Original source · versioned page text
Delegated Report - Code - Planning OPW21 0277
Author Development Engineer, Diogo Carrico Development Assessment APPLICATION DETAILS Application No. OPW21/0277 Applicant Auspower Connect Pty Ltd Proposal Operational Works – Electrical Reticulation Properly Made Date 28 September 2021 Information Request Date Not Applicable Information Response Date Not Applicable Decision Due Date 1 December 2021 Report Completed Date 15 October 2021 Report Reviewed By Mark Lewis PROPERTY DETAILS Property Address 18 Pearsons Rd Cooroy Qld 4563 RP Description Lot 5 RP 202304 Land Area 2000 m² Existing Use of Land Residential STATUTORY DETAILS SEQRP Designation Urban Footprint Zone Low Density Residential Precinct Not Applicable Local Plan Area Not Applicable Overlays None Assessment Type Code PROPOSAL The application seeks approval for Operational Works – Electrical Reticulation. The proposal plan is included below. Figure 1 – Site Plan site details Background Subject operational works application follows up on requirements of higher order Reconfiguration of a Lot approval RAL20/0028. The documentation submitted for the subject application is comprehensive and an information request was not required. Site Description Surrounding Land Uses assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2020 The following codes from the Noosa Plan 2020 are applicable to this development: Works Codes cONSULTATION Referral Agencies Not Applicable Internal Council Referrals Not applicable conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW21/0277 for Operational Works – Electrical Reticulation situated at 18 Pearsons Rd Cooroy Qld 4563 and described as Lot 5 RP 202304, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW21/0277 Street address: 18 Pearsons Rd Cooroy Qld 4563 Real property description: Lot 5 RP 202304 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works – Electrical Reticulation CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan Description Date Project No. S4400254 Sheet 1 of 2 A Electrical Reticulation Install 4m of 240 AL 4C LV & 1 LV Pillar Prepared by Auspower Connect Pty Ltd 23/09/2021 Project No. S4400254 Sheet 2 of 2 A Electrical Reticulation Install 4m of 240 AL 4C LV & 1 LV Pillar Prepared by Auspower Connect Pty Ltd 23/09/2021 Site Specific Condition Electrical conduits or other services proposed to be installed within existing and/or proposed road reserves under any existing road pavement, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Prior to Commencement of Construction Council must be advised of the appointment of a Principal Contractor in terms of the Work Health and Safety Act 2011. Any construction works to be undertaken in the vicinity of Public or Council's existing (on-maintenance or off-maintenance) infrastructure must not adversely affect the integrity of the infrastructure. Any damage to the external road pavement, pathway or any municipal infrastructure as a direct consequence of construction activities associated with this approval shall be remedied by the applicant at no cost to Council or to the service provider. The work site and the areas could be affected by the works must be photographed prior to any works commencing on the site and be submitted to Council. Electrical Reticulation Electrical reticulation works cannot commence until they are fully approved by Energex and a copy of the Energex approval has been submitted to Council. Electrical works must be coordinated with other civil works associated with development permit approval for Reconfiguring A Lot ref: RAL20/0028 and must not be in conflict with any existing or proposed infrastructures and services. Any electrical pillar or power pole must be located clear of the any water meters and Unitywater infrastructures in accordance with Unitywater and Energex guidelines. Any electrical pillar or power pole must has a minimum clearance of 1.0m from edge of roads and driveways unless approved otherwise in writing by Energex. General All works must be constructed and work procedure undertaken in accordance with: All the relevant codes and policies of The Noosa Plan, particularly PSP 6 – Engineering Design Standards; Provision of the Work Health and Safety Act and such other legislation as is applicable to workplace health and safety; The list of approved plans of this Decision Notice, the conditions of this Decision Notice and the relevant conditions of the higher order approval development permit approval for Reconfiguring A Lot ref: RAL20/0028 and any related relevant OPW approvals. Any conflict between the proposed works and any existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. All works associated with this permit approval must be carried out in a safe manner for the members of the public without adverse or undue impact on other properties or the users of the roads and pathways network, where required all traffic control signage must be in accordance with the Manual of Uniform Traffic Control Devices (MUTCD). The applicant must ensure sediment from the work site does not leave the site or ends into the street stormwater drainage system, watercourses and/or wetlands due surface runoff or on tyres of vehicles and/or machineries. It is essential to implement appropriate approved erosion and sediment control measures as may be necessary during all phases of works and that non-essential exposure of soil is prevented by restricting the extent of clearing and minimising the duration of soil exposure to adverse weather conditions. Disturbed areas must be stabilised without delay and prior to rainfall occurring. The supervising Consultant must ensure that the works have been inspected and confirm their acceptability and compliance with this permit and the relevant standards at the completion of the works. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Environmental Advisory Note The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 6 of 6 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image2.png (image text)] ayy at aie pase296773, fs} mDsse2e764) fore [Attachment: image3.png (image text)] ON Urtan Area Boundary © Lexa Pian Boundary OB Preciners . Zones Low Density Residential Medium Density Residential IMB High Density Residential Tourist Accommodation I Wej0r Cenvre Mm Distr Centre i Local Centre Neighbourhood Centre Low impactindustyy Medium impect Industry ll Recreation and Open Space i Environmental Management and Conservation Community Facies Im Innovation Rural I Pure! Residential CO) Bil community Fecities Latel Legend O & overiay Maps O & Local Government infrastructure Pian (LGIP) OB omer Pian Maps
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.