Original source · versioned page text
Minor Change Application Letter
As highlighted above, the proposal results in minor changes to the site layout and design to facilitate a safer and more functional parking arrangement for a Transport depot. The rearrangement of the bus parking plan and access arrangement has allowed for an additional two (2) bus charging spaces whilst not compromising the ability for safe access and manoeuvring throughout the site. Furthermore, the reduction in the width of the exit access driveway complies with Council standards for heavy duty vehicle crossings, as shown in Standard drawing RS-051. The exterior façade of Workshop and ancillary office will continue to achieve a high-quality industrial outcome, using concrete tilt panelling and aluminium batten screening to effectively respond to sub-tropical climactic conditions, maximising comfort and safety for staff. The proposed changes are consistent with intended planning outcomes, delivering an exterior façade consisting of muted environmental tones broken up by contrasting materiality and design elements. It is proposed that the Office and Workshop plan is reconfigured, resulting in a 40.7m2 reduction in the overall GFA. This reduction in GFA allows for an increase in the total landscaped area which will appropriately screen the proposed transformer enclosure along the Production Street frontage and soften the visual impact of the built form. Furthermore, the reconfiguration of the amended plans allows for an improved carpark arrangement, providing greater distinction between the staff and bus areas and a clearer pedestrian entrance, whilst retaining 26 car parking spaces. Refer to the revised Architectural Plans prepared by Tyson Design Studio provided in Attachment 4. The existing trees along the site frontage are required to be removed in order to facilitate the site layout of the development. The development provides sufficient replacement tree planting along the frontage. Refer to the Landscape Concept Plan prepared by Tyson Design Studio provided in Attachment 5. The proposed changes include the addition of one (1) additional bioretention basin in the southeast corner of the site. Please refer to the Addendum to Stormwater Management Plan and Civil Drawings prepared by ALTA in Attachment 6 and Attachment 7 for further detail. The Addendum to Stormwater Management Plan has been prepared to achieve compliance with Condition 25 of the existing development approval. 4.1 Amendments to Approved Drawings and Documents As a result of the changes proposed, Table 3 lists the applicable plans to be updated from this minor change application. For transparency, we have listed the amended plans to be included in the decision notice to ensure all drawings are captured. Table 3: Drawings and Documents Drawing Number Plan Date Plans / Drawings Site Plan – Roof Level A100 27/11/2023 Site Plan – Floor A101 27/11/2023 Site Plan – Floor Level A102 27/11/2023 Area Analysis Plan A103 27/11/2023 Office/Workshop Elevations (South and East) A300 27/11/2023 Office/Workshop Elevations (North and West) A301 27/11/2023 Bus Parking Elevations A302 27/11/2023 Bus Parking Elevations A303 27/11/2023 Office Section A304 27/11/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original