Council archive · source document
Referenced Document - REC13/0015
Very large file (27.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Post DEVELOPMENT Q10Cooroy stg 1 noosa 10-Year Ouration=10 min, Inten=173.2 mrnlhr
Prepared by {enter your company name here} Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC Page 6
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method Pond routing by Stor-Ind method
-
8ubcatchment 28: lots 1 to 4 + road Runoff Area=3,718.5 m2 0.00% Impervious Runoff Depth=29 mm
Tc=6.0 min C=O.84 Runoff=0.15029 m3/s 0.109 MI
Reach 2R: (new Reach) Inflow=O.OOOOO m3/s 0.000 MI
Outflow=O.OOOOO m3/s 0.000 MI
Reach 3R: (new Reach) Inflow=0.12799 m3/s 0.110 MI
Outflow=0.12799 m3/s 0.110 MI
Pond 2P: 47sqm Bioretention Peak Elev=102.201 m Storage=0.011 MI Inflow=0.15029 m3/s 0.109 MI
Primary=O.OOOOO m3/s 0.000 MI Secondary=0.12799 m3/s 0.110 MI Outflow=0.12799 m3/s 0.110 MI
Total Runoff Area = 0.3719 ha Runoff Volume = 0.109 MI Average Runoff Depth 29 mm
=
100.00% Pervious = 0.3719 ha 0.00% Impervious = 0.0000 ha
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 27.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.