Following 24   Remove temporary cover of geotextile, topsoil and turf following:                                      Contractor         Following On-
month                                                                                                                                    maintenance or
                     .
                         Acceptance of bioretention systems on maintenance, or                                                           80% completion of
protection
period               .   80% completion of building works upstream of bioretention systems.                                              building works.
               Plant approved plantings into bioretention systems as per construction drawings.

               Contractor to conduct regular watering of all planted bio-retention systems until such time as
               plants are established.
               Maintain bioretention system for a minimum period of 12 months, until system is accepted Off-
               Maintenance.


Monitoring     Hold point   -
                             once bioretention basin   underdrainage pipe work is installed   -

                                                                                                  inspection with     Contractor and     Following
               Council to ensure in accordance with design.                                                           Council            underdrainage
                                                                                                                                         pipe work
               Sample drainage layer, transition layer, filtration media materials must be stockpiled on-site and
                                                                                                                                         installation
               certification that the filtration media complies with guidelines.

               The Contractor will carry out weekly inspections of the Bio-Retention Systems (Including during
                                                                                                                      Contractor
               the defects liability period). The following will be examined at each inspection:                                         Weekly
               );>   Sediment build up on the surface
               );>   Health of vegetation
               );>   Pondage during major storms not infiltrating into the sand
               );>   Erosion at the outlet
               );>   Pondage during minor storms
               One month after installation of plants in bioretention system:                                         Contractor
                                                                                                                                         One month after
               );>   Field test hydraulic conductivity in accordance with FAWB guidelines.                                               installation


Reporting      );>   Contractor to maintain a log of inspections, watering and other actions.                         );>   Contractor   );>   As required

               );>   Records are to be logged and kept for verification of compliance on a need basis.

               );>   Bio-retention designer I Engineer shall perform inspections during construction stage and fill
                     out Water by Design forms for compliance.

Used in these records

About this file

File size
27.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT - REC13_0015.pdf · 27.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.