Council archive · source document
Referenced Document - REC13/0015
Very large file (27.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
.
Post DEVELOPMENT Q100Cooroy st noosa 100-Year Duration=10 min, Inten=250.8 mmlhr
Prepared by {enter your company name here} Printed 19/04/2013
HydroCAD<ID 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC Page 6
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method -
Pond routing by Stor-Ind method
5ubcatchment 25: lots 1 to 4 + road Runoff Area=3,718.5 m2 100.00% Impervious Runoff Depth=51 mm
Tc=6.0 min C=1.00 Runoff=0.25908 m3/s 0.188 MI
Reach 2R: (new Reach) Inflow=0.08122 m3/s 0.030 MI
Outflow=0.08122 m3/s 0.030 MI
Reach 3R: (new Reach) Inflow=0.15147 m3/s 0.158 MI
Outflow=0.15147 m3/s 0.158 MI
Pond 2P: 47sqm Bioretention Peak Elev=102.578 m Storage=0.035 MI Inflow=0.25908 m3/s 0.188 MI
Primary=0.08122 m3/s 0.030 MI Secondary=0.15147 m3/s 0.158 MI Outflow=0.23270 m3/s 0.188 MI
Total Runoff Area = 0.3719 ha Runoff Volume = 0.188 MI Average Runoff Depth 51 mm=
0.00% Pervious = 0.0000 ha 100.00% Impervious 0.3719 ha
=
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - REC13/0015Related documentApplication case desk ↗
About this file
- File size
- 27.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.