Attachment 6- Amended Urban Design Report MCU12/0208
Very large file (193 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
LANDSCAPE OVERLAY
APPROACH INTENT CHARACTER
The site is primarily characterized by the existing native The landscape open space concept centres on a naturalistic The character and function of the landscape and open
woodland vegetation that exists both throughout the site landscape that best fits with the ecological values of the site space network has been considered to best meet the
and surrounding it. A large percentage of these areas will be and which also provides for the recreational needs of the resident’s recreational and social requirements. The network
retained as part of the generous open space system across residents. includes a range of spaces, facilities and places integral
the development. of the site’s natural landscape and which anticipates the
form and function of the residential estate’s street pattern
The categories of open space across the Noosa on Weyba and layout. An open space recreation strategy has been
OBJECTIVES
development will vary from Open Space Conservation considered along the following criteria and principles:
A series of landscape design objectives have been
to various Active Parks, see page 27 for the range of
considered as follows:
open space proposed throughout the Noosa on Weyba Active recreation areas including kick about spaces,
development, and their definitions. Open Space throughout To establish a landscape character/theme that is natural playgrounds and barbeque areas are to be sited within
Noosa on Weyba makes up 68% of the receive site area and endemic to the site in both appearance and physical close proximity to residential neighbourhoods and internal
(excluding the already committed 139.5ha of open forest
form to fit with the sites ecological values and natural main roads;
offered as “Send” land as defined in the BDOA), 28%f the
currently defined developable land, and 16% that open character;
Fenced off leash dog areas to be sited within Primary
space can be classified as “Active Park” open space, (as To integrate and soften proposed residential engineering Parks close to internal main roads and residential
defined in the Noosa Planning Scheme). Provisions for offset
and site infrastructure with the fabric of the site though neighbourhoods;
planting are identified within the “Ecological Assessment
Report” prepared by Cardno (September 2013). appropriate landscape solutions;
Important ecological zones to incur minimal activity/
The open space network has been designed integral of the To establish an open space network of community cultural disturbance and are to be treated/rehabilitated
urban master planning process and carefully considers the parks and multi- functional green spaces that meets the primarily as habitat conservation zones in accordance
public open space requirements under the Noosa Planning recreational needs and requirements of the residential with authority planning controls;
Scheme, plus the environmental and ecological constraints population and which best fits with the site’s biodiversity
outlined in the Ecological Assessment Report. Intensive landscape activity areas/treatments are to be
and habitat;
sited in existing clearings and in areas of low ecological
However it has also been recognised that the project is to be
To establish a network of pedestrian and bicycle links significance;
developed under a Community Title Scheme (CTS) which has
allowed the allocation of Active Park areas to be designed internal and external to the site;
Existing native trees regardless of location within open Provide Active Park spaces that provide necessary
with some flexibility given that these parks will be owned and recreational facilities within the natural character of
To meet the landscape and ecological constraints and spaces zones are to be retained where possible and
maintained by the Body Corporate the site and its context
potentials of the site; recreational facilities and spaces are to be sited in
The open space network features a wide range of inter- amongst existing trees;
connected recreation and landscape spaces including local To rehabilitate and regenerate degraded ecological/
parks, plaza, lakefront parks, linear parks, corridors/buffers habitat zones; Promote the sites biodiversity importance as an integral
and general multi- functional green spaces. Each category part of the sites recreation and learning programme
To establish an attractive and functional public realm
of open space offers a different character and amenity to through environmental interpretative signage and
maximise recreational diversity and landscape experience. including streets, recreational places and spaces that is
educational information panels; and
natural in character and of the place;
Existing degraded or previously cleared areas of the site
Recognise the various asset protection zones and
defined as open space will be rehabilitated with endemic To generate a strong natural landscape identity/image for
planting in accordance with recommendations outlined in facilitate the appropriate movement of emergency
the development that best fits with the natural character
the Ecological Assessment Report, Koala Impact and Net vehicles throughout the site for bushfire management
of the site and its surrounds; and
Benefit Assessment Report and Bushfire Asessment Report, in purposes.
order to improve the sites natural environment qualities and To recognise and respect the various asset protection
connectivity to adjacent national parks and nature reserves. zones and to provide landscaping solutions which do not
compromise the function of these areas.
A community that values the natural ecology of
the site and embraces native fauna and flora
26 URBAN DESIGN REPORT
P:\NORT0001_LAKE WEYBA\B_DOCUMENTATION\B1_PRODUCTION\B4_REPORTS\PRELIMINARY APPROVAL - URBAN DESIGN REPORT
[OCR of page images]
LANDSCAPE OVERLAY
APPROACH
The site is primarily characterized by the existing native
woodland vegetation that exists both throughout the site
and surrounding it. A large percentage of these areas will be
retained as part of the generous open space system across
the development.
The categories of open space across the Noosa on Weyba
development will vary from Open Space Conservation
to various Active Parks, see page 27 for the range of
open space proposed throughout the Noosa on Weyba
development, and their definitions. Open Space throughout
Noosa on Weyba makes up 68% of the receive site area
(excluding the already committed 139.5ha of open forest
offered as “Send” land as defined in the BDOA), 28%f the
currently defined developable land, and 16% that open
space can be classified as “Active Park” open space, (as
defined in the Noosa Planning Scheme). Provisions for offset
planting are identified within the “Ecological Assessment
Report” prepared by Cardno (September 2013).
The open space network has been designed integral of the
urban master planning process and carefully considers the
public open space requirements under the Noosa Planning
Scheme, plus the environmental and ecological constraints
outlined in the Ecological Assessment Report.
However it has also been recognised that the project is to be
developed under a Community Title Scheme (CTS) which has
allowed the allocation of Active Park areas to be designed
with some flexibility given that these parks will be owned and
maintained by the Body Corporate
The open space network features a wide range of inter-
connected recreation and landscape spaces including local
parks, plaza, lakefront parks, linear parks, corridors/buffers
and general multi- functional green spaces. Each category
of open space offers a different character and amenity to
maximise recreational diversity and landscape experience.
Existing degraded or previously cleared areas of the site
defined as open space will be rehabilitated with endemic
planting in accordance with recommendations outlined in
the Ecological Assessment Report, Koala Impact and Net
Benefit Assessment Report and Bushfire Asessment Report, in
order to improve the sites natural environment qualities and
connectivity to adjacent national parks and nature reserves.
26 URBAN DESIGN REPORT
INTENT
The landscape open space concept centres on a naturalistic
landscape that best fits with the ecological values of the site
and which also provides for the recreational needs of the
residents.
OBJECTIVES
Aseries of landscape design objectives have been
considered as follows:
= To establish a landscape character/theme that is natural
and endemic to the site in both appearance and physical
form to fit with the sites ecological values and natural
character;
* To integrate and soften proposed residential engineering
and site infrastructure with the fabric of the site though
appropriate landscape solutions;
* To establish an open space network of community
parks and multi- functional green spaces that meets the
recreational needs and requirements of the residential
population and which best fits with the site’s biodiversity
and habitat;
* To establish a network of pedestrian and bicycle links
internal and external to the site;
= To meet the landscape and ecological constraints and
potentials of the site;
* To rehabilitate and regenerate degraded ecological/
habitat zones;
* To establish an attractive and functional public realm
including streets, recreational places and spaces that is
natural in character and of the place;
= To generate a strong natural landscape identity/image for
the development that best fits with the natural character
of the site and its surrounds; and
* To recognise and respect the various asset protection
zones and to provide landscaping solutions which do not
compromise the function of these areas.
P:\NORTOOO1_LAKE WEYBA\B_DOCUMENTATION\B1_PRODUCTION\B4_REPORTS\PRELIMINARY APPROVAL - URBAN DESIGN REPORT
CHARACTER
The character and function of the landscape and open
space network has been considered to best meet the
resident's recreational and social requirements. The network
includes a range of spaces, facilities and places integral
of the site's natural landscape and which anticipates the
form and function of the residential estate's street pattern
and layout. An open space recreation strategy has been
considered along the following criteria and principles:
= Active recreation areas including kick about spaces,
playgrounds and barbeque areas are to be sited within
close proximity to residential neighbourhoods and internal
main roads;
= Fenced off leash dog areas to be sited within Primary
Parks close to internal main roads and residential
neighbourhoods;
= Important ecological zones to incur minimal activity/
cultural disturbance and are to be treated/rehabilitated
primarily as habitat conservation zones in accordance
with authority planning controls;
= Intensive landscape activity areas/treatments are to be
sited in existing clearings and in areas of low ecological
significance;
= Existing native trees regardless of location within open
spaces zones are to be retained where possible and
recreational facilities and spaces are to be sited in
amongst existing trees;
= Promote the sites biodiversity importance as an integral
part of the sites recreation and learning programme
through environmental interpretative signage and
educational information panels; and
= Recognise the various asset protection zones and
facilitate the appropriate movement of emergency
vehicles throughout the site for bushfire management
purposes.
recreational facilities within the natural character of
the site and its context
A community that values the natural ecology of
the site and embraces native fauna and flora
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6- Amended Urban Design Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 193 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.