Council archive · source document
Referenced Document - REC13/0015
Very large file (27.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
..
PRE DEVELOPMENT Q10 Cooroy stg 1 noosa 10-Year Duration=6 min, Inten=208.9 mrnlhr
Prepared by {enter your company name here} Printed 19/04/2013
HydroCAD<ID 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC Page 5
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
5ubcatchment 25: lots 1 to 4 less Runoff Area=2,195.0 m2 0.00% Impervious Runoff Depth=13 mm
Tc=10.0 min C=0.74 Runoff=0.05663 m3/s 0.027 MI
5ubcatchment 55: Existing roof+drive area Runoff Area=276.0 m2 0.00% Impervious Runoff Depth=25 mm
Tc=6.0 min C=0.90 Runoff=0.01443 m3/s 0.007 MI
5ubcatchment 65: existing road reserve Runoff Area=1 ,247.5 m2 0.00% Impervious Runoff Depth=24 mm
Tc=6.0 min C=0.86 Runoff=0.06234 m3/s 0.030 MI
Reach 4R: (new Reach) Inflow=0.13341 m3/s 0.065 MI
Outflow=0.13341 m3/s 0.065 MI
Total Runoff Area = 0.3719 ha Runoff Volume = 0.065 MI Average Runoff Depth = 17 mm
100.00% Pervious = 0.3719 ha 0.00% Impervious = 0.0000 ha
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 27.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.