Council archive · source document
0015E256.001
Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Text sections not matched to the original PDF pages. See original document to check page numbers.
Beckmans Road Intersdection
2017 PM Peak Hour
Intersection ID:
Roundabout
Table S.15 - CAPACITY AND LEVEL OF SERVICE
Mov Mov Total Total Deg. Aver. LOS Longest Queue
No. Typ Flow Cap. of Delay 95% Back
(veh (veh Satn (vehs) (m)
/h) /h) (v/c) (sec)
South: South Approach
is 159 241 0.660 T3337 B aS 54
3 R 726 1102 0.659 19.6 B Tie G 54
885 0.660 18 .S B 7.6 54
a ES aa a )
East: East Approach
4.1L 877 760 1.154 296.9 F 185.4 L321
5: 2 977 846 1.155% 297.9 F 185.4 1321
1854 dsio5 297.4 F 185.4 1321 .
West: West Approach
it T 221 368 0.601 9.5 A 3.8 41
12 R 726 1208 0.601 16.2 B 5.8 41
947 0.601 14.6 B 5.8 41
ALL VEHICLES: 3686 1.155 L57 8 F 185.4 1321
Level of Service calculations are based on
average control delay including geometric delay (HCM criteria),
independent of the current delay definition used.
For the criteria, refer to the "Level of Service" topic in the
; aaSIDRA Output Guide or the Output section of the on-line help.
* Maximum v/c ratio, or critical green periods
--- End of aaSIDRA Output ---
H:\Work (Sunshine Coast) \50995 Bunnings Noosa DA2 RFI\SIDRA PM 2017\Beckmans.OUT
Produced by aaSIDRA 2.1.4.357
Copyright 2000-2004
Akcelik & Associates Pty Ltd
32See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E256.001.pdfRelated documentPublic source context ↗
Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.