Council archive · source document
Referenced Document - REC13/0015
Very large file (27.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
.
PRE DEVELOPMENT Q100 Cooroy stg noosa 100-Year Duration=6 min, Inten=301.0 mmlhr
Prepared by {enter your company name here} Printed 19/04/2013
HydroCAOO 10.00 sIn 05328 @ 2011 HydroCAD Software Solutions LLC Page 5
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method Pond routing by Stor-Ind method
-
5ubcatchment 25: lots 1 to 4 less Runoff Area=2,195.0 m2 0.00% Impervious Runoff Depth=21 mm
Tc=10.0 min C=0.88 Runoff=0.09704 m3/s 0.047 MI
5ubcatchment 55: Existing roof+drive area Runoff Area=276.0 m2 0.00% Impervious Runoff Depth=37 mm
Tc=6.0 min C=0.90 Runoff=0.02080 m3/s 0.010 MI
5ubcatchment 65: existing road Runoff Area=1,247.5 m2 100.00% Impervious Runoff Depth=41 mm
Tc=6.0 min C=1.00 Runoff=O.1 0445 m3/s 0.051 MI
Reach 4R: (new Reach) Inflow=0.22229 m3/s 0.108 MI
Outflow=0.22229 m3/s 0.108 MI
Total Runoff Area = 0.3719 ha Runoff Volume = 0.108 MI Average Runoff Depth 29 mm=
66.45% Pervious = 0.2471 ha 33.55% Impervious 0.1248 ha
=
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 27.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.