Council archive · source document
Referenced Document - REC13/0015
Very large file (27.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
’
.
~
Callaghan & Toth
4.3.2 Assessment of Results
The developed site has been modelled as a series of Urban sub-catchments, which incorporate
Water Sensitive Urban Design (WSUD)treatment trains. Plan No 02 shows the proposed
locations of the bio-retention basin. The reductions listed in Section 4.3.1 above comply with
Council’s requirements. Therefore, it is considered that the proposed stormwater treatment
system is currently sufficient to reduce the pollutants prior to exiting the site.
12
55 Lake MacDonalld Drive Stage I
-
SMP Rev l.doc May 2013 1225
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 27.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.