Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

MCU14/0049 & OPW14/0276: IDAS form 1-5-6

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

•   cross road drainage culverts (if applicable)
•   concrete footpaths and cycle paths
•   location and details for access points, ramps and invert crossings
•   changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing:                                                                     Confirmed
• existing and proposed contours                                                     Not applicable
• drainage locations, diameters and class of pipe, open drains and
  easements
• manhole location, chainage and offset or coordinates and inlet and outlet
  invert levels
• inlet pit locations, chainage and offset or coordinates and invert and kerb
  levels.
Applications for operational work involving water reticulation
Drawings showing:                                                                    Confirmed
• kerb lines or edge of pavement where kerb is not constructed                      Not applicable
• location and levels of other utility services where affected by water
    reticulation works
•   pipe diameter, type of pipe and pipe alignment
•   water main alignments
•   water supply pump station details (if applicable)
•   minor reservoir details (if applicable)
•   conduits
•   location of valves and fire hydrants
•   location of house connections (if applicable)
•   location of bench marks and reference pegs.
Applications for operational work involving sewerage reticulation
Drawings showing:                                                                    Confirmed
•   location of all existing and proposed services                                  Not applicable
•   location of all existing and proposed sewer lines and manhole locations
•   location of all house connection branches
•   kerb lines or edge of pavement where kerb is not constructed
•   chainages
•   design sewer invert levels
•   design top of manhole levels
•   type of manhole and manhole cover
•   pipe diameter, type of pipe and pipe alignment
•   location of house connections (if applicable)
•   sewer pump station details (if applicable).
Applications for operational work involving street lighting
Drawings showing:                                                                     Confirmed
•   location of all light poles and service conduits                                 Not applicable
•   location of all other cross road conduits
•   type of wattage and lighting
•   any traffic calming devices
•   additional plans for roundabouts and major roads (if applicable)
•   details of any variations to normal alignment
•   details of lighting levels.


                                                                          IDAS form 6—Building or operational work assessable
                                                                                                   against a planning scheme
                                                                                                     Version 3.0—1 July 2013
Log in to download the original file

MCU14_0049 & OPW14_0276_ IDAS form 1-5-6.pdf · 411 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.