.2                                o                        0.2 (10’mill)
    Total Nitrogen    -
                          Base Flow Concentration          -
                                                               Estimation Method                                                                    1                                                           1 (Index from 0to 1 for "Mean" I "Stochastically ,enerated")
    Total Nkrogen     -
                          Base Flow Concentration          -
                                                               Sertal Correlation (R squared)                                                       0                                o                          o (R squared)
    Total NHro,en     -   Storm Flow Concentration             -
                                                                   Mean (log mill)                                                               0.26                             0.26                       0.26 (log mill)
    Total Nkrogen     -
                          Storm Flow Concentration             -
                                                                   Std Dev (log mill)                                                            0.23                             0.23                       0.23 {log mill)
    Total Nitroaen    -
                          Storm Flow Concentration             -
                                                                   Estimation Method                                                                1                                                           1 (Index from 0to 1 for "Moan" I "Stochastically,enerated")
    Total Nkrogen     -
                          Storm Flow Concentration             -
                                                                   Serial Correlation (R squared)                                                   0                                o                          o {R squared)

    Node Type                                                                                                          BioRetentionNodeV4             (NodeType)
    Node Name                                                                                                          Bioretention Basin             {Node Name}
    Node 10                                                                                                                                         6 (Node10)
    Coordinates                                                                                                        135.250855692521:-221.02984849 (CoordinatesHIX:y])

Page 29

 Generill-loation                                                                               Bioretention Sasin
                                                                                                                                                                                                                                                                                             .
General- Notes                                                                                                                                                                                                                                                                                   -




General- Fluxes
 Inlet Properties   -
                        low Flow By-poss (cubic metres per see)
                                                                                                                                      o (cubic metres per see)
 Inlet Properties Hiah Flow BV-poss (cubic metres per see)
                    -


                                                                                                                                    100 (cubic metres ’per see}
St"",se Proj>ertles Extended Detention Depth (metres)
                            -


                                                                                                                                    0.3 (metres)
Storile Properties Surface Area (square metres)
                            -



                                                                                                                               46.69 (square metres)
Filter and Media Properties               -
                                              Filter Aru (square metres)
                                                                                                                                     25 (square metres)
Filter ond Media Properties               -
                                              UnUned Fitter Media Perimeter (metres)
                                                                                                                                   20.5 (metres)
Filter and Medio Properties               -
                                              Soturated Hydraulic Conductivity (mm/hr)
                                                                                                                                    200 (mm/hr)
Filter ond Medio Properties               -
                                              Fitter Depth (metres)
                                                                                                                                    0.5 (metres)
Filter and Media Properties TN Content of Filter Media (ms/l<a)
                                          -


                                                                                                                                    800 (mJlka)
Filter and Media Properties               -

                                              Orthophosphote Content of Filter Med’" (ms/l<g)                                        50 (milks)
Infiltration Properties Exfiltrotlon Rate (mm/hr)
                                    -


                                                                                                                                      o {mm/hr}
Uni"ll Properties Sase Uned
                        -



                                                                                                                                      o
Vegetation Properties. Vesetation Properties                                                                                          o {Index from 0to 2 for -Vegetated with Effective Nutrient Removal Plants"
                                                                                                                                                                                                                   I .Vegetate~ with Ineffective Nutrient Removal Plants- I "Unveaetated"}
Outlet Properties Overflow Weir WIdth (metres)
                        -

                                                                                                                                      3 {metres}
Outlet Properties       -
                            Underdroln Present
                                                                                                                                      o
Outlet Properties       -
                            Submeraed Zone With carbon Present
Outlet Properties       -
                            Submerged Zone Depth (metres)                                                                             o {metres}
Advanced Properties Total Suspended Solids
                                -                              -
                                                                    k (m/yr)                                                       8000 (m/yr)
Advanced Properties Toul Suspended Solids
                                -
                                                               -
                                                                    C.(milL)                                                         20 (mill)
Advanced Properties Total Phosphorus k (m/yr)
                                -
                                                          -


                                                                                                                                   6000 (m/yr)
Advanced Properties Total Phosphorus C.(ma/L)
                                -                         -


                                                                                                                                   0.13 {mill}
Advanced Properties Total Nitroa_n
                                -
                                                     -   k (m/yr)                                                                  500 {m/yr}
Advanced Properties Total Nitroaen
                                -
                                                     -   C. (mill)                                                                  1.4 {mill}
Advonced Properties             -
                                    Filter Media Soil Type                                                                            1 {Index from 0to 4 for ’Sand’ ( ’Loamy Sond’ I ’Sondy loam’ I "Silt loam’ I ’Loam’)
Advanced Properties             -
                                    Weir Coetnc:ient                                                                                1.7
Advoneed Properties Number of CSTR Cells
                                -




Advonced Properties             -
                                    Porosity of Filter Medio                                                                       0.35
Advanced Properties Porosity of Submerged Zone
                                -

                                                                                                                                   0.35
Adv4anced Properties            -
                                    Horizontal Flow Coefficient                                                                      3


Node Type                                                                                       RainWaterTankNode                         (NodeType)
Node Name                                                                                       RW Tonk       lot 17-20 (4x 5kl)
                                                                                                          -

                                                                                                                                          (Node Nome)
Node 10
                                                                                                                                     4 (NodeID)
Coordinates                                                                                     -274.721280685625:-70.01972412:{Coordlnotes)((X:Y}}
Generol- location                                                                               RWTank    -
                                                                                                              lot 17-20 (4x 5kl)
General- Notes
Generol- Fluxes
Stormwater Re-use           -
                                Use stored water for Irr!ation or other purpose                                                      o
Stormwoter Re-use           -
                                Annual Demand (kL/yr)Scaled by Daily: PET                                                            o {kL/yr}
Stormwater Re-use           -
                                Annual Demand (kk/yr)Scaled by Dally: PET Rain -
                                                                                                                              483.33 {kk/yr}
Stormwater Re-use           -
                                Daily Demand [kL/day)                                                                              0.19 (kL/day)
Stormwater Re-use           -
                                User-defined d~tributlon of Annual Demand (kL/yr)                                                    o (kL/yr)
Stormwater Re-use           -
                                User~efined time series
Inlet Properties   -
                       Low Flow By-pass (cubic metres per see)                                                                       o {cubiC metres per see}
Inlet Properties   -

                       High Flow By-pass (cubic metr.. per see)                                                                    100 (cubic metres per see)
Storage Properties.Surface Area {square metres}                                                                                    12.6 (square metres)
Storoae Properties Depth above overflow (metres)
                            -


                                                                                                                                    0.2 (metres)
Storoge Properties Voklme below ove low pipe (kl)
                            -

                                                                                                                                    20 {kl}
Outlet Properties Overflow Pipe D"’meter (mm)
                        -

                                                                                                                                   360 {mm}
Advanced Properties             -   OrifICe Dlscharae CoeffICient                                                                   0.6
Advanced Properties. Numberof CSTR CeUs                                                                                              2
Advanced Properties Totol Suspended Solids
                                -
                                                               -   k (m/yr)                                                        400 (m/yr)
Advanced Properties Total Suspended Solids
                                -                              -
                                                                   C.(mill)                                                         12 (mill)
Advanced Properties Total Suspended Solids C.. (mill)
                                -                              -

                                                                                                                                    12 (mill)
Advanced Properties Total Phosphorus. k (m/yr)
                                -

                                                                                                                                   300 {m/yr}
Advanced Properties             -
                                    Totol Phosphorus C.(milL)
                                                          -

                                                                                                                                   0.13 (mill)
Advanced Properties             -   Total Phosphorus C.. (mill)                                                                    0.13 {mill}
                                                          -




Advanced Properties             -   Total Nitrogen   -
                                                         k (m/yr)                                                                   40 {m/yr}
Advanced Properties             -
                                    Total Nitrosen   -   C. (mill)                                                                  1.4 {mill}

Page 30

Advanced Properties Total Nitroaen
                      -                 -
                                         C"(mall)
                                                                                                 1.4 {mg/l}
Advanced Propertie>   -   Threshold Hydraulic loadi",for C"(m/yr)                                                                                                                                          .
                                                                                                                                                                                                           .
                                                                                               3500 (m/yr)
Advanced Properties   -
                          User Defined Storalie-Dlscharge-Heiaht


Node Type
                                                                    JunctionNode                     (NodeType)
Node Name
                                                                    Junction                         (Node Name)
NodelD
                                                                                                11 (NodelD)
Coordinates
                                                                    -24.9142583086237:-210.6693368< (Coordinates}([X:Y)}
General-location                                                    Junction
General- Notes


Node Type
                                                                    ReceivingNode                   (NodeType)
Node Name
                                                                    Receiving Node Drainage Easemel (Node Name)
                                                                                    -




Node 10
                                                                                                 2 (Node ID)
Coordinates
                                                                    314.225545770982:-244.20909991 (Coordinates}([X:YIl
General- Location
                                                                    Receiving Node Drainage Easement
                                                                                    -




General- Notes
Unk Name
                                                                    D...lna,e Unk
Source Node ID
                                                                                                  6 {The Is thelD of the upstream node}
Tar,et Nod. ID                                                                                    2 {ThIs Is the ID of the downstream node}
Routine                                                             Not Routed                       {either "Not Routed" or "Routed"}
Muskingum K                                                                                    1200 (no value req~ired for no rDutin or .numerical value" for
                                                                                                                                                                  routed)
Muski"lum Theta                                                                                0.25 {no value required for no routine or ’"numerical value" for routed. Must be between 0.1 and
                                                                                                                                                                                                   0.49}

UnkName
                                                                    Drainage link
Source Node 10
                                                                                                  3 {The is the ID of the upstream node}
Target NodelD                                                                                     4 {This is the 10 ofthe downstream node}
Routing                                                             Not Routed                       (either "Not Routed’" or ’"Routed’")
MuskinlumK                                                                                     noo (no value required for no routing or "numeralvalue. for routed)
Muskingum Theta                                                                                0.25 (novalue required for no routing or ’"numerical value’" for routed. Must be between 0.1 and
                                                                                                                                                                                                   0.49)

link Name
                                                                    Orainaat Unit
Source Node 10
                                                                                                  4 {The Is the 10 ofthe upstream node}
Target Node 10                                                                                   11 (This is the 10 of the downstr.am node)
Routing                                                             Not Routed                      (~ ther "Not Routed’" or .Routed")
Muskingum K                                                                                    7200 (no value required for no routlna: or "numerical value. for
                                                                                                                                                                  routed)
Musklneum Theta                                                                                0.25 (no value required for no routing or "numerical value’" for routed. Must be between 0.1 and
                                                                                                                                                                                                   0.49)

UnkName
                                                                    D...looge Unk
Source Node ID
                                                                                                  1 (The Is the 10 of the upstream node)
Target Node ID                                                                                   11 (This is the ID of the downstream node)
Routing                                                             Not Routed                      (either ’"Not Routed" or "Routed")
Muskingum K                                                                                   7200 {no value required for no routing or ’"numerical value" for routed}
Muskingum Theta                                                                                0.25 {novalue required for no routine or ’"numerical value’" for routftt. Must be between 0.1 and
                                                                                                                                                                                                   0.49}

Unk Name
                                                                    Drainage Unk
Source Node 10
                                                                                                 11 {The Is the ID ofthe upst",am node}
Target Node 10                                                                                    6 (This is the ID of the downstream node)
Routine                                                             Not Routed                      {either "Not Routed’" or "Routed’"}
Muskingum K                                                                                   7200 (novalue required for no routina or "numerical value. for routed)
Muskingum Theta                                                                                0.25 {no value required for no routiOi or ’"numerical value" for routed. Must be between 0.1 and
                                                                                                                                                                                                   O.49}

Link Name
                                                                    Drainage Unk
Source Node 10                                                                                    5 {The Is the ID of the upstream node}
Taraet Node 10                                                                                   11 {This is the 10 of the downstream node}
Routina                                                             Not Routed                      {either "Not Routed" or "Routed")
MusklngumK                                                                                    7200 {no value required for no routing or ’"numerk:.al value" for routed}
Musklngum Theta                                                                                0.25 {no value required for no routine or "numer~1value" for routed. Must be between 0.1 and
                                                                                                                                                                                                   O.49}
=~=~=--=-~==x:z-=e=azz--.:IlZ:Z.=S===Z:=_~~--===

Page 31

                                                           ~
                                                        Callaghan & Toth

APPENDIX 3                               Site Photos




                                                                        C
55 Lake MacDonalld Drive   -

                               Stage 1   SMP Revl.doc      May 2013   1225

Page 32

                                                                                                ~
                                                                                             Callaghan & Toth


APPENDIX 3                                           Site Photos


             ~_ ’~.~~1~
                               ~.        _-..




                       Photo 1       Lake MacDonald Drive Culvert Crossing
                                     -




                                                                              .:-.



                                                                           ".,.J. ’.
                                                                            ;j,:./,\ ,’.
                                                         f                     ’~       ~
                                                        ",’                \.:--\;.   <1,.
                                                ,~~,’ ~l~~ ~..   ~
                                                                       I
                                                                      .",_.:~.
                                                                              .~1
                                                         .’                 \...
                                                          ..’
                                                                     ~.~
                                                                 ’;.’~~~ ~("




                                Photo 2     -
                                                Lake MacDonald Drive Verge



                                                                                                           C
55 Lake MacDonalld Drive   Stage I
                           -                             SMP Rev I.doc                                May 2013   1225

Page 33

                                                                    ~
                                                                 Callaghan & Toth

APPENDIX 4                               Q10 Pre and Post Development




                                                                                 D
55 Lake MacDonalld Drive   -

                               Stage 1   SMP Revl.doc               May 2013   1225

Page 34

              existing road reserve
                 catchment area




       o
lots 1 to 4 less roof+dve
                                                                                         ~
                                                                                     (new Reach)

               o
       Existing roof+drive area




   e IReachl ~ ~                      Routing Diagram for PRE DEVELOPMENT Q10 Cooroy stg 1 4 lots
                                       Prepared by {enter your company name here}, Printed 19/04/2013
                                        HydroCADI 10.00 sin 05328 @2011 HydroCAD Software Solutions LLC

Page 35

,




PRE DEVELOPMENT Q10 Cooroy stg 1 4 lots
Prepared by {enter your company name here}                          Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                Page 2

                                         Area Listing (all nodes)


           Area      C     Description
      (hectares)           (subcatchment-numbers)
         0.2195    0.74    LIGHT GRASS ON clay      (2S)
         0.1248    0.86    EXIST ROAD+VERGE        (6S)
         0.0276    0.90    existing roof+DVE (5S)
         0.3719    0.79    TOTAL AREA

Page 36

,




PRE DEVELOPMENT Q10 Cooroy stg 1 4 lots
Prepared by {enter your company name here}                        Printed 19/04/2013
HydroCAOO 10.00 sin 05328 @2011 HydroCAD Software Solutions LLC              Page 3

                                     Soil Listing (all nodes)

           Area    Soil      Subcatchment

      (hectares)   Group     Numbers

         0.0000    HSGA
         0.0000    HSGB
         0.0000    HSGC
         0.0000    HSGD
         0.3719    Other     2S, 5S, 6S
         0.3719              TOTAL AREA

Page 37

     ,



..




     PRE DEVELOPMENT Q10 Cooroy stg 1 4 lots
     Prepared by {enter your company name here}                                                 Printed 19/04/2013
     HydroCAOO 10.00 sin 05328 @2011 HydroCAD Software Solutions LLC                                       Page 4

                                             Ground Covers (all nodes)

           HSG-A        HSG-B        HSG-C        HSG-D          Other        Total    Ground                 Subcatchment

         (hectares)   (hectares)   (hectares)   (hectares)   (hectares)   (hectares)   Cover                  Numbers

           0.0000       0.0000       0.0000       0.0000       0.1248       0.1248     EXIST ROAD+VERGE       6S
           0.0000       0.0000       0.0000       0.0000       0.2195       0.2195     LIGHT GRASS ON clay 2S
           0.0000       0.0000       0.0000       0.0000       0.0276       0.0276     existing roof+DVE      5S

           0.0000       0.0000       0.0000       0.0000       0.3719       0.3719     TOTAL AREA

Page 38

..




     PRE DEVELOPMENT Q10 Cooroy stg 1                noosa 10-Year        Duration=6 min, Inten=208.9 mrnlhr
     Prepared by {enter   your company name     here}                                         Printed 19/04/2013
     HydroCAD<ID 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC                                   Page 5

                                Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
                                Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
                      Reach routing by Stor-Ind method   -   Pond routing by Stor-Ind method


     5ubcatchment 25: lots 1 to 4 less          Runoff Area=2,195.0 m2 0.00% Impervious       Runoff Depth=13 mm
                                                             Tc=10.0 min    C=0.74    Runoff=0.05663 m3/s 0.027 MI


     5ubcatchment 55: Existing roof+drive area Runoff Area=276.0 m2 0.00% Impervious Runoff Depth=25 mm
                                                              Tc=6.0 min    C=0.90    Runoff=0.01443 m3/s 0.007 MI


     5ubcatchment 65: existing road reserve     Runoff Area=1 ,247.5 m2    0.00% Impervious   Runoff Depth=24 mm
                                                              Tc=6.0 min    C=0.86    Runoff=0.06234 m3/s 0.030 MI


     Reach 4R: (new Reach)                                                            Inflow=0.13341 m3/s 0.065 MI
                                                                                     Outflow=0.13341 m3/s 0.065 MI


                Total Runoff Area = 0.3719 ha   Runoff Volume = 0.065 MI        Average Runoff Depth = 17 mm
                                             100.00% Pervious = 0.3719 ha        0.00% Impervious = 0.0000 ha

Page 39

     )

,.




     PRE DEVELOPMENT Q10 Cooroy stg 1                           noosa   to-Year Duration=6 min, Inten=20B.9 mrn/hr
     Prepared by {enter                     here}
                                 your company name                                                   Printed 19/04/2013
     HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                                            Page 6

                               Summary for Subcatchment 2S: lots 1 to 4 less roof+dve

     [48]Hint: Peak<CiA due to short duration

     Runoff          =       0.05663 [email protected] hrs, Volume=                 0.027 MI,   Depth= 13 mm

     Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
     noosa 10-Year           Duration=6 min, Inten=208.9 mm/hr


               Area (m2)          C   Description
                   2,195.0     0.74   LIGHT GRASS ON clay
                   2,195.0            100.00% Pervious Area


              Tc     Length       Slope Velocity       Capacity    Description
       (min) (meters)            (m/m) (m/sec)           (m3/s)
        10.0                                                       Direct Entry, GRASS OVER clay


                                      Subcatchment 2S: lots 1 to 4 less roof+dve

                                                Hydrograph
                                                                                                        ’IRunoff~


       -

        I/)
       ;;;-
        E
       -




        3:
       ..2
       LL




                         o                         1                        2                       3
                                                         Time     (hours)

Page 40

                                                                                                                 ~
     .
                                                                                                                      ~
’"
     PRE DEVELOPMENT Q10 Cooroy stg 1                      noosa 10-Year       Duration=6 min, Inten=20B.9 mmlhr
     Prepared by {enter     your company name       here}                                        Printed 19/04/2013
     HydroCAD<ID 10.00 sin 05328 @2011 HydroCAD Software Solutions LLC                                      Page 7

                          Summary for Subcatchment 55: Existing roof+drive area

     Runoff      =       0.01443 [email protected] hrs, Volume=                  0.007 MI, Depth= 25 mm


     Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
     noosa 10-Year   Duration=6 min, Inten=208.9 mm/hr


             Area (m2)       C    Description
                 276.0     0.90   existing roof+DVE
                 276.0            100.00% Pervious Area


            Tc   Length      Slope Velocity       Capacity    Description
      (min) (meters)        (m/m) (m/sec)           (m3/s)
         5.0                                                  Direct Entry, existing roof
         5.0         0.0    Total, Increased to minimum Tc      =   6.0 min


                                  Subcatchment 55: Existing roof+drive area

                                           Hydrograph
                                                                                                    II Runoff~


       -



       ~
        E
       -




        ~
       ii:
                                                                                        C=O.90




                                              1                          2                    3
                                                    Time     (hours)

Page 41

PRE DEVELOPMENT Q10 Cooroy stg 1                         noosa 10-Year     Duration=6 min, Inten=20B.9 mrnlhr
Prepared by {enter your company name here}                                                    Printed 19/04/2013
HydroCAOO 10.00 sin 05328 @ 2011 HydroCAD Software Solutions LLC                                         Page 8

               Summary for 5ubcatchment 65: existing road reserve catchment area

Runoff          =       0.06234 [email protected] hrs, Volume=                0.030 MI, Depth= 24 mm


Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year       Duration=6 min, Inten=208.9 mm/hr


          Area (m2)         C   Description
              1 247.5    0.86   EXIST ROAD+VERGE
              1,247.5           100.00% Pervious Area


         Tc     Length     Slope Velocity       Capacity    Description
 (min) (meters)            (m/m) (m/sec)          (m3/s)
    6.0                                                     Direct Entry, road +verge+conc footpath


                         5ubcatchment 65: existing road reserve catchment area

                                          Hydrograph
                                                                                                 ’IRunoff~
                                                                            noosa       ear

                                                                          Duration=6 min,
                                                                             =208.9 mm/hr
  -



  ~
   E
  -




   ;:
   o                                                                           Tc=6.0 min
  u:::




                                            1                        2                    3
                                                  Time     (hours)

Page 42

PRE DEVELOPMENT Q10 Cooroy stg 1               noosa 10-Year    Duration=6 min, Inten=20B.9 mm/hr
Prepared by {enter your company name here}                                        Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                                  Page 9

                             Summary for Reach 4R: (new Reach)

[40]Hint: Not Described (Outflow=lnflow)

Inflow Area =      0.3719 ha,   0.00% Impervious, Inflow Depth =     17 mm   for 10-Year event
Inflow    =     0.13341 [email protected] hrs, Volume=         0.065 MI
Outflow   =     0.13341 [email protected] hrs, Volume=         0.065 MI, Atlen= 0%, Lag= 0.0 min


Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs

                                      Reach 4R: (new Reach)

                                   Hydrograph
                                                                                      I Inflow
                                                                                      IOutflow




  -



  !!
   E
  -




   ~
   o




            o                     1                     2                     3
                                       Time   (hours)

Page 43

    @
lots 1 to 4 + road




                         M        ......
                                                                                                                                                                     ~
                                           ......
                                                    ......
                                                             ......
                     47sqm Bioretention                               ......                                                                                       (new Reach)
                                                                               ......
                                                                                        ......
                                                                                                 ......
                                                                                                          ......
                                                                                                                   ......
                                                                                                                            ......
                                                                                                                                     ......
                                                                                                                                              ......
                                                                                                                                                       ......




                                                                                                                                                                b~
                                                                                                                                                                (new Reach)




eB~~                            Routing Diagram for Post DEVELOPMENT Q1OCooroy stg 1 4 lots
                                 Prepared by {enter your company name here}, Printed 19/0412013
                                  HydroCA[}(!!) 10.00 sin 05328 @2011 HydroCAD Software Solutions LLC

Page 44

Post DEVELOPMENT Q10Cooroy stg 1 4 lots
Prepared by {enter your company name here}                          Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                Page 2

                                         Area Listing (all nodes)


           Area      C     Description
      (hectares)          (subcatchment-numbers)
         0.3719    0.84    road+lots (2S)
         0.3719    0.84   TOTAL AREA

Page 45

 "




Post DEVELOPMENT Q10Cooroy stg 1 4 lots
Prepared by {enter your company name here}                        Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC              Page 3

                                     Soil Listing (all nodes)

           Area    Soil      Subcatchment

      (hectares)   Group     Numbers

         0.0000    HSGA
         0.0000    HSGB
         0.0000    HSGC
         0.0000    HSGD
         0.3719    Other     2S
         0.3719              TOTAL AREA

Page 46

Post DEVELOPMENT Q10Cooroy stg 1 4 lots
Prepared by {enter your company name here}                                                Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC                                     Page 4

                                       Ground Covers (all nodes)

     HSG-A        HSG-B        HSG-C        HSG-D          Other        Total    Ground         Subcatchment

   (hectares)   (hectares)   (hectares)   (hectares)   (hectares)   (hectares)   Cover          Numbers

     0.0000       0.0000       0.0000       0.0000       0.3719       0.3719     road+lots     2S

     0.0000       0.0000       0.0000       0.0000       0.3719       0.3719     TOTAL
                                                                                 AREA

Page 47

Post DEVELOPMENT Q10Cooroy stg 1 4 lots
Prepared by {enter your company name here}                                             Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                                     Page 5

                                        Pipe Listing (all nodes)

  Line#   Node       In-Invert   Out-Invert    Length    Slope       n    DiamlWidth   Height   Inside-Fill

          Number    (meters)      (meters)    (meters)   (m/m)                 (mm)     (mm)        (mm)
          2P         101.150      101.100        5.00    0.0100   0.010         225        0             0

Page 48

Post DEVELOPMENT Q10Cooroy stg 1 noosa 10-Year Ouration=10 min, Inten=173.2 mrnlhr
Prepared by {enter your company name here}                                                Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC                                         Page 6

                           Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
                           Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
                 Reach routing by Stor-Ind method   Pond routing by Stor-Ind method
                                                     -




8ubcatchment 28: lots 1 to 4 + road          Runoff Area=3,718.5 m2    0.00% Impervious   Runoff Depth=29 mm
                                                         Tc=6.0 min     C=O.84    Runoff=0.15029 m3/s 0.109 MI


Reach 2R: (new Reach)                                                             Inflow=O.OOOOO m3/s 0.000 MI
                                                                                 Outflow=O.OOOOO m3/s 0.000 MI


Reach 3R: (new Reach)                                                             Inflow=0.12799 m3/s 0.110 MI
                                                                                 Outflow=0.12799 m3/s 0.110 MI


Pond 2P: 47sqm Bioretention           Peak Elev=102.201 m   Storage=0.011 MI Inflow=0.15029 m3/s 0.109 MI
           Primary=O.OOOOO m3/s 0.000 MI    Secondary=0.12799 m3/s 0.110 MI Outflow=0.12799 m3/s 0.110 MI

           Total Runoff Area = 0.3719 ha      Runoff Volume = 0.109 MI      Average Runoff Depth 29 mm
                                                                                                     =


                                           100.00% Pervious   =   0.3719 ha  0.00% Impervious = 0.0000 ha

Page 49

Post DEVELOPMENT Q10Cooroy stg 1 noosa 10-Year Duration=10 min, Inten=173.2 mrnlhr
Prepared by {enter your company name here}                                                    Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                                          Page 7

                            Summary for Subcatchment 2S: lots 1 to 4 + road

Runoff          =       0.15029 [email protected] hrs, Volume=            0.109 MI, Depth= 29 mm


Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year Duration=10 min, Inten=173.2 mm/hr



          Area (m2)         C   Description
              3718.5     0.84   road+lots
              3,718.5           100.00% Pervious Area


         Tc     Length     Slope Velocity       Capacity   Description
  (min) (meters)           (m/m) (m/sec)          (m3/s)
    6.0                                                    Direct Entry, lots+road


                                    Subcatchment 2S: lots 1 to 4 + road

                                            Hydrograph
                                                                                                 II Runoff~


  -
   III
  ;:;-
   E
  -




   ~
  u:::
                                                                                     C=O.84




                                            1                      2                      3
                                                 Time   (hours)

Page 50

Post DEVELOPMENT Q10Cooroy stg 1 noosa 10-Year Duration=10 min, Inten=173.2 mrn/hr
Prepared by {enter your company name here}                                          Printed 19/04/2013
HydroCAD<ID 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                                 Page 8

                             Summary for Reach 2R: (new Reach)

[40]Hint: Not Described (Outflow=lnflow)

Inflow Area =       0.3719 ha,   0.00% Impervious, Inflow Depth =    0 mm     for 10-Year event
Inflow        =   0.00000 [email protected] hrs, Volume=       0.000 MI
Outflow       =   0.00000 [email protected] hrs, Volume=       0.000 MI, Atten= 0%, Lag= 0.0 min


Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs

                                         Reach 2R: (new Reach)

                                       Hydrograph
                                                                                       I Inflow
          1
                                                                                       IOutflow
                                                      Inflow              3719 ha




  -

   I/)
  ;;-
   E
  -



   :t
   o
  u::




              o                    1                       2                   3
                                         Time   (hours)

Page 51

..
     Post DEVELOPMENT Q10Cooroy stg 1 noosa 10-Year Duration=10 min, Inten=173.2 mmlhr
     Prepared by {enter your company name here}                                      Printed 19/04/2013
     HydroCA[)@ 10.00 sin 05328 @2011 HydroCAD Software Solutions LLC                            Page 9

                                  Summary for Reach 3R: (new Reach)

     [40]Hint: Not Described (Outflow=lnflow)

     Inflow    =     0.12799 [email protected] hrs, Volume=         0.110 MI
     Outflow   =     0.12799 [email protected] hrs, Volume=         0.110 MI, Atten= 0%, Lag= 0.0 min


     Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs

                                           Reach 3R: (new Reach)

                                       Hydrograph
                                                                                         I Inflow
                                                                                         IOutflow




       -



       ~
        E
       -




        ~
       i:L




                 o                     1                    2                    3
                                           Time   (hours)

Page 52

Post DEVELOPMENT Q10Cooroy stg 1 noosa 10-Year Duration=10 min, Inten=173.2 mmlhr
Prepared by {enter your company name here}                                                    Printed 19/04/2013
HydroCAD<ID 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC                                      Page 10

                            Summary for Pond 2P: 47sqm Bioretention

Inflow Area =         0.3719 ha,      0.00% Impervious, Inflow Depth = 29 mm         for 10-Year event
Inflow      =     0.15029 [email protected] hrs, Volume=          0.109 MI
Outflow     =     0.12799 [email protected] hrs, Volume=          0.110 MI, Atten= 15%, Lag= 5.5 min
Primary     =     0.00000 [email protected] hrs, Volume=          0.000 MI
Secondary   =     0.12799 [email protected] hrs, Volume=          0.110 MI


Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs 1 2
Peak Elev= 102.201 [email protected] hrs Surf.Area= 0.0047 ha Storage= 0.011 MI


Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 0.8 min (10.1    9.3 )
                                             -




Volume          Invert   Avail.Storage     Storage Description
  #1      101.900 m           0.029 MI     4.00 mWx 6.25 mL x 0.60 mH Prismatoid Z=3.0


Device    Routing            Invert    Outlet Devices
   #1     Primary        102.300 m     90.0 deg x 1.00 m long x 0.20 m rise Sharp-Crested VeelTrap Weir
                                       Cv= 1.38 (C=1.72)
   #2     Secondary 101.150 m          225 mm Round Device 1
                                       L= 5.00 m   RCP, groove end w/headwall, Ke= 0.200
                                       Inlet! Outlet Invert= 101.150 m 1 101.100 m    S= 0.0100 m/m      Cc=
                                       0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.040 m2
   #3     Device 1       102.200 m     450 mm x 450 mm Horiz. Orifice/Grate       C= 0.600
                                       Limited to weir flow at low heads


Primary OutFlow Max=O.OOOOO [email protected] hrs HW=1 01.900 m                  (Free Discharge)
’t_1=Sharp-Crested VeelTrap Weir (Controls 0.00000 m3/s)
   ’t_3=Orifice/Grate (Controls 0.00000 m3/s)

Secondary OutFlow Max=0.12795 [email protected] hrs HW=102.201 m                   (Free Discharge)
’t_2=Device 1 (Inlet Controls 0.12795 [email protected] m/s)

Page 53

Post DEVELOPMENT Q10Cooroy stg 1 noosa 10-Year Duration=10 min, Inten=173.2 mmlhr
Prepared by {enter your company name here}                            Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                 Page 11

                                  Pond 2P: 47sqm Bioretention

                                  Hydrograph
                                                                      . Inflow
                                                                      o Outflow
                                                                      . Primary
                                                                      . Secondary

  -



  ~
   E
  -




   ~
   o
  u:::




           o                  1                     2             3
                                   Time   (hours)

Page 54

              existing road reserve
                 catchment area




       o
lots 1 to 4 less roof+dve
                                                                                         ~
                                                                                     (new Reach)

               o
       Existing roof+drive area




   eB~~                               Routing Diagram for PRE DEVELOPMENT Q100 Cooroy stg 1 4 lots
                                        Prepared by {enter your company name here}, Printed 19/0412013
                                        [email protected] sin 05328 @2011 HydroCAD Software Solutions LLC

Page 55

PRE DEVELOPMENT Q100 Cooroy stg 1 4 lots
Prepared by {enter your company name here}                          Printed 19/04/2013
HydroCAOO 10.00 sin 05328 @2011 HydroCAD Software Solutions LLC                Page 2

                                         Area Listing (all nodes)


           Area      C     Description
      (hectares)           (subcatchment-numbers)
         0.2195    0.88    LIGHT GRASS ON clay      (2S)
         0.0276    0.90   existing roof+DVE (5S)
         0.1248    1.00    ROAD+VERGE        (6S)
         0.3719    0.92    TOTAL AREA

Page 56

PRE DEVELOPMENT Q100 Cooroy stg 1 4 lots
Prepared by {enter your company name here}                        Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC              Page 3

                                     Soil Listing (all nodes)

           Area    Soil      Subcatchment

      (hectares)   Group     Numbers

         0.0000    HSGA
         0.0000    HSGB
         0.0000    HSGC
         0.0000    HSGD
         0.3719    Other     2S, 5S, 6S
         0.3719              TOTAL AREA

Page 57

PRE DEVELOPMENT Q100 Cooroy stg 1 4 lots
Prepared by {enter your company name here}                                                Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                                      Page 4

                                       Ground Covers (all nodes)


     HSG-A        HSG-B        HSG-C        HSG-D          Other        Total    Ground                 Subcatchment

   (hectares)   (hectares)   (hectares)   (hectares)   (hectares)   (hectares)   Cover                  Numbers

     0.0000       0.0000       0.0000       0.0000       0.2195       0.2195     LIGHT GRASS ON clay 2S
     0.0000       0.0000       0.0000       0.0000       0.1248       0.1248     ROAD+VERGE            6S
     0.0000       0.0000       0.0000       0.0000       0.0276       0.0276     existing roof+DVE      5S

     0.0000       0.0000       0.0000       0.0000       0.3719       0.3719     TOTAL AREA

Page 58

 .




PRE DEVELOPMENT Q100 Cooroy stg               noosa 100-Year        Duration=6 min, Inten=301.0 mmlhr
Prepared by {enter your company name here}                                              Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC                                        Page 5

                          Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
                          Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
                Reach routing by Stor-Ind method   Pond routing by Stor-Ind method
                                                   -




5ubcatchment 25: lots 1 to 4 less          Runoff Area=2,195.0 m2    0.00% Impervious   Runoff Depth=21 mm
                                                       Tc=10.0 min    C=0.88    Runoff=0.09704 m3/s 0.047 MI


5ubcatchment 55: Existing roof+drive area Runoff Area=276.0 m2 0.00% Impervious         Runoff Depth=37 mm
                                                        Tc=6.0 min    C=0.90    Runoff=0.02080 m3/s 0.010 MI


5ubcatchment 65: existing road         Runoff Area=1,247.5 m2     100.00% Impervious    Runoff Depth=41 mm
                                                        Tc=6.0 min    C=1.00    Runoff=O.1 0445 m3/s 0.051 MI


Reach 4R: (new Reach)                                                           Inflow=0.22229 m3/s 0.108 MI
                                                                               Outflow=0.22229 m3/s 0.108 MI


           Total Runoff Area = 0.3719 ha   Runoff Volume = 0.108 MI       Average Runoff Depth 29 mm=


                                      66.45% Pervious     =   0.2471 ha   33.55% Impervious 0.1248 ha
                                                                                                =

Page 59

PRE DEVELOPMENT Q100 Cooroy stg                     noosa 100-Year    Duration=6 min, Inten=301.0 mmlhr
Prepared by {enter your company name here}                                             Printed 19/04/2013
                           2011 HydroCAD Software Solutions LLC
HydroCA[)@ 10.00 sIn 05328 (                                                                      Page 6

                       Summary for Subcatchment 2S: lots 1 to 4 less roof+dve

[48]Hint: Peak<CiA due to short duration

Runoff        =       0.09704 [email protected] hrs, Volume=             0.047 MI, Depth= 21 mm


Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 100-Year        Duration=6 min, Inten=301.0 mm/hr


         Area (m2)        C   Description
            2,195.0    0.88   LIGHT GRASS ON clay
            2,195.0           100.00% Pervious Area


       Tc     Length     Slope Velocity     Capacity   Description
  (min) (meters)         (m/m) (m/sec)        (m3/s)
   10.0                                                Direct Entry, GRASS OVER clay


                              Subcatchment 2S: lots 1 to 4 less roof+dve

                                        Hydrograph
                                                                                          II Runoff~


  -
   I/)
  ;;-
   E
  -




  .~
   o
  Li:




                                       1                       2                     3
                                             Time   (hours)

Page 60

PRE DEVELOPMENT Q100 Cooroy stg                    noosa 100-Year         Duration=6 min, Inten=301.0 mmlhr
Prepared by {enter your company name here}                                                 Printed 19/04/2013
HydroCAD<ID 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                                     Page 7

                      Summary for Subcatchment 55: Existing roof+drive area

Runoff      =       0.02080 [email protected] hrs, Volume=                  0.010 MI, Depth= 37 mm


Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 100-Year Duration=6 min, Inten=301.0 mm/hr


        Area (m2)       C    Description
            276.0     0.90   existing roof+DVE
            276.0            100.00% Pervious Area


       Tc   Length      Slope Velocity       Capacity    Description
  (min) (meters)        (m/m) (m/sec)          (m3/s)
    5.0                                                  Direct Entry, existing roof
    5.0         0.0    Total, Increased to minimum Tc      =   6.0 min


                             Subcatchment 55: Existing roof+drive area

                                      Hydrograph
                                                                                              II Runoff~


  -


  ~
   E
  -




   ~
   o
  LL




                o                        1                          2                     3
                                               Time     (hours)

Page 61

PRE DEVELOPMENT Q100 Cooroy stg noosa 100-Year Duration=6 min, Inten=301.0 mm/hr
Prepared by {enter your company name here}                                                Printed 19/04/2013
HydroCAOO 10.00 sin 05328 @ 2011 HydroCAD Software Solutions LLC                                     Page 8

               Summary for 5ubcatchment 65: existing road reserve catchment area

Runoff          =       0.10445 [email protected] hrs, Volume=             0.051 MI, Depth= 41 mm


Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 100-Year Duration=6 min, Inten=301.0 mm/hr



          Area (m2)         C   Description
              1 247.5    1.00   ROAD+VERGE
              1,247.5           100.00% Impervious Area


         Tc     Length     Slope Velocity     Capacity   Description
  (min) (meters)           (m/m) (m/sec)        (m3/s)
    6.0                                                  Direct Entry, road +verge+conc footpath


                         5ubcatchment 65: existing road reserve catchment area

                                          Hydrograph
                                                                                             II Runoff~


  -
   I/)
  ;:0-
   S
  -




   3:
   o
  u:::
                                                                                 C=1.00




                 o                       1                       2                     3
                                               Time   (hours)

Page 62

PRE DEVELOPMENT Q100 Cooroy stg noosa 100-Year Durafion=6 min, Infen=301.0 mm/hr
Prepared by {enter your company name here}                                        Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                               Page 9

                             Summary for Reach 4R: (new Reach)

[40]Hint: Not Described (Outflow=lnflow)

Inflow Area =      0.3719 ha, 33.55% Impervious, Inflow Depth =      29 mm   for 100-Year event
Inflow    =     0.22229 [email protected] hrs, Volume=          0.108 MI
Outflow   =     0.22229 [email protected] hrs, Volume=          0.108 MI, Atten= 0%, Lag= 0.0 min


Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs

                                      Reach 4R: (new Reach)

                                  Hydrograph
                                                                                      IInflow
                                                                                      IOutflow




   ~
   o
  u:::




            o                     1                     2                     3
                                       Time   (hours)

Page 63

    o
lots 1 to 4 + road




                         M        .....
                                                                                                                                                       ~
                                          .....
                                                  .....
                                                          .....
                     47sqm Bioretention                           .....                                                                              (new Reach)
                                                                          .....
                                                                                  .....
                                                                                          .....
                                                                                                  .....
                                                                                                          .....
                                                                                                                  .....
                                                                                                                          .....
                                                                                                                                  .....
                                                                                                                                          .....




                                                                                                                                                    ~
                                                                                                                                                  (new Reach)




eB                   ~         Routing Diagram for Post DEVELOPMENT Q100Cooroy stg 1 4 lots
                                 Prepared by {enter your company name here}, Printed 19/0412013
                                  [email protected] sin 05328 @2011 HydroCAD Software Solutions LLC

Page 64

Post DEVELOPMENT Q100Cooroy stg 1 4 lots
Prepared by {enter your company name here}                          Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                Page 2

                                         Area Listing (all nodes)


           Area      C     Description
      (hectares)           (subcatchment-numbers)
         0.3719    1.00    road+lots   (2S)
         0.3719    1.00    TOTAL AREA

Page 65

Post DEVELOPMENT Q100Cooroy stg 1 4 lots
Prepared by {enter your company name here}                        Printed 19/04/2013
HydroCAOO 10.00 sin 05328 @2011 HydroCAD Software Solutions LLC              Page 3

                                     Soil Listing (all nodes)

           Area    Soil      Subcatchment

      (hectares)   Group     Numbers

         0.0000    HSGA
         0.0000    HSGB
         0.0000    HSGC
         0.0000    HSGD
         0.3719    Other     2S
         0.3719              TOTAL AREA

Page 66

Post DEVELOPMENT Q100Cooroy stg 1 4 lots
Prepared by {enter your company name here}                                                Printed 19/04/2013
HydroCAOO 10.00 sin 05328 @2011 HydroCAD Software Solutions LLC                                      Page 4

                                       Ground Covers (all nodes)

     HSG-A        HSG-B        HSG-C        HSG-D          Other        Total    Ground         Subcatchment

   (hectares)   (hectares)   (hectares)   (hectares)   (hectares)   (hectares)   Cover          Numbers

     0.0000       0.0000       0.0000       0.0000       0.3719       0.3719     road+lots     2S
     0.0000       0.0000       0.0000       0.0000       0.3719       0.3719     TOTAL
                                                                                 AREA

Page 67

Post DEVELOPMENT Q100Cooroy stg 1 4 lots
Prepared by {enter your company name here}                                             Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                                     Page 5

                                        Pipe Listing (all nodes)

  Line#   Node       In-Invert   Out-Invert    Length    Slope       n    DiamlWidth   Height   Inside-Fill

          Number    (meters)      (meters)    (meters)   (m/m)                 (mm)     (mm)        (mm)
          2P         101.150      101.100        5.00    0.0100   0.010         225        0             0

Page 68

       .




Post DEVELOPMENT Q100Cooroy st                 noosa 100-Year        Duration=10 min, Inten=250.8 mmlhr
Prepared by {enter your company name here}                                                Printed 19/04/2013
HydroCAD<ID 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                                         Page 6

                           Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
                           Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
                 Reach routing by Stor-Ind method     -
                                                          Pond routing by Stor-Ind method


5ubcatchment 25: lots 1 to 4 + road        Runoff Area=3,718.5 m2    100.00% Impervious   Runoff Depth=51 mm
                                                           Tc=6.0 min   C=1.00    Runoff=0.25908 m3/s 0.188 MI


Reach 2R: (new Reach)                                                             Inflow=0.08122 m3/s 0.030 MI
                                                                                 Outflow=0.08122 m3/s 0.030 MI


Reach 3R: (new Reach)                                                             Inflow=0.15147 m3/s 0.158 MI
                                                                                 Outflow=0.15147 m3/s 0.158 MI


Pond 2P: 47sqm Bioretention           Peak Elev=102.578 m   Storage=0.035 MI Inflow=0.25908 m3/s 0.188 MI
           Primary=0.08122 m3/s 0.030 MI    Secondary=0.15147 m3/s 0.158 MI Outflow=0.23270 m3/s 0.188 MI

           Total Runoff Area = 0.3719 ha      Runoff Volume = 0.188 MI      Average Runoff Depth 51 mm=


                                           0.00% Pervious   =   0.0000 ha   100.00% Impervious 0.3719 ha
                                                                                                  =

Page 69

    "               .




.

    Post DEVELOPMENT Q100Cooroy st                           noosa 100-Year       Duration=10 min, Inten=250.8 mm/hr
    Prepared by {enter your company name here}                                                        Printed 19/04/2013
    HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                                              Page 7

                                    Summary for Subcatchment 25: lots 1 to 4 + road

    Runoff              =     0.25908 [email protected] hrs, Volume=            0.188 MI, Depth= 51 mm


    Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
    noosa 100-Year            Duration=10 min, Inten=250.8 mm/hr


                Area (m2)          C    Description
                    3,718.5      1.00   road+lots
                    3,718.5             100.00% Impervious Area


               Tc       Length     Slope Velocity       Capacity   Description
     (min) (meters)               (m/m) (m/sec)           (m3/s)
          6.0                                                      Direct Entry, lots+road


                                            Subcatchment 25: lots 1 to 4 + road

                                                    Hydrograph
                                                                                                         II Runoff~
                                                                                  noosa         ear

                                                                                 Duration=10 min,


        -

         I/)
        ;:;-
         E
        -




         ~
        Li:
                                                                                             C=1.00




                         o                          1                      2                      3
                                                         Time   (hours)

Page 70

    ...




.
    Post DEVELOPMENT Q100Cooroy st                 noosa 100-Year   Duration=10 min, Inten=250.8 mm/hr
    Prepared by {enter your company name here}                                         Printed 19/04/2013
    HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC                                Page 8

                                 Summary for Reach 2R: (new Reach)

    [401 Hint: Not Described (Outflow=lnflow)

    Inflow Area =      0.3719 ha,1 00.00% Impervious, Inflow Depth =      8 mm    for 100-Year event
    Inflow       =   0.08122 [email protected] hrs, Volume=            0.030 MI
    Outflow      =   0.08122 [email protected] hrs, Volume=            0.030 MI, Atlen= 0%, Lag= 0.0 min


    Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs

                                           Reach 2R: (new Reach)

                                       Hydrograph
                                                                                           I Inflow
                                                                    Area=O.3719 ha
                                                                                           IOutflow




          -

          1/1
          ;:;-
          E
          -




           ~
          o
          u:::




                                       1                     2                     3
                                            Time   (hours)

Page 71

              \~

     ..




.
    Post DEVELOPMENT Q100Cooroy st                  noosa 100-Year   Duration=10 min, Inten=250.8 mmlhr
    Prepared by {enter    your company name     here}                                   Printed 19/04/2013
    HydroCA[)@ 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC                               Page 9

                                  Summary for Reach 3R: (new Reach)

    [401 Hint: Not Described (Outflow=lnflow)

    Inflow         =   0.15147 [email protected] hrs, Volume=            0.158 MI
    Outflow        =   0.15147 [email protected] hrs, Volume=            0.158 MI, Atten= 0%, Lag= 0.0 min


    Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs

                                            Reach 3R: (new Reach)

                                        Hydrograph
                                                                                            I Inflow
                                                                                            IOutflow




      -



      ~
          E
      -




          ~
      u:




                   o                    1                     2                     3
                                             Time   (hours)

Page 72

    ~        ..

        .




~

    Post DEVELOPMENT Q100Cooroy st                       noosa 100-Year   Duration=10 min, Inten=250.8 mm/hr
    Prepared by {enter your company name here}                                                  Printed 19/04/2013
    HydroCAOO 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC                                       Page 10

                                   Summary for Pond 2P: 47sqm Bioretention

    Inflow Area =             0.3719 ha,100.00% Impervious, Inflow Depth = 51 mm           for 100-Year event
    Inflow         =     0.25908 [email protected] hrs, Volume=           0.188 MI
    Outflow        =     0.23270 [email protected] hrs, Volume=            0.188 MI, Atten= 10%, Lag= 5.1 min
    Primary        -     0.08122 [email protected] hrs, Volume=           0.030 MI
    Secondary      =     0.15147 [email protected] hrs, Volume=           0.158 MI


    Routing by Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs 1 2
    Peak Elev= 102.578 [email protected] hrs   Surf.Area= 0.0083 ha Storage= 0.035 MI


    Plug-Flow detention time= 2.0 min calculated for 0.187 MI (100%of inflow)
    Center-of-Mass det. time= 2.0 min (11.3   9.3 )-




    Volume             Invert   Avail.Storage    Storage Description
        #1        101.900 m          0.037 MI    4.00 mWx 6.25 mL x 0.70 mH Prismatoid Z=3.0


    Device        Routing           Invert   Outlet Devices
        #1        Primary       102.300 m    90.0 deg x 0.10 m long x 0.30 m rise Sharp-Crested VeelTrap Weir
                                             Cv= 1.38 (C= 1.72)
        #2        Secondary     101.150 m    225 mm Round Device 1
                                             L= 5.00 m     RCP, groove end w/headwall, Ke= 0.200
                                             Inlet 1 Outlet Invert= 101.150 m 1 101.100 m S= 0.0100 m/m Cc=
                                             0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.040 m2
        #3        Device 1      102.200 m    600 mm x 600 mm Horiz. Orifice/Grate       C= 0.600
                                             Limited to weir flow at low heads


    Primary OutFlow Max=0.08062 [email protected] hrs HW=102.577 m                     (Free Discharge)
    L1=Sharp-Crested VeelTrap Weir (Weir Controls 0.08062 [email protected] m/s)
        L3=Orifice/Grate (Passes 0.08062 m3/s of 0.50319 m3/s potential flow)

    Secondary OutFlow Max=0.15142 [email protected] hrs HW=102.577 m                     (Free Discharge)
    L2=Device 1 (Inlet Controls 0.15142 [email protected] m/s)

Page 73

     ....   ..     I   .

            .



..

     Post DEVELOPMENT Q100Cooroy st               noosa 100-Year   Duration =10 min, Inten=250.8 mrnlhr
     Prepared by {enter your company name here}                                      Printed 19/04/2013
     HydroCAOO 10.00 sin 05328 @2011 HydroCAD Software Solutions LLC                           Page 11

                                       Pond 2P: 47sqm Bioretention

                                       Hydrograph
                                                                                    .  Inflow
                                                                                    D  Outflow
                                                                                    .  Primary
                                                                                    CJ Secondary


            -
            en
            ;:;-
            E
            -




             ~
            o
            u::




                           o       1                     2               3
                                        Time   (hours)

Used in these records

About this file

File size
27.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT - REC13_0015.pdf · 27.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.