Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Referenced Document - REC13/0015

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (27.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                              BIORETENTION SYSTEMS
             -
                                                                                                                     ~




                                                                      DESIGN PHASE


Objective        To design low maintenance effective stormwater treatment devices to achieve a no-worsening result over the existing pre-development
                 situation in the creeks adjacent the site.



                 Description                                                                                        Responsibility    Timeframe


Actions          Consulting Engineer to design Bioretention Systems in accordance with:                             Design Engineer   During design
                     ~   Bioretention Systems requirements as outlined in the "Water by Design                                        process
                                                                                                 -
                                                                                                     Construction
                         and Establishment Guidelines" Version 1 dated February 2009 prepared by Healthy
                         Waterways
                     ~   Calculations as per BBC Water Sensitive Road Design Guidelines.

                 Consulting Engineer is to ensure that the Bio-Retention Zones are:
                     ~   located in a suitable area,

                     ~   sized according to guidelines,

                     ~   provided with the appropriate construction materials, subsoil drainage and outlet pipe,
                         and

                     ~   incorporated into a stormwater treatment system also including gross pollutant traps,
                         sediment traps, oil traps, detention storages, etc.


Monitoring       Consulting Engineer to ensure that operational works drawings reflect requirements of this         Design Engineer   During design
                 Stormwater Quality Management & Assessment Report.                                                                   process


Reporting        Consulting Engineer to provide Stormwater Quality Management & Assessment Report with              Design Engineer   As required
                 Operational Works application.
                 Design Engineer to provide Operational Works drawings in accordance with requirements.
                 Council is to review the Operational Works Plan and provide relevant documentation relating to
                 application.

Used in these records

About this file

File size
27.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT - REC13_0015.pdf · 27.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.