NOLO we Checklist - Applications Involving Land
. Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1., APPLICATIONFORMS ~ O77 Te a -. oad
1.4 Form PartA
1.1.1. Ensure that the form is fully completed. [J
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form! Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B8-O are attached,
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed.
® 2. REFERRALINFORMATION, ooo ny an
2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals. [A]
3. ~ ENVIRONMENTALLY RELEVANTACTIVITIES 2
3.1 Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
4. ° FORM 2- REQUEST TO CHANGE APPROVAL ae rn i
4.1. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
5. PLANS oo _ BG
5.1. Ensure that at feast 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
6. SUPPORTING INFORMATION . i 4
6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration [2 |
© and Operational Works). {f the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 _In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
7, FEE" re .
7.1. Ensure that the application fee, as determined from the Council’s adopted scale of fees,
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. &
Receiving Officer PD hte Date PAL Fle 7
Having completed this form and accepted the 4fplication, please deliver both to the following IDAS Application Receiving
trays:-
¢ Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
e Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
e If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the
Land Development Section.
e Inall other circumstances — AOP1’s desk in the Land Use Section.
Piease DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.doc :See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 56 (of 69)
Section 2
Z, rk
a
6 March 2007
Shane Adamson
Manager Land Use
Noosa Council
PO Box 141
Tewantin
Queensland 4565
Dear Shane ,
Development Application for Operational Works for a Multiple Dwelling Type 2 — Duplex situated at 56
© Ferguson Street, Sunshine Beach described as Lots 0-4 on GTP 568 — Development Approval
Reference No. 2006 / 1155
Further to the above Development Approval for a Material Change of Use, please find enclosed the
following items which form the Apptication for an Operational Works Permit:
1 Form 1 Development Application Part A, signed by the Applicant (2 pages);
2 Form 1 Development Application Part E — Operational Works (2 pages);
3 IDAS Assessment Checklist (11 pages);
4 QLeave Notification and Payment Form — Local Government’ Counci! Copy (1 page);
Along with three (3) copies of the following documents:
5 Bark Design / Landform Landscape Architect's drawings as listed on the attached Drawing
Issue Sheet (1 x A4 and 9 x A3 sheets);
6 Soil Surveys’ Geotechnical Investigation, dated November 2006 (31 pages printed double-
sided);
7 Qantec McWilliam Consulting Engineers’ drawings as listed on the attached Drawing
Issue Sheet (1 x A4 and 6 x A3 sheets);
8 Construction Hydraulics’ drawings x 2no. (1606-0-1 — ‘Basement Stormwater & Sanitary
@ Drainage’ and 1606-0-1 — ‘Ground Stormwater Drainage’)
We trust that this provides all of the information necessary for you to advise us of the Application Fee,
which will be paid on receipt of your advice, to enable you to commence your assessment.
We look forward to receiving your response at your earliest convenience.
Yours sincerely
Lindy Atkin & Stephen Guthrie
Bark Design Architects
Encl.
Copy this letter and Items 1 and 4 by email to Bob and Jill Goode (remainder of items by post).
Bark Design Architects
PO Box 1355 - Noosa Heads - Queensland 4567 - Studio 185 Sunrise Road - Tinbeerwah 4563
107 5471 0340 F07 5471 0343 wwww.barkdesign.com.au_ £ [email protected]
Bark Design Pty Ltd acn 101 764.612 apn 30 101 764 612Section 3
i
Gea BUILDING AND CONSTRUCTION INDUSTRY
PO Box 512 Lutwyche Qld 4030 FREECALL PH 1800 803 481
A.B.N. 89 586 619 186 PLEASE USE BLOCK LETTERS - TO BE COMPLETED FULLY
PARTSIMEPAYERIDETAIUS a
Have you ever lodged a notification with QLeave previously? YIN N Bo tha tree cal manter above ter oesisinnee). {Contact QLeave on
Payers Legal i ABN 4 7 ;
Name Yellow Oyster Properties Pty Ltd (if applicable) 31068.71 7 5 6
Payers Trading Contact Person (FULL NAME) “7
Name . rs . :
Mailing Lindy Atkin
Address c/. PO Box 1355, Noosa Heads Picode 4567 Daytime Phone No.
Street Address C/, 185 Sunrise Road, Tinbeerwah Plcode 4563 (07) 5471°0340
| Ae | PROJ ECTIDETAIUSetease ROMO |
Project ; i Contract or Job Reference No.
Description DUPlex (two Dwelling Units) if applicable: G.12 >
Lot 1-4 PlanNo. GTP568 Local Counct NOOSA SHIRE COUNCIL \ oe 9
CA .
Centifier Noosa Building Certifiers ON . Certifier Phone (07) 5442 4778 ee
oo 56 Ferguson Street, Sunshine Beach ~~ oF .' 4, Ploode 4567 ra
“ “Os : remarry |
ata 30/04/2007 —_ Expected completion date .30/04/2008 ere osaic SUS eae mer er ui
Project Owner Goode Family Trust . s -s, |e
. ~ att “y <
Principal Contractor under the Workplace Health & Safety Act (if applicable) —_| Reference: eo >
. ‘¢ - Kd. . ' “ . 7 =, + w@
Name Not Yet Appointed “™ Co “oe oy &
. : , ‘ . . , Los .. -_
ws Principal Contractor“. * ma oO
Phone No. c nd ABN P oe fe . a Z
HAS (WANA/ US COED Coo ANGE OG SS EMDNON AEG SAT) 8
COST OF WORK « No payment or form required if work is under $ 80000 (inclusive of GST) A. $ 2438498 ?
4 ° : . NN “ ‘ ° =
No Payment is required with this form if the work is covered by an OWNER BUILDER PERMIT OB WwW
_, owner-builder permit issued by the Building Services Authority. NUMBER (if applicable): =
*Portable Long Service Leave Levy a ae or
ws , COMBINED Workplace Health & Safety Fee on ree 0.0035 x A=B $ 8535 >
Ny .. LEVY/FEE . . 0 tae - . * \ * (le $3.50 per $1000 of A) oO
a yf @Building and Construction Industry Training Levy _ \ ‘ o
‘ . LESS EXEMPTIONS * CATEGORY -. c <
~ aN : a co
YOUR PAYMENT *. | (GST not applicable) eg ke B-C=D $ 8535 g
CW: z
Oe YW) declare that the information provided in this farmis true,
PANG CXRANATEN anaes eapctuucteasceendl -
« . a/
Name Goode Family Trust = , YY Signature >
ContactNo. (07) 5447 4213 ~ Bate 12/02/2007 ae’
PARTISMEPAYMENTRECEIPT
Payers Name Yellow Oyster Properties Pty iaPoer.
Ltd E008884 fo
aX HE
oon . *] d
S
PhoneNo. (07) 5471 0340 Make Cheques Payable to QLeave ; o4 min ony}
NS ASS.
FM/CS/00047-09 Qleave is collecting the information an this form far the purposes of administenng the Building and Construction industry (Portable Long Servica Leave) Act 1991, aS required bY that Act.
QLeave may give some or all of this information to various other Government departments and agencies, as required or permitted by law.Section 4
-) \
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Form 1 Development Application idas
Y ¢ (al f if / \
The completion of all applicable questions on Part A is mandatosy for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one {1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 4.
Description of land 1. Street address: fncludinghouse number, street name, suburb/ocality name & postcode) (if applicable)
identified. However, a description of the land is not 56 Ferguson Street, Sunshine Beach, Queensland 4567
required in relation to a mobile or temporary tee ' A 7p .
Environmentally Relevant Activity (ERA). 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
development is proposed within a water body or —
© watecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567)/ GPS coordinates:
Advice for completing Q3 - Most land can be
identified by a lot on plan description. These detaits Lots 1-4 on GTP 568
pel aoernnen w coumentsortievah'ne | 4. ‘The above description is for: (tick applicable box)
ined from ti rough th ae
However, ifthe land on which the development is (i) the land on which the development is proposed; or
Pon eclaoctie nuncced intwatorbodvor (1 (ii) the land adjoining the water body or watercourse, within which the development is
watercourse) provide — proposed; or
0 ivantnaegecentiond ee C1 (ili) the water body or watercourse.
" cinreladiacen land (26 in Moreton Bay), |. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha):
ii) GPS coordinates where there i
pes conan 0 248 m2
development is within a water body or watercourse.
Advice for completing Q8 - Q8 applies if ‘ : te of : . '
developments within a local government area. 8. Loca! government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable)
Note: Areas below hgh water mark are no win a
focal government's area unless provided for under the , ° ; ,
Loca! Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for compteting Q$ - Q9 applies if i : P F F A
development is on stategic por land or a strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
Proposal details 10, Existing use of the land: (eg. vacant, single house, shop etc.)
@ provided in an attachment to the application, Four Dwelling Units
11, Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
Duplex (Two Dwelling Units)
Other applicable parts of Form 1 12, Other parts of Form 1 completed as part of this application: (eg. Part D, Part /, etc)
completed parts of Form 1. For information about Part E and IDAS Checklist
when a part of Form 1 may apply refer to Guide 1,
Applicant details 13. Applicant’s name: 15. Contact person:
appticant need not be the owner of the land. Goode Family Trust Lindy Atkin
When signing and lodging this application 14. Contact number: 16. Facsimile number/e-mail address:
The applicant is responsible for ensuring the [0754710340 sid
information provided is correct. The assessment 07 5471 0340 07 5471 0343 /
manager, any referral agency & the Chief Executive [email protected]
(where applicable) will rely on this information when
. assessing and deciding the application. 17. Postal address:
ifthe applicant is a company - a contact person cl. Bark Desigf?Pty Ltd, PO Box 1355, Noosa Heads, Queensland 4567
must be shown. ZY
18. Signature 19. Date:
Kaz Dl February 2007
[Ata MarSection 5
vv
nk
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Land owner’s consent (if appticable} 20. Land owner's consent to the making of this application:
application must contain, or be supported by, the “7 Date
involves: (i} GoodFamily Trust x Zw x 2.209
written consent of the land owner/s, if the application : :
{i) material change of use; wee eee eee eee A POOF BRE 19
{ii)_ reconfiguration of a lot; es
{iii} work on land below high-water mark & not within a (ii)
canal as defined under the Coastal Protection and we ee eb ee ee beeen ee eee
Management Act 1995;0r on
{iv) work on rail corridor tand defined under the (iii)
Transport Infrastructure Act 1994. we ee ee eee eee cee eee hee ee eee eee be cece eee ee eee
Section 3,8.1(2}{a) of the IPA provides that .
Jandowner’s consent is not required for a mobile or (iv)
temporary ERA, anne eee ene ne enn ee ee ee eee eee ee ee ee eee ee eee fee eee ee eee
For more information refer to Guide 1. (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
fesource entitlement be given for applications that
involve a prescribed State resource. | NO - go to Q24 Oo YES - go to Q22
Section 3.2.1(10)(a){ii) of the IPA prescribes that an . ge : : cm .
application cannot be taken to be property made 22. This application is accompanied by evidence: (tick applicable box)
whee ne ine Stee C1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23{vi)
ice for completing Q we . . we . : .
Refer to schedule 10 of the Integrated Planning | (ii) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that prescribes the nature of evidence development is consistent with an allocation of, or entitlement to, the resource - go
required by the State in support of the lodging of this to 023
© development application. . Q . . .. .
[_] (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go fo Q23
Advice for completing 423 23. Evidence of the resource entitlement:
The information in (i) - (v) i datory if evid i . : : . s :
remirer nde Cae ino es (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource {if
Resources, Mines and Water is mandatory where the . applicable,
application involves any water or riverine quarry {ii} Name of delegated officer
Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. Q23 {vi) must be (iii) Position of delegated officer
completed if the evidence is time limited. Po
(iv) Ps of ~ officer
(v) Date
© (vi) ae date of evidence (if applicable}
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
This checklist does not apply if the applicati . og.
the compieton of Parts A and 8 ofthe Form only, It XJ YES [7] NO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
support the proposal & enable the assessment Plan / Drawing / Report Number | Tite | ate
An application should be accompanied by details to . .
manager, referral agencies and any person viewing :
the application during public scrutiny or public (i) Refer to Bark Report
Notification to understand the scope of the proposal vo aa reese ees eee ees coe eee ess sss see esses sees
and any potential impact. (ii)
(iii)
(iv)
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY {applicable to assessment manager's)
| FEE ($} - DATE / RECEIVING OFFICER’S | REFERENCE |
i RECEIVED _NAME/S { NUMBERIS |
Notification of Engagement of Private Certifier (Optional fonnat)
To Council, | have been engaged as the private certifier for the building work referred to in this application.
Date ofengagement / / Accreditation Number: ___ Name: Signature:Section 6
INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004
Form 1 Development Application idas
Operational &/or building work %
assessable against a local government’s planning scheme <t |
2 3 s
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.
Nature of the application 1. This application is for (tick one (1) or both if applicable)
A development permit authorises (J Preliminary approval - provice details of the type of work eg. roadwork, stormwater, water and sewerage
development to occur, while a preliminary infrastructure, elc
approvat is a step in the approval process :
anddoesotauotse deveoomentioocc| [|
© a planning scheme are determined by the AND/ OR
The types of work that are assessable against
wilvany poll erne-vlies govemment and Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
To determine th f work that are infrastructure, etc
assessable under & pariular planing Landscaping, access and/or carparking, site civil works, stormwater drainage, frontage
scheme, contact the relevant tocal works and earthworks.
goverment. :
2. Are the works subsequent to a previous development approval?
[_] NO YES - provide details of all previous approvals (eg. file references)
Development Approval for a Material Change of Use - Application Ref: 2006/1155
3. _ Is the subdivision for a canal estate?
x] NO (] YES
Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) YES - complete Q5
Prior to issuing a development pemnit for the
works, the assessment manager is required Lj NO - Q5, 6 & 7 do not apply
by law to “sight” an approved form, issued by
Qleave, which signifies that the PLSLlevy |5. Has the PLSL levy been paid?
has been paid. EX] YES - completeas
© | NO -~ the applicable levy must be paid before a development permit can be given for the works
6. How much was paid?
8535
7. Whatis the receipt number of the payment?
E008884
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager)
REFERENCESection 7
INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004
(i) ts a PLSL levy applicable in this instance? [INO YES - complete Q¢ip
(ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application?
—X] NO L_] YES - provide receipt details belowSection 8
* Sy
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Form 1 Development Application idas
yy Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerty referred to as the “Referrals Checklist”. Some of the 'Guides' to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist". The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources, Mines and Water, Queenstand Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.
4. Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications {other than those requiring the completion of Parts A & B only).
5. _ Itis the responsibility of the applicant to accurately complete this checklist.
© 6. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
7. The assessment manager for the application will rely on the information provided in this checklist (as wel! as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination2.
8. Toassist you in answering the following questions a series of guides are available free from the IPA website www ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
9. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au.
10. Section 2 on page 10 provides advice about the referra!s that can be required for applications for building work assessable against the Building Regulation 2006.
SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es}
For more information refer to Guide 4 C1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered “none of the above" te Q1, the
application requires assessment by the - has not been made - complete Part G of Form 1 . .
administering authority? C1 (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering authority, is made - complete Part G of Form f
the assessment manager for the application, the ees
administering authority is a concurrence agency for CX] (iii) none of the above
the application in retation to this matter.
Note: An application involving ERA 19 and/or 20 will
© also require completion of Part Kr of Form 7 for
approval where an allocation under the Water Act
2000 is required.
State-controlled road matters 2. The application involves: (tick applicable box/es)
F information refer to Guide 3, . .
oF more Informarbon refer fo Guided, C1 ({i) development on land contiguous? to a State controlled road and for -
Unless you answered “none of the above’ to Q2, the . . : :
application triggers referral to the Department of (1) (a) material change of use assessable against the planning scheme;
Main Roads (DMR) as a referral agency. . .
In certain circumstances DMR will be an advice O (b) reconfig uring a lot unless . .
agency, while in other circumstances DMR will be a « the total number of lots is not increased; and
concurrence agency e the total number of lots abutting the State-controlled road is not increased;
Schedute 2 of the [P Regulation will assist you to . . . .
determine where DMR is an advice or concurrence () (c) operational work (not associated with a material change of use assessable against the
agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)—
« associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary industries and
Fisheries (for a delegated ERA).
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controlled road.
Page 1Section 9
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
State-controlled road matters (cont) {_] (ii) development on land not contiguous to a State-controlled road and -
LJ (a) material change of use -
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(C] (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(] (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)-
* assessable against the local government's planning scheme; and
» mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
(iti) none of the above
Clearing vegetation 3. The application involves: (tick applicable boxes)
For more information refer to Guide 12. CT (i) material change of use -
Unless you answered ‘none of the above" to 3, tha . . .
application requires assessment by the Department (a) assessable against the planning scheme;
of Natural Resources Mines and Water (NRMW) (b) on alot containing _
i Ie soe
If an agency other than NRMW is the assessment .
manager for the application, NRMW isa « acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
nee ney for the application in relation to « ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
© ifyou ticked Q34i) or (i), your application requires (c) where the existing use of the land is a rural or environmental use; and
referral to NRMW for assessment regardiess of (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
whether vegetation clearing is proposed or not. . .
(1 (ii) reconfiguring a lot -
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d} where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
LJ (iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form f
(iv) none of the above.
Strategic port land 4. The application involves:
Fer mare informavon refer Cade. CJ (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
If you ticked {i) - the relevant Port Authority is the Act jete Part | of Form 1
assessment manager for the application. ) - complete Part ! of Form
It you ticked (ji) Queenstand Transports a CL (ii) a material change of use that is inconsistent with the land use plan approved under the
concurrence agency for the application, TI Act for the strategic port land - complete Part ! of Form 1
[X] (iii) none of the above
Acid sulfate soils 5, The application involves development on land situated in an identifieds local government area
For more information refer to Guide 10, and where the surface of the land is: (tick applicable box)
Unless you answered “none of the above” to Q5, the : 6 ups : 3
application requires assessment by Department of (i) below 20m AHD6& and the development will involve the excavation of 1000m? or more of
Natural Resources Mines and Water (NRMW). soil or sediment at or below 5m AHD, or
If an agency other than NRMW is the assessment (-] (ii) at or below 5m AHD and the development will involve filling the site with 1000m: or more
manager for the application, NRMW is an advice .
agency for the application in relation to this matter. of material
[X] (iii) none of the above
5 The identified local government areas are: Aurukun, Bowen, Brisbane, Sroadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gotd Coast, Hervey Bay, Hinchinbrooke, ‘sis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
6 Australian Height Datum {AHD).
Page 2Section 10
es “
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Major hazard facilities or possible 6. Does the application involve a material change of use for a major hazard facility or possible
major hazard facilities major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
For more information refer to Guide 17.
lf you answered “YES” to Q6, the application X NO
ancy Services (DES). [_] YES - complete Part L of Form 1
requires assessment by the Department of .
if an agency other than DES is the assessment
manager for the application, DES is a concurrence
agency for the application in relation to this matter.
Water related development under the |7. The application involves:
Water Act 2000 C1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
For more information about items (a} - (d), refer to {tick applicable box/es}
Guida 15. For more information about item (e), . .
refer to Guide 14 Does my application involve (a) in a watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
assessment of a referable dam? a pump, gravity diversion, stream redirection, weir or dam) - complete Part Kz, Ks, Ks Ke, or Ko of
Unless you answered “none of the above” to Q7, the Form 1 whichever is applicable;
application requires assessment by the Department : .
of Natural Resources Mines and Water (NRMW). [[] (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
If an agency other than NRMW is the assessment K; of Form 1;
manager for the application, NRMW is a : : 7
concurrence agency for the application in relation to (_](c) for a subartesian bore, in declared groundwater area’, for use for purposes other
this matter. than stock and/or domestic use - complete Part K: of Form 1;
(-] (a) for a subartesian bore, in certain declared groundwater area, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
[J (e) for constructing a referable dam® or that will increase the storage capacity of a
@ referable dam by more than 10% - complete Part Ks of Form 1; or
(1 (f) for taking or interfering with overland flow water - complete Parts Ks and G of Form 1
EX] (i) none of the above.
Removal of quarry material froma |8. Does the application involve development for the removal of quarry material from a watercourse®
watercourse requiring an allocation notice under the Water Act 2000?
For more information refer to Guide 16. XM NO
If you answered “YES” to Q8, the application
Resources Mines and Water (NRMW). O P f
requires assessment by the Department of Naturat YES - complete Parts Kz and G of Form 1
If an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter.
Note: Part G of Form 1 is required to be completed
as the activity of removing quarry material from a
watercourse is also an Environmentally Relevant
Activity (ERA).
7 The declared ground water areas are listed in Guide 13 Development ina declared catchment area.
8 Referable dam is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA.
Page 3Section 11
. .,
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Operational works in atidal areaor |9, The application involves operational work that is: (tick the applicable box/es)
So ea g eT ett coemore Ci) tidal work*® as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in local Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
eee lida! areas refer arene 002 ne} Eli). tidal work that is prescribed tidal work" other than in a canal"? -complete Part P of Form 1; oF
ness you answered ‘none of the a , - . a oo,
application requires assessment by the (J (ii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.
Man ae te he apptaien EPA ss concurrence [J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
agency for the application in relation to this matter. other than those works in tidal water) where the development has been determined not
Local government & the assessment manager for at to be assessable against the Water Act 2000 ;
prescri work. , . .
(J (b) constructing a canal’? intended to be connected to tidal waters;
LJ (c) constructing an artificial waterway;
(J (d) reclaiming land under tidal water;
(] (e) disposing of dredge spoil or other solid waste material in tidal water;
[J (f) interfering with quarry material on State coastal land above high-water mark;
(1) (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
[_](h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(_] (i) constructing a bank or bund wall to establish a ponded pasture on land, other
© than State coastal !and, above high-water mark; or
(iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: (tick the applicable box/es)
mark formation refer to Guide 18. For more C1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work work in local Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
ene aetna en ov 7 (ii) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; OF
you answer ve . ae gs
the application triggers referral to Queensland [_] (iii) carried out within a coastal management district'S under the Coastal Act and for -
Transport (QT) (Maritime Safety Qld) as a . . ' . ee ge
concurrence agency. (-] (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager for alt M of Form 1;
i j k. noe .
Prescribed tal wor [1 (b) reclaiming land under tidal water - complete Part M of Form 1; or
(_](c} constructing a canal’, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
[X] (iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more information refar to Guide 18, CL) (i) material change of use assessable under a planning scheme involving operational
Unless you answered "none of the above" to Q11, ‘ i jetrict5
ine application requires assessment by the work carried out completely or partly in a coastal management district
© Environmental Protection Agency (EPA). {_]{ii) a material change of use assessable under a planning scheme involving building
ran ore he ppleaton EPA eet oe work, carried out completely or partly in a coastal management district that is —
agency for the application in relation to this matter. e the construction of a new premises with a GFA’ of at least 1000m2
e the enlargement of the GFA of existing premises by more than 1000m?
LJ (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
[_] (iv) reconfiguring a fot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal'® — complete Part M of Form 1
(v) none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
{2 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastaf Protection and Management Regulation 2003 and inctudes certain tidal works cornpletety of partly within a tocal government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 Canal means canal as defined under the Coastal Protection and Management Act 1995
17 GFAis defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
18 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4Section 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Development within the limits of a 12. Does the application involve development below high water mark'9 and within the limits of a port
port under the Transport Infrastructure Act 1994?
For more information refer to Guide 18. For NO
information about prescribed tidal work refer to a
Guide 24, (_] YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
If you answered “YES” to Q12, the application
triggers referral to the Port Authosity.
The Port Authority is a concurrence agency if the
devetopment is -
© within 200m of a shipping channel or an entry
and exit shipping corridor for the port
e within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
© within 1000m of a planned por facility identified
in aland use plan approved under the Transport
Infrastructure Act 1994.
tn ail other situation the Port Authority is an advice
agency.
Marinas 13. Does the application involve operational work that is tidal work for a marina2° with more than 6
For more information refer to Guide 18. For vessel berths?
information about whether a marina is prescribed
tidal work refer to Guide 24. The local government fx] NO
is Ge assessment manages fora prascibed Hal (11 YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work
: 4 preseribed b
If you answered “YES" to Q13, the application
triggers referral to Queensland Fire and Ri
© Service as an advice agency.
Tida! works in strategic port land tidal! 14. Does the application involve tidal works within a strategic port land tidal area2"?
areas x] NO
For more information refer to Guide 18. Oo YES - complete Pert M of Form 1
Unless you answered "NO” to 014, the relevant Port
Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queenstand Transport (QT) are
concurrence agencies for the application.
Heritage 15. Does the application involve development in a heritage registered place as defined under the
For further information refer to Guide 19, Queensland Heritage Act 1992?
lf you answered “YES” to Q15, the application & NO
triggers referral to the Queensland Heritage Council
@$ concurrence agency for the application. C] YES- complete Part C of Form 1
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, including 3 list of the declared involves: (tick the applicable box/es)
catchment areas within Queenstand, refer to Guide . . . . . . .
13, (1 (i) reconfiguring a tot if any lot resulting from the reconfiguration is less than 16 hectares;
vnless “hoaion weeuires sex of ire tote Q16, (J {ii) development assessable against the planning scheme involving the establishment or
Department of Natural Resources Mines and Water expansion of a waste water disposal system, other than a disposal system for carrying
ni : . . .
(NRMW), out an environmentally relevant activity under the Environmental Protection Act 1994;
@ manager for the application, NRMW is a Xx) (iii none of the above
If an agency other than NRMW is the assessment im
concurrence agency for the application in relation to
this matter. -
Contaminated land 17. The application involves: (tick the applicable box/es)
on rconfigutng a0 ey fone iis voeral ancl (J (i) reconfiguring a lot for which all of part of the premises are -
For more information refer to Guide §, (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
Unless you answered “none of the above" to Q17, « item §, including the exemption otherwise provided for by paragraph (d);
re aopinaion eae nhgeney EPA) an e item 6, including the exemption otherwise provided for by paragraph (e); or
nvironmen rolection Agency . ., . : . . . - os
agency other than EPA is the assessment manager e item 7, including the exemption otherwise provided for a mining activity or petroleum
for the application, EPA will be a concurrence activity; or
agency for he application in relaion fo this matter. (b)_ in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
LJ (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if ail or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 4
(ii) none of the above
19 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
20. Marina is defined in the Transport Operations {Manttime Pollution) Reguiation 1995.
21 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent fo strategic port land.
Page 5Section 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Electricity infrastructure 18. The application involves: (tick the applicable box/es)
Fax more information refer to schedule 2of the IF (J (i) reconfiguring a fot where any part of the fot is -
Untess you answered ‘none of the above” to 18, « subject to an easement in favour of a distribution entity or transmission entity under the
the application triggers referral to the agency to Electricity Act 1994 and the easement is for a transmission grid or supply network under
which the easement is granted in favour of as advice that Act; or
ey. « situated within 100m of a substation site;
(_ (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if ~
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
¢ any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
C (iii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
CJ (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
e any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
@ e the work is located wholly or partly within 10m of a substation site;
XJ (v)_ none of the above.
Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure designated for community infrastructure?
arrinated for com aity neastucre rey bigger (i) intended to be supplied by a public sector entity; and
this referral, (ii) on land not owned by or on behalf of the State; and
For more information refer to schedule 2 of tha IP wes
Regulation, (iii) other than development —
If you answered "YES" to 019, the application (a) for the designated purpose; or
fequires assessment by the chief executive of the . .
department administering the Act authorising the (b) carried out by, or on behalf of, the designator.
development for the designated purpose. & NO
If an agency other than the designator is the
assessment manager for the application, the | YES
designating agency will be a concurrence agency for
the application in relation to this matter.
Page 6Section 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
SEQ Regional Plan 20. The application involves (tick applicable boxes) -
For more information refer to schedule 2 of the IP | (i) a material change of use of premises -
Requiation, . . . .
(a) ina Major Development Area in the Urban Footprint for -
Refer to Chapter 2, part SA and schedule 10 of the [J (i) an urban activity -
Sony tee 2g2, and schedule 2 of ihe C1 inan area included in a structure plan where the IPA, section 3.1.6
i . + . .
Untess you answered “none of the above" to Q20, applies;
Ue venaeemeattOuN by the Office of (1) in an area not included in a structure plan where -
Than Menagemen e the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
» the gross floor area (GFA) on the premises will exceed 10,000m2; or
* impact assessment is required under the relevant planning scheme
LJ (ii) intensive animal husbandry, or
LJ (iii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
LC} (i) anurban activity and not specified in section 2.4(2); or
() (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
@ {d) in the Investigation Area for -
[) (i) an urban activity and not specified in section 2.10(2);
C1] (ii) residential development involving a rural residential purpose and not
p
specified in section 2.12(2); or
[J (iii) intensive animal husbandry
(C} (ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) notincluded in a structure plan; and
{b) not specified in section 3.1(2).
1 (iii) none of the above
Fisheries matters 21. The application involves: (tick the applicable box/es)
Far mare information refer to schedule 2of the |P C1 (i) an assessable material change of use for aquaculture - complete Part O; of Form 1;
Uniess you answered “none of the above" to 021, (I (ii) assessable operational work that is the construction or raising of a waterway barrier -
the application requires assessment by the complete Part O3 of Form 7;
Depa i ¥ st ies a i i eas! . . ‘ .
oe of Primary indusities ond Fisheries C1 (iii) assessable operational work completely or partly within a dectared fish habitat area-
if an agency other than DPI&F is the assessment complete Part O2 of Form 1;
© Sean ihe acpteaton i coirvioch []{iv) assessable operational work that is the removal, destruction or damage of a marine
{iv) and an advice agency in celation to item (v). plant - complete Part O2 of Form 1,
[_] (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
EX] (vi) none of the above.
Page 7Section 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Integration of land use and public 22. The application involves: (tick the applicable box/es)—
rane p Or sion tefer to Guide 23, schedule 8A J (i) a material change of use assessable against the planning scheme for a purpose
of the IPA, & schedule 2 of the IP Regutation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered "none of the above’, the schedule.
application triggers referral to QT as a concurrence
agency. C1] (ii) reconfiguring a fot—
(J (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
[_](b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
CJ (c) on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m¢ or greater;
[_]{d) for a residential purpose within the 25 ANEF contour for an airport;
(| {e) for a residential purpose resulting in 100 or more allotments.
(_] (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
(1 (a) is completely or partly within a public transport corridor or a future public
transport corridor;
(J (b) will result in work that encroaches into an airport's operational airspace.
© (iv) none of the above.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
ehh Radaode Zot to Gusta 2a, scheshie GA CF (i) a material change of use assessable against the planning scheme for a purpose
Unless you answered ‘none of the above", the mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
application triggers referral to QT as a concurrence schedule.
agency. J {ii) reconfiguring a lot—
LJ {a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
[-}(b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
LJ (c) on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases:
(J (d) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(J (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(J (f} for a residential purpose resulting in 100 or more allotments.
(_] (iii) operational work assessable against the planning scheme, but not associated with a
@ material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
LJ (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
[J (b) is completely or partly within future railway land, or a railway tunnel easement;
{J (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
{1 (iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
Regulation \ . [_] (i) a material change of use assessable against the planning scheme and not associated
Untess you answered "none of the above’, the . . . .
application triggers referrai to the holder of pipeline with reconfiguring a lot, and any structure or work will be located wholly or partly in the
licence No 1 issued under the Petroleum Act 1923, easement.
currently Santos QNT Pty Ltd, for advice. g (i) recon: figuring alot
[_] {iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
[<1 (iv) none of the above.
Page 8Section 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Koala habitat area 25. The application involves: (tick the applicable box/es}-
Chad Dot P Renin C7 (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
Unless you answerad “none of the above", the activity and will result in -
application requires referral to the Environmental \ \ .
Protection Agency as a concurrence agency. {_] (a) clearing of native vegetation over an area greater than 2500m2;
[-] (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;
[_](c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;
(J {d) extracting gravel, rock or sand from an area greater than 5000m?;
(_](e) excavating or filling an area greater than 5000m2;
[] (f} additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
J (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -
(J (a) anincreased number of lots;
(J (b) clearing of native vegetation over an area greater than 2500m2.
1 (iii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
@ over an area greater than 2500m?.
(_] {iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in —
(J (a) clearing of native vegetation over an area greater than 2500m?;
J (b) extracting gravel, rock or sand from an area greater than 5000mz?;
[1 (c} excavating or filling an area greater than 5000m?.
[x] (v) none of the above.
Referral coordination 26. Does the application trigger referral coordination?
if the application involves -— x] NO
An information request requires referral coordination
(i) 3 of more concurrence agencies; or (_] YES, as the application: (tick the applicable box/es)
(ii) a facility or area assessable under a . . .
planning scheme and prescribed in (1 (i) triggers 3 or more concurrence agencies;
hedule? or 8 of the IP Regulation; “ . . .
(ii development which i sublet an * [J (ii) involves a material change of use made assessable under a planning
application for preliminary approval scheme and prescribed in schedule 7 of the IP Regulation;
mentioned in $3.1.6 of the IPA. . . . . oo
For more information go to Guide? and Guide 6. (J (iii) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a fot, in an area prescribed in schedule 8 of the IP Regulation;
© (J (iv) _ is for a preliminary approval mentioned in 3.1.6 of the IPA
Referral agency responses priorto | 27. Did areferral agency give a referral agency response under $3.3.2 of the IPA before the
lodgement application was made to the assessment manager?
Under $3.3.2 of PA a referral agency may give a & NO
referral agency response on a matter within its
for Be propos is ae to the assessinont (_] YES - attach a copy of the referral agency/s response/s
jurisdiction about a proposal before an application .
manager.
This is commonly the case where an application
requires referral to a building referral agency (eg.
Qld Fire and Rescue Service).
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist {if applicable).
OFFICE USE ONLY (applicable to assessment manager) : _
DATE RECEIVED REFERENCE NUMBER/S
Page 9Section 17
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
SECTION 2 — BUILDING REFERRALS (completion not mandatory)
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
Special fire services - generally 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information go to schedule 2 table 4 and requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
schedule 2A of the IP Reaulation. (IP Regulation} or includes an altemative solution assessed against the performance requirements of the
Assessment period 15 days. No response is a Building Code of Australia.
deemed refusal.
Fire safety for budget accommodation | 2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information go to schedule 2 of the IP the subject of the application requires the installation of a fire safety system for a budget accommodation
Regulation building.
Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
Far more information go to schedule 2 of the IP if the application involves a workplace incorporating spray painting.
Regulation
Retail meat premises 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
For more information go to schedule 2 of the IP retail meat premises.
Regulation
Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the application
For more information go to schedule 2 of the IP involves a private health facility.
Reguiation
Workplace area less than 2.3m? 6. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
© For more information go to schedule 2 of the IP application involves a work place area less that 2.3m?.
Requiation
Land contiguous to a State-controlled|!7. An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
road agency if the application involves land contiguous to a State-controlled road.
For more information go to schedule 2 of the IP
Regulation
Pastoral workers accommodation 8. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves pastoral workers accommodation.
Regulation
Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the
For more information go to schedule 2 of the IP application involves a childcare centre.
Regulation
Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves land completely or partly seaward of a coastal building line22,
Requtation
Heritage 11. An application may trigger referral to the Heritage Council as a concurrence agency if the application
For more infarmation go to schedule 2 of the IP involves a heritage registered place.
Regulation
Fisheries matters 12, An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
For more information go to schedule 2 of the 1P concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Paquin as an advice agency if the application invalves assessable building work on land that adjoins a declared fish
© habitat area.
Integration of land use and public 13, An application may trigger referral to Queensland Transport as a concurrence agency if the application
transport involves existing or future public transport corridors, or airport operational airspace”.
For mare information go to schedule 2 of the {P
Regulation
Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application
For more information go to schedule 2 of the IP involves future railway land.
Regulation
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.
Amenity and aesthetic impact of 15. An application will trigger a referral to the local government if it is :
particular building work for single e for a single detached class 1 building or class 10 structure; and
detached class 1 building or class 10 e the local government has declared by resolution the following:
building or structure — the appearance of the building or structure will have an extremely adverse impact on the amenity of
For more information go to schedule 2 table 1 of the the locality; and
FRep lle ; — the appearance of the building or structure would be in extreme conflict with the character of the
Assessment period 15 days. No responseis a localit
deemed approval, y.
2 Coastal buitding lines are prescribed under the Coastal Protection and Management Act 1995.
% Operational airspace is as defined in State Planning Policy 1402 "Developmentin the Vicinity of Certain Airports and Aviation Facilities".
Page 10Section 18
INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Whether particular buildings may be |16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the
P Regulation,
Assessment period 15 days. No response is a
deemed retusa.
Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work
For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
[P Regulation. 18. An application may trigger referral to the local government as the concurrence agency if the building work
Assessment period 5 days. No response Is a does not comply with the qualitative statement for building clearance and site cover.
deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.
Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more information go to schedule 2 table 1 of the been completed.
IP Regulation.
Assessment period 15 days. No response is a
deemed refusal,
Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
services building work
For more information go to schedule 2 table 1 of the * — complies with the performance criteria of the Queensland Development code part 15; and
IP Requlation and the QDC part 15. « the work does not comply with an acceptable solution stated in the part.
Assessment period 15 days. No response is a
@ deemed refusal.
Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential
For more information go to schedute 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
(P Reauiation and the QOC part 20. referral to the local government as the concurrence agency.
Assessment period 15 days. No response is a
deemed refusal.
Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the
IP Regulation,
Assessment period 5 days. No response is a
deemed refusal.
Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the
designated rainwater tank area building work or structure complies with the relevant performance criteria if -
For more information go to schedule 2 table 1 of the e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
{P Requlation and the QDC part 25. building work, in a designated rainwater tank area; and
Assessment period 15 days. No responseis a e Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
deemed refused solution for a relevant performance criteria.
Page 11Section 19
SOIL SURVEYS
PROJECT NO. 306-2474
e NOVEMBER, 2006
YELLOW OYSTER PROPERTIES
GEOTECHNICAL INVESTIGATION
PROPOSED DUPLEX RESIDENCE
CNR. BRYAN & FERGUSON STREET
SUNSHINE BEACH
-QANTEC McWILLIAM
CONSULTING F NOINZERS
b Merocs' 7°:
. ate re ened
Rec'd 0 4 BEE ced
Job No. srevaneeneneressteetneecreennseecner typ
~ OFFICES IN BRISBANE, GOLD COAST AND SUNSHINE COAST _Section 20
TABLE OF CONTENTS
41 Site Description i eecvveeecceeeeeeeeeeeei2
4.2 Field Investigation 2
4 faboratory Testing ng
2-tSubsurface Profle oo eeeccceereceecee [email protected] Traffickability and Site Preparation gs
a
8.3 Excavation Sapte ng
8.4 Building Foundations ceeeee ess B
6.4.7 Site Classification eg
6.4.2HighLevelFootings
6.4.3 Construction Considerations re
a
BS 7 Genera vvevcccesececessenececs 8
6.5.2 Sub Base coco ecb cece ce cceecece 8
G6 Retaining Was ove eeeeececeeeee eee 9
e 6.6.7 Genera cov ccec ce vebeesecesees 9
6.6.2 Pressure Distribution ©)
APPENDICES
A Notes Relating to this Report
B Borehole Records
Cc Laboratory Test Results
D Site PlanSection 21
Project No. 306-2474
November, 2006 Page 1
Page
1.0 INTRODUCTION
This report presents the results of the geotechnical investigation carried out by Soil
Surveys Engineering Pty. Limited at the site of the proposed duplex residence, located at
the corner of Bryan and Furguson Streets, Sunshine Beach.
The report details the scope of the investigation works undertaken and provides
discussion on existing ground conditions and recommendations on geotechnical design
parameters to assist with the design and construction of the proposed development.
2.0 SCOPE OF GEOTECHNICAL SERVICES
£0 SUUre Ur GEOTECHNICAL SERVICES
The objectives of this Study were to identify materials and material properties and
groundwater conditions to enable geotechnical assessment of design parameters to ©
assist the design and construction of the proposed development:-
* Investigation of the subsurface profile in the area of proposed duplex residence by
drilling, sampling and insitu testing with three (3) boreholes.
* Laboratory testing on selected Samples to assess the geotechnical properties of the
subsurface material.
* Engineering analysis of site investigation and laboratory test results to evaluate:-
- Site preparation and earthworks recommendations
- | Foundation parameters for design, including allowable bearing capacity
3.0 PROPOSED DEVELOPMENT ®
St SAME EY VPEVELOPMENT
It is understood that the proposed development is to consist of a duplex pair of residential
units. Referring to the provided architectural plans, the buildings is to be two storeys, with
a basement carpark. It is expected that the building would have a podium slab,
Suspended concrete slab floors, and mixed masonry and frame construction.
YB SOIL SURVEYS ENGINEERINGSection 22
' » Project No, 306-2474
November, 2006 Page 2
eee TO
4.0 GEOTECHNICAL INVESTIGATION
4.1 Site Description
The site, at the time of the investigation, was occupied by an existing residential dwelling
and out buildings. The ground surface surrounding the existing buildings was well
grassed with sparsely located medium to large sized trees and shrubs. An existing
swimming pool occupies the northern part of the site.
4.2 Field Investigation
Subsurface conditions in the area of the proposed development were investigated by
drilling and sampling three (3) boreholes to depths of between 1.5m and 4.5, using a
combination of hand auger equipment and a 4WD mounted Jacro 200 drilling rig.
@ Dynamic cone penetrometer (DCP) tests were carried out adjacent to all the boreholes.
The classification of soils in the field is subjective, based on the experience and judgment
of the supervising geotechnician and some variations in the soil description from the
actual material type may occur. In order to reduce any inconsistencies which may have
occurred, the field descriptions have been corrected, where appropriate to reflect the
available laboratory test results.
The soil classification descriptions, field and laboratory testing were carried out in general
accordance with the following Australian Standards.
* AS.1726 - 1993 Geotechnical Site Investigations
* AS.1289 Methods of Testing Soils for Engineering Purposes
@ A description of the investigation method, borehole records and a site plan showing the
location of the boreholes are included in the Appendices.
eee
FH SOIL SURVEYS ENGINEERINGSection 23
Project No. 306-2474
November, 2006 Page 3
4.3 Laboratory Testing
Laboratory testing was carried out on representative samples of the subsurface material
obtained during the field investigation to assess the geotechnical properties.
Laboratory testing included:-
* Particle Size Distribution - to assess the percentage by mass of particles within
different size ranges.
All laboratory testing was conducted in accordance with Australian Standards methods.
The results of the laboratory testing are summarised below (Table 1), and provided in full
in Appendix C.
TABLE 1 LABORATORY TEST RESULTS ©
BH1 0.65m Passing 0.6mm = 99%
Passing 0.3mm = 68%
Passing 0.075mm = 3%
5.0 GEOTECHNICAL MODEL
5.1 Subsurface Profile
The subsurface profile encountered in the boreholes generally consisted of fine to
medium grained silty sand. Fill material was encountered in both of the boreholes drilled
using the 4WD mounted Jacro 200 drilling rig. The fill material encountered in borehole @
BH1 consisted of very dense sandy gravel associated with the existing driveway
construction, in which the borehole was located at. The fill material encountered in BH2
consisted of loose silty sand to a depth of approximately 1.0m. The natural subsurface
materials encountered in the boreholes consisted of typically of dense and very dense
silly sand with layers of loose to medium dense sands.
Groundwater was not encountered in the boreholes at the time of the investigation.
Seepage should be expected through the granular materials following periods of
prolonged rainfall.
BH SOIL SURVEYS ENGINEERING
~Section 24
r . Project No. 306-2474
November, 2006 Page 4
TT soe PGE
Full borehole records are appended and a summary of the subsurface profile is
presented in Table 2.
TABLE 2 SUBSURFACE PROFILE SUMMARY
| Borehole) Fill Pe oP" Natural FS Borehole |
bo he E Reese] Medium. [fs Dense ~ | Very Dense |’ Depth:
eee ee ee ee
BHI 0.00-0.30 | 230-7D | 030-065 | 065-140 4.50
1.10-1.55 1.55-2.30
BH2 0.00-1.05 1.05-1.50 1.50-2.30 2.30-3.30 4.50
3.30-TD
TT
ZB SOIL SURVEYS ENGINEERINGSection 25
Project No. 306-2474
November, 2006 Page 5
6.0 ENGINEERING ASSESSMENT
24 ENGINEERING ASSESSMENT
&.1 Traffickability and Site Preparation
At the time of the investigation, problems with traffickability problems were not
encountered in vehicle accessible areas, due to the surface being well grassed.
Problems with traffickability could arise from disturbance of the upper soil layers as a
result of removal of vegetation and existing structures.
It is recommended that after Stripping, clearing and grubbing, the exposed surface in the
construction area be proof rolled to delineate weak areas and improve traffickability,
The use of a sub-base gravel overlay (MRS 11.05, Subtype 2.4, BorC Grading/150mm @
nominal layer thickness) should also be considered in vehicle access areas to improve
general traffickability during construction. Use of tracked equipment may be necessary
for traffickability on the sand subgrade.
The relevant contractors should therefore fully inform themselves of the ground
conditions on site prior to commencement of earthworks.
6.2 Earthworks
All earthwork procedures should be carried out in a responsible manner in accordance
with AS.3798-1996 “Guidelines on Earthworks for Commercial and Residential
Developments’.
Earthwork procedures should include the following:- @
* Clearing, stripping and grubbing should be carried out in areas subject to earthworks
and construction. Also all soils containing organic matter should be stripped from
the construction area. This material is not considered suitable for use as structural
fill.
* Depressions formed by the removal of vegetation, underground elements etc. should
have all disturbed weakened soil cleaned out and be backfilled with compacted
select material.
* The in-situ soils, where free of Organic and deleterious material, may be used for
Structural fill provided the moisture content of the soils on placement approximates
the optimum moisture content required for compaction. This may require
conditioning to bring the soils to optimum.
YF SOIL SURVEYS ENGINEERINGSection 26
r . Project No. 306-2474
November, 2006 Page 6
eee IE
* Imported select fill material, if required, should be a good quality select fill material
with a soaked CBR >10% and a maximum aggregate size of 75mm.
* Fill placed in the area of the building should be compacted in layers (approximately
200mm loose thickness) to a density not less than 95% of maximum dry density in
accordance with AS 1289 5.1.1 (Standard Compaction).
* Field density testing should be carried out to check the standard of compaction
achieved and the placement moisture content. The frequency and extent of testing
should be as per guidelines in AS.3798-1996, Section 8.0.
The soils encountered on site {to borehole depth) should be within the excavation limits
of a small dozer (eg. Cat D4 or similar) in bulk earthworks and a medium sized backhoe
(eg. Case 580 or similar) in trench excavations.
© 6.3 Excavation Stability
The following general recommendations are made for short term stability of batters for
bulk excavation of the site.
* Batter angle not greater than 1V:2.5H above the horizontal.
* Top of batter to be a minimum of 2.0m inside any boundary line, in addition to 3.0
metres distance from any building or structure.
* If batters are to be left untreated for any length of time, a batter angle of 1V:4H is
recommended and berm width are to be strictly maintained.
6.4 Building [email protected]. Site Classification
While a site classification in accordance with AS.2870 ‘Residential Slabs and Footings'
relates to residential type construction and is not directly applicable for this development,
itis, however, a valuable method of classification.
Given the investigation drilling encountered Sandy soils only, which are non-reactive to
variations in soil moisture, the site could be classified as “Type A” in accordance with
AS.2870 ‘Residential Slabs and Footings’. While no surface movement would be
expected due to changes in moisture, some settlements may occur in the upper very
loose to loose sand due to vibration induced compaction (construction activities, vehicle
movements, etc.).
TT eee
YF SOIL SURVEYS ENGINEERINGSection 27
Project No. 306-2474
November, 2006 Page 7
Page 7
It is recommended that the designers satisfy themselves that the use of AS.2870 is
applicable for the proposed design.
6.4.2. High Level Footings
Given the proposed scope of excavation for the basement floor, a high level foundation
system may be suitable for this development.
The base of all footings should be individually recompacted using a vibrating plate
compactor prior to placement of reinforcing steel and concrete as soils may be loosened
during the excavation process by machinery action. If the sand is dry, it should be
saturated and left for a short period prior to vibration. Should any loose areas be
encountered in the footing excavations the density of these areas must be improved.
Table 3 outlines allowable bearing capacities for high level footings on the site.
TABLE 3 ALLOWABLE BEARING CAPACITIES FOR HIGH LEVEL FOOTINGS
~~ Sand -Medium Dense | ~~~ 400 “450.—~~”
- Dense to Very Dense 150 225
6.4.3. Construction Considerations
Inspections
It is recommended that inspections be undertaken by an experienced and qualified @
geotechnical engineer following footing excavations to confirm the adequacy of the
founding soils. Inspections should be carried out prior to placement of reinforcing steel
and ordering of concrete.
Underground Services
Where footings are located adjacent to underground services, the footings should extend
to base a minimum of 300mm below the trench base level for a distance of 1.0m out from
the trench. Beyond 1.0m, the footings should be taken a minimum of 300mm below an
imaginary line drawn up at 30° from the trench base level. Figure 1 refers.
These requirements do not override minimum footing base levels.
GH SOIL SURVEYS ENGINEERINGSection 28
« . Project No. 306-2474
November, 2006 Page 8
TT Page
Service
Trench
a "
All footings 300mm
below this line me
30 degrees _
<< —>>
1.0m
@ FIGURE 1
6.5 Slab On Ground
6.5.71 General
Field and laboratory test results indicate that the existing in-situ soils, along with any
controlled fill, are suitable for slab on ground construction provided that site preparation
earthworks are carried out in accordance with recommendations in Sections 6.1 and 6.2.
6.5.2 Sub-Base
@ It is suggested that a 150mm layer of sub-base be provided under all concrete slabs.
The sub-base material should be compacted to a density not less than 95% of maximum
dry density in accordance with AS.1289 5.2.1 (Modified compaction). The sub-base is
provided under a concrete slab to:-
* Provide a stable 'working platform' on which to operate construction equipment;
° Facititate the provision of a uniform bearing surface under the slab.
Sub-base material should be of good quality conforming to requirements (minimum) of
Material Type 2.4 as specified in the Queensland Department of Transport, Standard
Specification MRS 11.05, Unbound Pavements (December, 1999).
TT
ZH SOIL SURVEYS ENGINEERINGSection 29
Project No. 306-2474
November, 2006 Page 9
6.6 Retaining Walls
6.6.1 General
It is understood that retaining walls would be required to retain the sand material in order
to construct the basement ground floor platform. We understand the expected maximum
retained height will be in the order of 4.5 metres. Retention systems should be designed
in accordance with AS 4678-2002 'Earth Retaining Structures’.
6.6.2 Pressure Distribution
The lateral earth pressure from the active pressure wedge, where:-
P = 0.5 KH?
P = active force resultant acting at a height of H/3
from the base (kKN/m run of wall) @
V4 = density of sand, kN/m?
Hi = height of wall (m)
Ks = active pressure coefficient
Until the base of the wall is prevented from inward movement by the strutting action of
the basement floor, the resistance of movement is provided by the friction of the soil
beneath the base slab, and by the passive resistance of the soil against the vertical face
of the toe of the wall. The intensity of passive resistance can be calculated from:-
P = 0.5 Kp ¥ H2?
Kp = Passive pressure coefficient
Hz = front face of wall contributing to passive resistance (m) @
The lateral pressure distributions shown in Figure 2 includes hydrostatic pressure and
show typical surcharge loadings pressure distribution. Due to possible long term
problems with blocking of gravel filters and drains and short term storm conditions that
could flood the fill behind retaining walls, it is recommended that all retaining walls be
designed for some water pressure distribution. A suggested water pressure distribution
for retaining walls on this site would be one third height water pressure.
For the calculation of sliding resistance, base friction for walls without a key may be taken
as tan (2/3 ©). If the wall has a shallow base key the shearing resistance may be based
on tan @. Refer to Table 4 for the friction angle of sand.
a
YF SOIL SURVEYS ENGINEERINGSection 30
. . Project No. 306-2474
November, 2006 Page 10
OTT ager 10
TABLE 4 RETAINING WALL DESIGN PARAMETERS
SSS BE VAL DESIGN PARAMETERS
°° “Material: © ** b ‘Density. | “oS: Barth Pressure Coefficient eee |p Long-Term.::"
poe Se SE (KNITS QP Kp | éDrairied
CompactedFil' | “19 [O41 | 058 | 2a | 25
| Fie a 027 [as 88 as
___tooseSand [47 | 033 | 050 | 300 | 30
Medium Dense Sand] “18 [0.20 | 048 [389]
Very Dense Sand | “22 | “021 [036 | 460] a0]
Note: 1: if fill is compacted against a retaining wall the actual earth pressure could exceed the
vertical pressure (ie. Ka > 1.0)
2: infers granular free draining material placed behind the retaining wall as a drainage
layer.
: TRIANGULAR DISTRIBUTION
EERE PT TRI BYU TION
Lateral Earth Pressure Lateral Pressure Due to Surcharge
" \ * *
Y
® - IN
K = appropriate earth pressure coefficent UDL Point Load or
H = Vertical height of the wall i ti
hw = Height of design water table Strip Footing
Y = Soil bulk density (kN/m3)
yw = Water bulk density (kN/m3) FIGURE 2
I
HF SOIL SURVEYS ENGINEERINGSection 31
Project No. 306-2474
November, 2006 Page 11
Page 11
7.0 LIMITATIONS
We have prepared this report for the use of QANTEC McWILLIAM, for design purposes
in accordance with generally accepted geotechnical engineering practices. No other
warranty, expressed or implied, is made as to the professional advice included in this
report. This report has not been prepared for use by parties other than YELLOW
OYSTER PROPERTIES or QANTEC McWILLIAM. It may not contain sufficient
information for purposes of other parties or for other uses.
There are always some natural variations in subsurface conditions across a site, which
cannot be fully defined by investigation. The samples taken and used for laboratory
testing are representative of site conditions. It is however unlikely that the measurements
and values obtained from sampling and testing during the investigation will represent the ©
extremes of conditions that may exist within the site. Hence, it is recommended that if
ground conditions encountered during construction Significantly differ to those described
in this report, further advice should be immediately sought from Soil Surveys
Engineering.
Soil Surveys Engineering offer a documentation review service to verify that the intent of
geotechnical recommendations is properly reflected in the design. It is recommended that
the client avail themself of this service; our standard rates will apply.
_R. COSH (RPEQ 1821 B. W. EGEN
PRINCIPAL ENGINEER GEOTECHNICAL ENGINEER
for and on behalf of
SOIL SURVEYS ENGINEERING PTY LIMITED
SRR SERVE To ENGINEERING PTY LIMITED
TT
YF SOIL SURVEYS ENGINEERINGSection 32
" Project No. 306-2474
November, 2006
eee
APPENDICES —.
OSS
ZY SOIL SURVEYS ENGINEERINGSection 33
Project No. 306-2474 |
November, 2006
Toe
APPENDIXA sO
. NOTES RELATING TO THIS. REPORT |}
©
= SOIL SURVEYS ENGINEERINGSection 34
a a ss eee
NOTES RELATING TO THIS REPORT
SS ee
f Cc N
INTRODUCTION Table 1 Estimated strength descriptions given to rock
These notes are provided by Soil Surveys Engineering based on engineering examination
Pty Limited (the Company) to complement the RS ge
. ; . . ; Strength Term Approximate Qu (MPa)
geotechnical report in regard to classification methods | |. - se a snmssucn it ota fe at en eon |
and field procedures. Not all notes are necessarily Extremely Weak
relevant to all reports. Very Weak p 0-80
The ground is a product of continuing natural and 50-25
man-made processes and therefore exhibits a variety Medium Strong 25-50
of characteristics and properties which vary from place
to place and can change with time. Geotechnical | Seong 0-10
Stron
engineering involves gathering and assimilating limited Very Strong 100 - 250
facts about these characteristics and properties in Extremely Strong
order to understand or predict the behaviour of the Ref ISRM "Suggested Methods for the Quantitative
ground on a particular site under certain conditions. Description of Discontinuities in Rock Masses"
This report may contain such facts obtained by descriptive terms regarding weathering (AS1726-1993
@ inspection, excavation, probing, sampling, testing or Table A9), strength (refer Table 1
other means of investigation. If so, they are directly below), defects (AS1726-1993 Table A10), etc. Where
relevant only to the ground at the place where and at strength testing (ie Point Loads) is carried out,
the time when the investigation was carried out. AS1726-1993 Table A8 is used. Where relevant
DESCRIPTION AND CLASSIFICATION METHODS CLASSIFICATION METHODS further information regarding rock classification is
Soils - The methods of description and classification of attached.
soils and rocks used in this report are based on SAMPLING
Australian Standard 1726-1993 (Geotechnical Site Sampling is carried out during drilling or from other
Investigations), where appropriate. In general, excavations to allow engineering examination (and
descriptions cover the following properties - soil or rock laboratory testing where required) of the soil or rock.
ype, colour, structure, strength or density, and Disturbed samples taken during drilling provide
inclusions. Identification and classification of soil and information on plasticity, grain size, colour, moisture
rock involves judgement and the Company infers content, minor constituents and depending upon
accuracy only to the extent that is common in current sample disturbance, (information on strength and
@ geotechnical practice. structure)
Soil types are described according to the dominant Undisturbed samples are taken by pushing a thin
Parlicie size and behaviour as set out in AS walled sample tube, usually 50mm diameter (U50), into
1726-1993. the soil and withdrawing it with a sample of the soil
Cohesive soils are classified on the basis of strength contained in a relatively undisturbed state. Such
(consistency) either by use of hand penetrometer, samples yield information on structure and strength,
shear vane, laboratory testing or engineering and are necessary for laboratory determination of
examination. The strength terms are defined in shear strength, volume change potential and
AS1726-1993 Table A4. compressibility. Undisturbed sampling is generally
Non-cohesive soils are classified on the basis of effective only in cohesive soils.
relative density usually based on_ insitu testing or Details of the type and method of sampling used are .
engineering examination (see AS1726-1993 Table AS). given on the attached logs.
Rocks - Rock types are classified by their geological
names (AS1726-1993 Table A6), together with
oOo $5 eee
NOTEREP.SAM SOIL SURVEYS ENGINEERINGSection 35
-2-
INVESTIGATION METHODS rods and the soil or casing, carrying the drill cuttings.
The following is a_ brief summary of investigation | Only major changes in stratification can be determined
methods currently adopted by the Company and some | from the cuttings, together with some information from
comments on their use and application. "feel" and rate of penetration. More accurate
Test Pits - These are normally excavated with a | information on soit strata is gained by regular testing
backhoe or a tracked excavator, allowing close | and sampling using the Standard Penetration Test
examination of the insitu soils if it is safe to descend | (SPT) and undisturbed thin walled tube samples (U50).
into the pit. The depth of penetration is limited to about | Mud Stabilized Drilling - Either Wash Boring or
3m for a backhoe and up to 6m for an excavator. | Continuous Core Drilling can use drilling mud as a
Limitations of test pits are the problems associated | circulating fluid to stabilize the borehole. The term
with disturbance and difficulty of reinstatement and the | “mud” encompasses a range of products ranging from
consequent effects on close-by structures. Care must | bentonite to polymers such as Revert or Biogel. The
be taken if construction is to be carried out near test pit; mud tends to mask the cuttings and reliable
locations to either Properly recompact the backfill | identification is only possible from regular intact
during construction or to design and construct the sampling (eg. from SPT and US50 samples) or from ©
Structure so as not to be adversely affected by poorly | rock coring, etc.
compacted backfill at the test pit location. Continuous Core Drilling - A continuous core sample
Hand Auger Drilling - A borehole of 50 to 100mm | is obtained using a diamond or tungsten carbide
diameter is advanced by manually operated | tipped core barrel. Provided full core recovery is
equipment. Refusal of the augers can occur on a | achieved (which is not always possible in very weak
variety of materials such as hard clay, gravel or rock | rocks and granular soils), this technique provides a
fragments and does not necessarily indicate rock level. | very reliable method of investigation. In rocks, NMLC
Continuous Spiral Flight Augers - The borehole is | coring (nominal 52 mm diameter) is usually used with
advanced using 75 to 300 mm diameter continuous | Water flush. The length of core recovered is compared
Spiral flight augers, which are withdrawn at intervals to | to the length drilled and any length not recovered is
allow sampling or insitu testing. This is a relatively | Shown as CORE LOSS. The location of losses is
economical means of drilling in clays and in sands | determined on site by the supervisor. If the location of
above the water table. Samples are returned to the | the loss is uncertain, it is Placed at the top end of the
Surface by the flights or may be collected after | run, when the core is Placed in a storage tray and
withdrawal of the augers. Information from the drilling | fecorded on the tog. ©
(as distinct from specific sampling) is of relatively lower | Standard Penetration Tests - Standard Penetration
reliability due to remouiding, inclusion of cuttings from | Tests (SPT) are used mainly in non-cohesive soils, but
above or softening of samples by groundwater, or | can also be used in cohesive soils, as a means of
uncertainties as to the original depth of the samples. | indicating density or Strength. The test procedure is
Augering below the groundwater table has a lower described in Australian Standard 1289, "Methods of
reliability than augering above the water table. Various | Testing Soils for Engineering Purposes” - Test 6.3.1.
drill bits are attached to the base of the augers during | The test is carried out in a borehole by driving a 50mm
the drilling. The depth of refusal of the different bit | diameter split sample tube with a tapered shoe, under
types can provide information as to the Strength of the | the impact of a 63 kg hammer with a free fall of 760
material encountered. Generally two different bit types | mm. It is normal for the tube to be driven in three
are used. The V' bit is a V shaped steel bit and the | successive 150 mm increments and the 'N’ value is
'TC' bit is a tungsten carbide tipped screw type bit. taken as the number of blows for the fast 300 mm, the
Wash Boring - The borehole is usually advanced by a | upper 150 mm_ being neglected due to possible
rotary bit with water or fluid pumped down the hollow } disturbance from the drilling method. In dense sands,
drill rods and returned up in the space between the | very hard clays or weak rock, the full 450 mm
NOTEREP.SAM SOIL SURVEYS ENGINEERINGSection 36
-3-
penetration may not be practicable and the test is difficult, but intermediate values (between 1% and 3%)
discontinued at a reduced penetration. would be expected. Highly organic clays and peats
In the case where full penetration is obtained with generally have a friction ratio in excess of 5%.
successive blow counts for each 150 mm of, say 4,6 Static cone data is recorded in the field on disc for later
and 7 blows, the record shows, presentation using computer aided drafting.
4,6,7 N= 13 The equipment can be operated from any conventional
In a case where the test is discontinued short of full drill rig. A total apptied load in the range of 4 to 10
penetration, say after 15 blows for the first 150 mm tonnes is required for practical purposes, although
and 30 blows for the next 40 mm, the record shows: lighter loads may be used. The cone penetrometers
15, 30/40mm are available with various capacities of cone resistance
The results of the test can be related empirically to the ranging up to 100 MPa for general purpose
engineering properties of the soil. investigations, while a range of 0 to 10 MPa can be
Occasionally, the drop hammer is used to drive 50mm used where more sensitive investigations of soft clay
diameter thin walled sample tubes (U50) in clays. In | are required.
such circumstances, it is noted on the borehole logs. The cone resistance value provides a continuous
@ A modification to the SPT test is where the Same | measure of soil strength or density, and together with
driving system is used with a solid 60° tipped steel | the friction ratio, provide very useful indications of the
cone of the same diameter as the SPT hollow sampler. | presence of narrow bands of geotechnically significant
The solid cone can be continuously driven for some layers such as thin, soft clay layers or lenses of sand
distance in soft clays or loose Sands, or may be used | which might otherwise be missed using conventional
where damage would otherwise occur to the SPT. The drilling methods.
results of this Solid SPT are shown as "N." on the The lithology of the encountered soils is interpreted
borehole logs, together with the number of blows per from static cone data and is generally presented on the
150 mm penetration. static cone log sheets.
Cone Penetration Tests - Test Method - Cone | It is important to note that the lithology is interpreted
Penetration Tests (CPT) are carried out in accordance | information and is based on research by Schmertmann
with AS 1289 Test 6.5.1-1977, using an electrical | (1970), Sanglerat (1972), Robinson and Campinalli
friction-cone penetrometer. (1986), modified to suit local conditions as indicated by
The test essentially comprises the measurement of | borehole information and laboratory testing.
resistance to penetration of a cone of 35.7 mm As soils generally change gradually it is sometimes
@ diameter pushed into the soil at a rate of 10-20 mm per | difficult to accurately describe depths of strata
second by hydraulic force. The resistance to changes, although greater accuracy is obtained with
penetration is recorded in terms of pressure on the end the static cone compared with conventional drilling. In
area of the cone (cone resistance, Qc, in MPa) and | addition, friction ratios decrease in accuracy with low
friction on the side of the 135 mm long sleeve | cone resistance values, and in desiccated soils. As a
immediately above the top of the cone (friction result, some overlap and minor discrepancies may
resistance, f;, in kPa). These forces are measured by | exist between static cone and nearby borehole
electrical transducers (strain gauges) within the cone information.
device. The ratio between friction resistance and cone | Portable Dynamic Cone Penetrometers - Portable
resistance is also calculated as a percentage, ie.- Dynamic Cone Penetrometer (DCP) tests are carried
Friction Ratio (FR) = eee este rece ls (KPa) x 100 out by driving a rod into the ground with a falling weight
The friction ratio, FR, is generally low in sands (less hammer and measuring the blows for successive
than 1% or 2%) and generally higher in clays (say 3% 100mm increments of penetration.
or more). The interpretation of sandy clays, clayey
sands and material with a high silt content is more
NOTEREP,SAM SOIL SURVEYS ENGINEERINGSection 37
. 4.
The DCP comprises a Cone of 20 mm diameter with | >The use of water or mud as a drilling fluid wit! mask
30 degree taper attached to steel rods of smaller | any groundwater inflow. Water has to be bailed out of
section. the bore and mud must be washed out of the hole or
The cone end is driven with a 9 kg hammer falling 510 | "reverted" if water observations are to be made.
mm (AS. 1289 Test 6.3.2). The test was developed | More reliable measurements can be made by use of
initially for pavement subgrade investigations, and standpipes which are read after stabilizing at periods
empirical correlations of the test results with California | ranging from several days to perhaps weeks for low
Bearing Ratio have been published by various Road permeability soils. Piezometers, sealed in a Particular
Authorities. The Company has developed their own Stratum, may be advisable in low permeability soils or
correlations with Standard Penetration tests and | where there may be interference from perched water
Density Index tests in sands. tables or surface water.
LOGS FILL
The borehole or test pit logs presented herein are an The presence of fill materiats can often be determined
engineering and/or geological interpretation of the only by the inclusion of foreign objects (eg. bricks,
subsurface conditions, and their reliability will depend | steel, etc.) or by distinctly unusual colour, texture or @
to some extent on the frequency of sampling and the | fabric. Identification of the extent of fill materials will
method of drilling or excavation. Ideally, continuous | also depend on investigation methods and frequency.
undisturbed sampling or core drilling will enable the | Where natural soils similar to those at the site are used
most reliable assessment but is not always practicable | for fill, it may be difficult with limited testing and
or possible to justify on economic grounds. In any sampling to reliably determine the extent of the fill.
case, the boreholes or test pits represent only a very | The presence of fill materials is usually regarded with
small sample of the total subsurface conditions. caution as the possible variation in density, strength
The attached explanatory notes define the terms and | and material type is much greater than with natural soil
symbols used in preparation of the logs. deposits. Consequently, there is an increased risk of
Interpretation of the information shown on the logs, | adverse engineering characteristics or behaviour. If
and its application to design and construction, should | the volume and quality of fill is important to a project,
therefore take into account the Spacing of boreholes or | then frequent test pit excavations are preferable to
test pits, the method of drilling or excavation, the | boreholes.
frequency of sampling and testing and the Possibility of | LABORATORY TESTING
other than “straight line" variations between the Laboratory testing is normally carried out in ©
boreholes or test pits. Subsurface conditions between accordance with Australian Standard 1289 "Methods of
boreholes or test pits may vary significantly from Testing Soil for Engineering Purposes". Details of the
conditions encountered at the borehole or test pit | test procedure used are given on the individual report
locations. forms and the attached explanatory notes summarize
GROUNDWATER important aspects of the Laboratory Test Procedures
Where groundwater levels are measured in boreholes, | adopted.
there are several potential problems. ENGINEERING REPORTS
«Although groundwater may be present in lower Engineering reports are Prepared by qualified
permeability soils, it may enter the hole slowly or | personnel and are based on the information obtained
perhaps not at all during the time the hole is open. and on current engineering standards of interpretation
*A localized perched water table may lead to an | and analysis. Where the report has been Prepared for
erroneous indication of the true water table. @ specific design proposal the information and
*Water table levels will vary from time to time with | interpretation may not be relevant if the design
seasons or recent weather changes and may not be | Proposal is changed. If this happens, the Company will
the same at the time of construction,
NOTEREP.SAM SOIL SURVEYS ENGINEERINGSection 38
-5-
be pleased to review the report and the sufficiency of | in this regard and/or to make additional report copies
the investigation work, available for contract purposes at a nominal charge.
Every care is taken with the report as it relates to | REVIEW OF DESIGN
interpretation of subsurface conditions, discussion of | Where major civil or structural developments are
geotechnical aspects and recommendations or proposed or where only a limited investigation has
suggestions for design and construction. Since the been completed or where the geotechnical conditions/
test sites in any exploration represent a very small | constraints are quite complex, it is prudent to have a
Proportion of the total site and since the exploration | joint design review which involves a_ senior
only identifies actual ground conditions at the test sites, | geotechnical engineer. We would be happy to assist in
even under the best circumstances actual conditions | this regard as an extension of our investigation
may vary from those inferred to exist. No responsibility | commission.
is taken for:- SITE INSPECTION
+ Unexpected variations in ground and/or groundwater The Company will always be pleased to provide
conditions. engineering inspection services for geotechnical
*Changes in policy or interpretation of policy by | aspects of work to which this report is related.
@ Statutory authorities. i} Site visits during construction to confirm reported
* The actions of other persons. ground conditions
*Any work where the company is not given the | ii) Site visits to assist the contractor or other site
opportunity to supervise the construction using the } personnel in identifying various soil/rock types such as
Companies designs/recommendations. appropriate footing or pier founding depths, the stability
If differences occur, the Company will be pleased to | of a filled or excavated slope: or
assist with investigation or advice to resolve any | iii) Full-time engineering presence on site.
problems occurring. In the vast majority of cases it is advantageous to the
SITE ANOMALIES principal for the geotechnical engineer who wrote the
In the event that conditions encountered on site during | investigation report to be involved in the construction
construction appear to vary from those expected from | Stage of the project.
the information contained in the report, the Company
requests that it immediately be notified. Most
problems are more readily resolved when conditions
@ are exposed than at some later stage, well after the
event.
REPRODUCTION OF INFORMATION FOR
CONTRACTUAL PURPOSES
Attention is drawn to the document "Guidelines for the
Provision of Geotechnical information in Tender
Documents”, published by the Institution of Engineers,
Australia. | Where information obtained from this
investigation is provided for tendering purposes, it is
recommended that ail information, including the written
report and discussion, be made available. In
circumstances, where the discussion or comments
section is not relevant to the contractual situation, it
may be appropriate to prepare a specially edited
document. The Company would be pleased to assist
NOTEREP.SAM SOIL SURVEYS ENGINEERINGSection 39
2 ’
geqr Soil Surveys Engineering Pty. Limited LEGEND SHEET
| \jeg TE ee
ADS, tL TF Level 212 Finchley Stroal Unt #39 Lawrence Dr 1) Production Ava
+ a” Ree HMikon 0 4004 Nerang O 4211 Kewars Walers Q 4573
Lisl? POEM, a, mee Sa, BOBS ag -
LIS VM ES, Facrrsseais Fan Sag
Information :
a Graphic Legend
DRILLING TYPES
V - open hole drilling using augers and a steel *V" bit
TC - open hole drilling using augers and a Tungsten Carbide bit 3
WB - wash boring using a drag or blade bit CH - CLAY of high plasticity
RR - wash boring using a tes corer bit \N
NMLC - coring using a NMLC core barre QQQQ . . “a
Casing - steel casing in hole WN CI - CLAY of intermediate plasticity
DEPTH N wa
Expressed in metres below the surface unless otherwise noted NN CL CLAY of low plasticity
ROCK DESCRIPTION a MH - SILT of high plasticity
Rock name, grain size, colour, texture, fabric and any other relevent comments Ba eis
WEATHERING GRADES Y YH MI - SILT of intermediate plasticity
XW - Extremely Weathered is $5
DW - pistnally Weathered Gi, ML - SILT of low plasticity
SW - Slightly Weathered lf Le, :
FR - Fresh : Pt- PEAT
STRENGTH os < WS
Ew. extremely weak <1.0 MPa WS plasicity “ ” oe ,
estimate o: } OH - Organic SILTS and CLAYS of high
Md eee peo Mis MPa RQ OL - Organic SILTS and CLAYS of low
MS - medium strong 25 to 50 MPa BS SJ Plasticity
S - strong 50 to 100 MPa KWAN SC-Clayey SAND
VS - very strong 100 to 250 MPa INS SS .
ES -.extremely strong >250 MPa LD SM - Silty SAND
CORING DETAILS 4
Rec - core recovery in each run expressed as a % Ey SP - poorly graded SAND
RQO - Alock Quality Description expressed as a % nian
Defect Description SW - Well graded SAND
3.00m;J45;p,s,0,z Ras GC- Clayey GRAVEL
Depth in metres; Defect Type and angle with the core axis:planarity roughness, aperture, infill Bosna a |
Detect Type Planarity Roughness Aperture Infill ee GM - Silty GRAVEL
J+ Joint p-Planar = s-Smooth o-Open = _z- Clean eae
F - Foliation S-Sub-planar r- Rough c-Closed c- Clay Ropayesy GP - poorly graded GRAVEL
8 : Bedding c- Gurvilinear v “yen Rough g - Quartz PO oe
- Vein u-Undulating $ - Slickensides - Calcite [ovod .
S - Shear Zone w - Weathered Rock GW -well graded GRAVEL
T- Fault { - Limonite ROK
C- Clay Seam Kosogseoesd Fill
2 - Contorted Zone S54
RJ - Relict Joint | | Core loss
Testing
He Phyllite
[ 10,15,15 Blows? Samm ot as noted er sugions
spr SPT testing Ft Mew sil
a Meta-Sandstone
US50 (50) USO Tube Samples (% Recovery) ee “we
0 U G k
PP = 500 kPa Pockst panotrometer reading °
~ ve
VS Vane Shear Testing on
g”s_:1,30,5: 25 Sealing, peak and residual : Correctad value Sandstone
[ DIST Disturbad Samples Siltstone :
{
— Co Mudstone
ft
. Conglomerate .
Water Intersections f
Nor Water steady level v = =
aor Water first noted + + + com
Testing Results VOLCANIC ASH
Corrected Point Load Test Resut nee
__ 1550=4 (A) A- Adal, D- Diamatral VOLCANIC AGGOLMERATE
. ABRABA
| | MARINE DEPOSITS
| ISSUE No. 1.1 08/10/97 RSO0S
iSection 40
Project No. 306-2474
November, 2006
eee
. . ».. + APPENDIX'BD.. | -- I
oT BOREHOLE RECORDS. a TW
Ta
Y SOIL SURVEYS ENGINEERINGSection 41
[ gry 20!l Surveys Engineering Ply. Limited ~ BOREHOLE RECORD SHEET
LDF gene y “nal brsbae solswoye com ou B h I N b . 1 ;
GY BE eames ieee orehole Number: ,
UGLY EE Bas Rion. Project Number: 306-2474
- Project Name : Duplex Residence
Easting : Northing BL: Location : Cnr Bryan & Ferguson Sts., Sunshine B
Logger: RB Driller: RB Dilling Rig: Jacro200 Client Yellow Oyster roperties
ient : P i
Date : 19/11/2006 Page : 1
2 DCP Test
7 Depth ] 6 Description (blows/100mm) Samples and
>| +] =| 2/3 6 5 10 15 20 25 Remarks
0.02 Rance \ Asphalt 0s fob
cs KKK] FILL Siity Sandy GRAVEL (GM) Very dense, fine to jot ft rt
rf PSseoy Medium size, brown, some coarse size gravel, fine nieve
fs 0.30 Px] to medium grained sand, moist. - REGRESS |
F 0.40 44 NATURAL Silty SAND (SM) Dense, fine 1 mediam Renee |
L grained, grey, mo - pared eee ' '
: eo Silty SAND (SM) Dense, fine to medium grained, grey ee |
, | Ye brown, moist. _ ‘
. 0.65 Z] ee
* ie Silty SAND (SM) Very dense, fine to medium grained, io rot Y
Oe dark brown, moist. , rr
i oy por oto
! “8 YZ pei
‘ 110 ZA tf
Ve Silty SAND (SM) Dense, fine to medium grained, TN ese :
‘ Y orange brown, moist. © ob Fok
| : 1.55 Y we
ee Silty SAND (SM) Very dense, fine to medium grained, eee: 6)!
. YG dark brown, moist. / eee) a ' it
: 20 Y Pei
: 2.30 yy, por or gy
: Le, Silty SAND (SM) Medium dense to dense, fine to boro ror
; YZ medium grained, streaked orange brown, moist. re
Y a
3.0 Y aC
3.20 i) PE ddd
Vr Silty SAND (SM) Medium dense, fine to medium fof oy tk
Y) grained, grey brown, moist. rot 4
40 | y) PE pd
. sp Z Poof foto
Borehole 4.50m PoE ob
Terminated Pot oy bg
COMMENTS OF
| 1) Groundwater not observed. 2) DCP Refusal at 0.6m, 1.2m and 2.0m. (i
. Approved fie
Date: __ ey ttf we
i ISSUE No. 1.1 0810/07 RSOO7ASection 42
[ ex ‘Soil Surveys Engineering Pty. Limited BOREHOLE RECORD SHEET
. Ma eT rar email beiabene® sclarveya com. eu .
‘ Os ene eg, aR Barrmesen
Sif Bao? Level 2 19 Finchtoy Sirsa Unt 9 30 Lawronce Or 1) Production Ave Borehole Number : 2
KA Ave | RR, RESET Project Number: 306-2474
Project Name : Duplex Residence
Easting : Northing : RL: Location : Cnr Bryan & Ferguson Sts., shi
ion: s., Sunshine B
Logger: RB Driller: RB Drilling Rig : Jacro200 Client Yellow Oyster Prop
ient : er Properties
Date : 19/11/2006 Page : i
2 DCP Test
$ Description (blows/100mm) Samples and ;
|| 2] /3 |} G 5 10 15 20 25 emarKs |
A xd FILL Silty SAND (SM) Loose, fine to mediam grained, ee
in BOS grey brown, moist. i) toe f
4 XXX] 1 ' ’ ' , |
é Poser
j Rose me; or or bt
; Roe mo; i i
Fi BX Se, 6; ltl Uc i
5 Bees eB of or Gg |
: SoS SoS ’ ' ’ ' ' [
, eee }
y PSs PoP Pog
; 075 Bees Por ft
POO a 1 1 1 »
« oOo ' ' t ' '
Ke] FILL Silty SAND (SM) Loose. fine to medium grained, rotor or
. KXXx streaked brown, some clay fines, moist. i $ go [email protected] Se PobotoG |
S500 ee
x 1.05 REX por eg
18 WO NATURAL Clayey SAND (SC) Loose, fine to medium poror ft
: 1.20 aN grained, orange brown streaked brown, low to medium ee
' a plastici O moi t ' ' ' {
1& y Silty SAND (SM) Loose, fine to medium grained, Bitte
| Z orange brown, moist. Be
F 1.50 La mss
y oe Silty SAND (SM) Dense, fine to medium grained, ae |
é Y orange brown, moist. ro of 44 t ,
lE 20 Y PEt i | )
| : Y) Sa
2 2.30 ¥ ye RecA
Le, Silty SAND (SM) Very dense, fine to medium grained, ea eat :
| ° i“ dark grey and brown, moist. a
| Y) Pb ds
2° Y Pid
3.30 Ey) Poboiob
. Z Silty SAND (SM) Dense, fine to medium grained, pop oor
. Y) brown, moist. ' : ‘ ' ‘
1 40 Y PPG bg
: £50 iy ee
Borehole 4.50m Popo ford
Terminated PoP ob
5.0 bobo tote
.|COMMENTS ,
1) Groundwater not observed. 2) DCP Refusal at 1.6m and 2.4m. SL
Approved fo ___—
Date: 4 By! poe
| ISSUE No. 1.1 C8097 ASGOTASection 43
[ gy Soil Surveys Engineering Pty. Limited HAND AUGER RECORD SHEET
FES Cocmming Sectacheical enginsore RPECO Mo, 195
M p us 4 iy Cnak beatere Ocotatny CT
CPLGT wes vtarrcin ae tn rca {iPod ne Hand Auger Number :3
ce fiat a Paonia ase Noe oO bose asm .
CE: tA SLY Fe eee, Face asta'Saty | PRS Ta3 ran Project Number: 306-2474
ety ue . ;
fee Project Name : Duplex Residence |
Easting Northing : AL Location : Cnr Bryan & Ferguson Sts., Sunshine B :
Logger: CT Driller: CT — Machine:- Hand Auger Client: Yellow Oyster Properties
Date : 19/11/2006 Page : 1
Depth & Description (blows/100mm) Samples and
DCP Test
o 5 10 15 20 25 Remarks
Y NATURAL Silty SAND (SM) Loose, fine to medium grained, grey brown, ee
= 930 We pdt
moist. roy ye tl
_ VW Silty SAND (SM) Medium dense, fine to medium grained, grey brown, RB ok ot
0.50 YY moist. Be
! Y) | coon
| ) Pia
| ) Pb
1.00199 KZA Pid dd
We Silty SAND (SM) Medium dense to dense, fine to medium grained,
ZY orange brown, moist. fof of obo
1.40 ZY me
1.50 1 so ZA Silty SAND (SM) Dense, neo medium grained, orange brown, mont it
Hand Auger Terminated 1.50m ‘ 7 ae i ot }
200 as
2.50 PPoi og
—™ Pads |
E350 Pig dl
F 4.00 Pid dG |
Pot boy
Poboypogps |
Pha, |
450 PoP AE |
poboroG i
ropor tod
) oe |
F_5.00 Pid i
COMMENTS ;
1) Groundwater not observed. 2? ae~ ;
Approved :
Date : ft o6,
{ ISSUE No. 1.1 0810/97 RSODEA |, .Section 44
" * Broject No. 306-2474
November, 2006
eee
. « APPENDIXE sf]
_ , LABORATORY TEST RESULTS - ||
Ca
H- SOIL SURVEYS ENGINEERINGSection 45
SOIL ¢? WATER p=: =F 3 .
LABORATORIES PTY LID ———
5/16 O'SHEA DRIVE —<——
NERANG QLO 4214 Se ie :
PHONE 07.55004666 Deere re es
FAX 07 -S5004677 soi] and water
LABORATORIES
Quality of Materials Report
Client: SOIL SURVEYS ENGINEERING PTY LTD - KAWANA Report Number: SL6799
Client Address: 11 PRODUCTION AVENUE KAWANA WATERS QLD 4575
Job Number: 306-2474 Report Date: 27/11/2006
Project: DUPLEX RESIDENCE Order Number: -
Location CNR BRYAN AND FERGUSON ST, SUNSHINE BEACH Page lofi
Lab No: SL6799 Sample Location
Date Sampled: 19/11/2006 Allotment No :
Date Tested: 22/11/2006 Offset :
Sampled By: CLIENT Location :BOREHOLE 1
Sample Method: AS SUPPLIED Level! :0.65m
Material Source: UNKNOWN Spec Description: -
For Use As: UNKNOWN Lot Number: -
Remarks: - Spec Number: -
A.S. Sieve Sizes Specification Percent Specification
Minimum Passing Maximum
Test Method: AS1289.3.6.1
oa Pee eye EE }_____75.00 mmf
SESE EEE | __ 83.00 mm|
| ert 37.50 mmf
ss
po 2650 en
‘ dT eet ec
Pe ee |___ 19.00 mmf
1s.
*
Ree eo Pp 83.2 mf
&.
Lt eee
= &)
[EI Seo | —__ 9.50 mmf
ret 6.2 mmf
s =
i oO ee
eee | 8.25 mmf
* or | 2.36 mmf
. PES oe
| Eee et 4.18 mmf 00
D
Se ae ee a a ht 0.600 mmf 99 @
uy
; are | ___ 9.425 mmf ps
Ree }—___ 0.300 mmf es
Pt ee eS } 0.180 mmf
f fb tre ree re ror re ¢
BE amie FREER 9.075 mmf tp
_ pe
Atterberg Tests Test Method Specification Specification
Minimum Maximum
Liquid Limit (%) pT
Plastic Limit (% pp
Plasticity Index po
Linear Shrinkage (%) pT
woe This Laboratory is accredited by the National Approved Signatory Form Number
NATTA test(s) reported herein have been performed in Boe
Association of Testing Authorities, Australia. The / /
yo accordance with its scope of accreditation. This REP ASQ UAL-1-35
WonLO aucausuene document shall not be reproduced, except in full. CHRISTOPHER LO
ACCREDITATION NATA Accred No:15301Section 46
“ Project No. 306-2474
November, 2006
eee
. s APPENDIXD = = ©.
CI
Y- SOIL SURVEYS ENGINEERINGSection 47
FERGUSON STREET
O- hy BH?
BH3 a
_
o., Fa
go
. BH1 x
oc
DRAWN exh SUIL SURVEYS ENGINEERING
BWE ee sare weyers ENGINEERING PTY LTD
DA TE CONSUL TING GEOTECHNICAL ENGINEERS .
30 NOV o6 | SITE PLAN DRAWING NO
CHECKED CNR. BRYAN & FERGUSON STREETS 306-2474-0
yf SUNSHINE BEACH a4Section 48
eK a
Z..
Coast Apartments
Cnr Bryan & Ferguson Streets, Sunshine Beach, Noosa
Drawing Issue Sheet
G.12 832-BA40
Sole KN! id ood
os
oO Oo
| ete i lo. IS.a| Joe
|OwgNo. =_DrawingTitle _., Size Scale 8.3) 0
G.12 BA.32 ‘Planting Scheme - 1(north) AS 1:200, =A A,
G12 BA33 Planting Scheme -i(south) — A3 _1:100, : A AL a | ' .
. +—— ++. — +——- a np 4 + |. ++. 4
G12 "BA.34 [Planting Scheme -2(north) | AS t100° ATA; [|
@ /G.12 BA.35 Planting Scheme -2south) = AB 1100, AAT :
| G12 BA36 |Ground Cover -t(north) =| AB 1100 FATAL | pg
| G.12_BA.37 Ground Cover - 1 (south) _ AS 17000 ALA. ae
G12 BA.38 |Ground Cover-2 (north) AZ 1100 JAAD TG | |
_G.12 BA39 Ground Cover-2(southh == A3 1:100 “A A! 2 |. |
G.12 'BA.40 [Notes and Planting Schedule | AS - | [A Al Joo |
a GO
— P TE ae EE nt
__ _ L
Issued : \Client - Bob & Jill Goode la ag Fe TE
E = Emailed Town Planner - Dillon Folker Stephens OT nee: roa
F=Faxed _NoosaCouncl ~ Ptah ite
—_—— : ee — 4 : at t 4. - - —
Quantity Surveyor boi L y
a uantly surveyor _ ae ee, pe, fe
© Civil Structural Engineer-QMeW
_ ,Flect / Mech./ Lift. - RPG Consulting a , | pbk Le.
_. . —HydrauligEngineer-Con. Hyd gg gg PL.
——__ __ Building Certiiers - ed eee py Le
Record Copy Bark Design qo,
Status : For Information Only __ - _ YC Lok 1 7 |
- For Development Application (response to RFI) _ | | ! ] I
: _____.For Operational Works Application a YY. i .
_____|ForBuilding Apptication a ET
oe ForTender . -. oa bt by tebe
|For Construction 1 | i | foo ft
|Instruction No. poe rb bof oo
Bark Design Architects
PO Box 1355 - Noosa Heads - Queensland 4567 - Studio 185 Sunrise Road - Tinbeerwah 4563
107 5471 0340 © 07 54710343 wwww.barkdesign.com.au_& [email protected]
Bark Design Pty Ltd acn 101 764612 asn 30101 764 612Section 49
o
Use figured dimensions in preference
to scale. All dirmensions to be verified
tee, Lomandra longifolia ‘Tanika' planted in LQ] Existing trees and checked on site. These designs,
drawings specifications and the copy-
staggered rows at 400mm centres right thereof, are the property of Bark
Design Pty Ltd and must not be used,
retained or copied without the written
authority of Bark Design Pty Ltd.
BRYAN
STREET
New Tort
1 PAN-+tec
—_— — wi oO
3 Hi@sca ry a yf
«x! Oy ay arocks \ FOSTPary oy 3HIG sca New Turf?
Fon Rhea
47
A A er OE a Nes AEST [rr Lt in rocks
tt, ee
cx} Fy EPS Rae
Act ih
SOF = G Tt) Bt aR: 1 3 HiBsca i
ao 8,
Ct AG i AD Or ws Sivan
SO
eee, ft ihe oy rapa
f° og (fez) vy = Bhat RO 2.8,
Tika
On rt a A
Pett
nf Y rf (ho iy CS ON ay
0
eo Cy? i NY
iy
od f Ep \ 3 OIALE 2) yy
op e ib x
New Tort 2) rao Ch) [ { PAN tec
se; . i)
vo uy Ty in rocks tt} 2 EH / s¥-15.@ Design
ue 1 8 ()
iy QA
A 43 as
15 Ors
fa x?
Px)
Si QR oO Ls Architects
fo Che Gy ay) O IO rt
8 ant
ie fy in) ety
se eB) OF at) v/ 8 BABPbid Bark Design Pty Ltd
A wy
| AD Ft} A ACN 101 764 612
CD i) OO
ke) Gy) ‘t ABN 30 101 764 612
a) oe ay ee
ot 28. Cae et aR wh oY) PO Box 1355 Noosa Heads
a ie i) HY 39.33 s
a9, ~—
, tH 12 Queensland Australia 4567
i
2
2h eae coy i oe a (ts DRIVEWAY Telephone 07 5471 0340
OD aS) Lae te ( Facsimile 07 5471 0343
Mt tw A JD ¢,
2
bry 76 Steve Guthrie 0418 876 394
(Xo aA <a of me 4 SYZavus Lindy Atkin 0412 127 904
7)
cy
Cs Email [email protected]
cau
| PAN Nie=y. ee") al NG q SYZaus om omg mMenMeen RAIA member 28409
SHIR aN aus POOL oa Lol Architects Registration No.
owen, 3668 (SG)
oa
in rocks tS = GS DECK toa Project
a
et et Pt coast apartments
Li ery Pf
ft) as @" iY Al 30 ZOY ten Spaced wee ew eee ew wee for Yellow Oyster
ua) YY ih
ar Cy) tt es ee
ye 8 wt ry ad) 5 SiAlyt evenly through planting
Py oR,
rh) Ore Ot) Properties Pty Ltd
YOR
EX) aoe
So, 3 te t CPANtec. NY Ofea de. sl eee eee ee |
By) eh Se ee
AY
( “A QD
Rp
BX wa
ney Date November 2006
Aa
S77 J)” J ——
y -
YT
A? RY fi) 5 SYZavus
rig
ry ld POOL POOL TERRACE Drawing Title
te) Planting Scheme -
v)
‘os. DECK Apartment 1 Apartment 1 (north)
ro
rey
er
18)
Ta
ae a a Landscape Architect:
we “Landform"
RrS
PIO Oo OE SOROS
2
Project No.
G.12
| ~ ame | Brawing No. BA.32
wenn ee
Revision
ASection 50
Use figured dimensions in preference
to scale. All dimensions to be verified
and checked on site. These designs,
teil Lomandra longifolia ‘Tanika’ planted in Existing frees drawings specifications and the copy-
right thereof, are the property of Bark
staggered rows at 400mm centres Design Pty Ltd and must not be used,
retained or copied without the written
authority of Bark Design Pty Ltd.
BRYAN STREET
O/
®\ 7) oy
»/
<
\O New “Te rf ys
SN
3 Wiesca
DA. | ea in rocks So TRA Bark §8cSen
SET En
BO Kd ORE
Cr RETA 9n
fp IOS | Sea Architects
Cin > Le
ey
1 PAN tec LL eS) 6
i)
ihe Bark Design Pty Ltd
cae
bak? Cha ACN 101 764 612
Re
‘Tr we
ae, ABN 30 101 764 612
i
ie ae oF 26
9
i oo PO Box 1355 Noosa Heads
ys Queensland Australia 4567
Ph
DRIVEWAY rar CS Ce A _ i BRAa Telephone 07 5471 0340
Ws
~ Facsimile 07 5471 0343
A ts
5
LE CS) ary \ ™ Steve Guthrie 0418 876 394
ve “ =~ Lindy Atkin 0412 127 904
ix \ 8g Email [email protected]
yp ct] \+ eiZaus RAIA member 28409
ft
{) J x Architects Registration No.
10 BAB bid On HOMER 36 )
pha wl te Nw fe ER N\ mee, 3668 (SG)
a
% Project
N\ coast apartments
A)
om wa eee es wee we eee ete wae ee wns we LANE for Yellow Oyster
4 Properties Pty Ltd
’
weeev ee blll le ee eee ES
Ht a | = TERRACE cnt (S)
l l
——
> | Drawing Title
sam Planting Scheme -
Apartment 1 * | Apartment 1 (south)
Landscape Architect:
“Landform"
Praject No.
G.12
4), | Drawing No. BA.33
ee
= ~ le Revision ASection 51
—H+
Use figured dimensions in preference
«\ to scale. All dimensions to be verified
emcce ee ee) and checked on site. These designs,
drawings specifications and the copy:
right thereof, are the property of Bark
ME Design Pty Ltd and must not be used,
retained or copied without the written
POOL POOL TERRACE authority of Bark Design Pty Ltd.
DECK
Apartment 1
3 SyYZp
i! _——————— J
3 BABbid oF |
3 DtAkt | 4 G HYM spe
in rocks f 93%, ts ets iE, new eet | to
weer ee wae
ex
il Lis ORS LS $t11>
C14
EMEA YD IG
| . — —|— vit tt tT LU I <
'Scupsem
LL | ENTRY itt tH UPPER ll
SHARED TERRACE
f ZS
ZDIAL; HS WIZANS 7evesem Y | ff S¥-le.@ Design
{in ro
4 BABB ic Aya de EN r+ —f—-4
Ste {kN
pon) : wen Architects
eX
t SOs x : 3 : bos Me ? 1 CRI pen ACN 101 764 612
3 PAL lor, 4 A aig lay SS 7 RL 4+ CRipen Bark Design Pty Ltd
‘in rock RY CRI een (= ABN 30 101 764 612
jenna PO Box 1355 Noosa Heads
CACO ry 2, t 3 FOG pan Queensland Australia 4567
Pac OER | << } A&TReha At Apartment 2 Telephone 07 5471 0340
| CORabp Ott SZ A 2 ALPcae i |! POSGpan Facsimile 07 5471 0343
Steve Guthrie 0418 876 394
Biel A ee an | POOL POOL TERRACE Lindy Atkin 0412 127 904
iO BA Pe Email [email protected]
Tt)
RAIA member 28409
BN DECK | POGean Aschitects Registration No,
3664
MEMBER
e JO CHRram space’ LK ) ; mannan, 3668 (SG)
evenly through A) Project
Planting area 3 S¥Zzaus coast apartments
Z lq OPH jap ~~ t
3S v) ‘f at 200mm fee 40 Zov4 pla aki at eo for Yellow Oyster
ce Properties Pty Ltd
- oD
re
o y ft ATRcha 2 PO ror é 4 POG Pp cute |S)
ry) {Rk fr
NI 3 POG pan QL/ (i
aC) —- 2} AlPceae
™ OrKys | 25 Pas ec-_
ah zen & Di Albre-
3 YF NAR Drawing Title
poe @ “ff e/ c Sy | BO Ser ee a Planting Scheme -
rh
Apartment 2 (north)
iB af te
AX + POS HL |
vi?
ro
Q HT Landscape Architect:
ahi
“Landform"
0-] — Rehan Ce Project No.
LL
on re SED
G.12
2 ALP cae.
i (SY¥Zaws, lL Hym fla (451) Drawing No. BA.34
10 VIO hed Spaced evenly through Revision
Placrti ng wea ASection 52
! Ji | Use figured dimensions in preference
to scale. All dimensions to be verified
and checked on site. These designs,
drawings specifications and the copy:
right thereof, are the property of Bark
| Design Pty Ltd and must not be used,
retained or copied without the written
authority of Bark Design Pty Ltd.
“=
Apartment 1 ~ |
er
7
I HYM Lig
——
eee
ee & NUE
key JN} I CORabp
2
nee
[| | 2 O5}) || | AY 2. ALP cae oO } | |
ONE ~
LUFT SCciSant LOWER ES f
UPPER
SHARED TERRACE I SHARED TERRACE lil wi
Wan a 2. SPA wal he P cae
TS
(io) ax OS 2 ye stl. @ Design
en Q Lh
—————— By
Pd
4 PO&Gpan Cc | ty ACR imo ~~ Architects
Bark Design Pty Ltd
4 | ACN 101 764 612
=} ABN 30 101 764 612
SASF ela ( R imp PO Box 1355 Noosa Heads
Queensland Australia 4567
Apartment 2 { | M1 ACRiog LANE Telephone 07 5471 0340
Facsimile 07 5471 0343
Steve Guthrie 0418 876 394
Lindy Atkin 0412 127 904
TERRACE Wy I ALReae Email [email protected]
RAIA member 28409
1) LIRmos NUL b\ Architects Registration No.
ON 3668 (SG)
Sy
OW 2 ALL jie> Proj
Ni} > ; coast apartments
ONY | ALC o for Yellow Oyster
19 ViIOhed spac, evenly Properties Pty Ltd
j ow aus Ons throvah plardi ng area
ak, [ AcRimp vinta |S)
T+
S PHI xan NP ] ~ qt ALP eae.
ih
Cry
a,
N
es ew te eee ee He a . V+ iA Prac Drawing Title
TUT SAS SOAS CO LoS) EAL Sa N 35 Planting Scheme -
cae om f SS eS Apartment 2 (south)
» Y ¢ ,
( nD | Landscape Architect:
bed “Landform"
Foi 20 a a ES je ee” NA A VO ee
Sl
——73
Project No.
G.12
3 DiPavs SYZ. lve. 1 HM Fla 2SYZ lvoe 3SHIMLfia Drawing No.
BA.35
lO VIOhed spaced evenly
thre wah planting arsed Revision ASection 53
Ji) Use figured dimensions in preference
to scale. All dimensions to be verified
and checked on site. These designs,
drawings specifications and the copy
right thereof, are the property of Bark
Design Pty Ltd and must not be used,
tetained or copied without the written
authority of Bark Design Pty Ltd.
mene ~ |
Apartment 1
OG
7
I ENV lg
iF
=—_ ed
1 el ees “2 & Wy) 1 CORabp
| BS
= oe @ wer a 2. ALP cae.
'
LIFT i UPPER lI LOWER I) LY
[| Bcisant \
SHARED TERRACE lt SHARED TERRACE IIL Le &\ P cae
“li i 2 SPA wal ASEH OR ADP s¥-18.@ Design
VA OCD L \ Architects
(4 ty aceime >d Bark Design Pty Ltd
Le
4 POGpan ACN 101 764 612
BASP ela | ( Se ABN 30 101 764 612
PO Box 1355 Noosa Heads
Queensland Australia 4567
(| 5 *!ACRING LANE Telephone 07 5471 0340
Facsimile 07 5471 0343
Apartment 2 Steve Guthrie 0418 876 394
Lindy Atkin 0412 127 904
TERRACE Ny) XN Email [email protected]
} ALReae RAIA member 28409
HW} Limos Ab \ mem Architects Registration No.
= 3664
OMI Mareeins, 3668 (SG)
anni 2"
*
MY 2 ALP te Project
ap
Ny coast apartments
Nils [ALS o for Yellow Oyster
Bliss 1O ViIOhed spaced evenly Properties Pty Ltd
{Ow aus Des | throvah planting area ne (S)
an { ACR imp
;
tS SL ALP Ege
Le?
5 PHI xan NE
A Drawing Title
- wee ewe ert ee ee weer i N {A + Cac. 995 Planting Scheme -
Nd \- Apartment 2 (south)
fee Ne
FITS POURS FY OL SS S Landscape Architect:
aN af om »
2) TD |
( y +f] "Landform”
7} ——£ ae A
OTS STR Soe 7] La Se A Sk rn ee eee. ae Project No. G.12
4 DiPavs 2. SIZ \ve- bHIM+la 2S4Z lve BENMLIa Drawing No. BA.35
lo VIOhed spaced evenly Revision A
throvgh planting areaSection 54
Use figured dimensions in preference
75mm deep Hardwood Chip (30mm Turf - ‘Wintergreen’ Couch Grass Existing trees to be removed to scale. All dimensions to be verified
and checked on site. These designs.
no fines) with 150x150mm edging of (Cynodon dactylon) drawings specifications and the copy
20-40mm River Pebbles right thereof, are the property of Bark
Design Pty Ltd and must not be used
100mm deep compacted Gold colour 75mm deep Fine Forest Blend mulch Existing levels retained or copied without the written
authority of Bark Design Pty Ltd
Decomposed Granite (Deco)
Ors Bush Rocks with random-size River Existing frees to be retained - Finished levels
CAS Prune to shape and trim lower
Ee ae Pebbles
SOY e ranches where necessary
TQS
Exists. Wp — _ oo “at ESS Ss Sy o/
my
«' O\ 4h me Whee| ie
SSS Ao a aan Poe Footpet Paw for
eS ERIS
AIS
« G
|_| t whl hLowU HARE Ee inl
fo
os
re Fe Roy Sn Light Pole.
eS
Pe] |_| 9: BT PP Choe
ore FS
tt Fe 28 eCeeCCCLCCa Oe my = x4 st-lg.@ Design
SoS
PT tt } 4, ety J re Se @ Q) ae,
eit Tt | Ts a | \| A LAs = TV eu 9D Architects
oe | Perey tT i Sh ot qvu MD
| iS \-— a “| wn 2 Bark Design Pty Ltd
PAE TTT TE fend Ox pe Tt ey ACN 101 764 612
ie > 9 choca UO) PWT TT eT ABN 30 101 764 612
evar | NTT AS Qe ae PATA To Tg PO Box 1355 Noosa Heads
AR 4 Wap AA a
EC AK, SS TCC (x) Queensland Australia 4567
ie ant aS Zine core NS in | | ts ali IL, m3 — Telephone 07 5471 0340
‘G “nae NG 39.33 rt | — Facsimile 07 5471 0343
Pn Steve Guthrie 0418 876 394
d | aa Hy Le Ender <a A rt2 Ca5 DRIVEWAY Lindy Atkin 0412 127 904
| | Ww | | eS OES | | 3 Ts Email [email protected]
eR PY” yZ * ELE Te BIVi LY il te 7 | | =. RAIA member 28409
Architects Registration No
oY
aes Sa 3 LS 3879 amy ‘tat 3668 (SG)
wo 5
4 QE» hs PIN 3 1b Project
e ©] RCN <a POOL = NS coast apartments
Gay
29 Ww RR edo bad | Pool
Y) SD DECK _ 1 Equie for Yellow Oyster
cS > Ob:|) (6a) (AR P| Properties Pty Ltd
ISA)
wei ad Ne ie es a ed al Spee a YS Pd
io Lp tk TE
amr We [|
1p: = )} pees Ph sta ween ee eeee di... .-.-.--- cat (S)
yy
iZenN He AR P|
a ee
KO) pre SY lOry no Court
ere ey Ke 3 tt ———s Drawing Title
if
cf) Cy re Ground Cover -
aa
> | a V1 4 Apartment 1 (north)
ony
S| | a Dap, POOL POOL TERRACE
LN
| ab.s0 LA DECK Apartment 1 Landscape Architect
aS fp A \ "Landform
Stil [I
OSS
OT ae Ree Project No
shored. G.12
POS cS Seo Drawing No
ences caved BA.36
grandis 7 } ee Revision A
{~ wee eee
+Section 55
Use figured dimensions in preference
to scale. All dimensions to be verified
oo 75mm deep Hardwood Chip (30mm Bush Rocks with random-size River Existing trees to be retained - and checked on site. These designs
drawings specifications and the copy
no fines) with 150x150mm edging of Pebbles Prune fo shape and trim lower rignt thereof, are the property of Bark
Design Pty Ltd and must not be used
20-40mm River Pebbles branches where necessary retained or copied without the written
authority of Bark Design Pty Ltd
SSN Turf - ‘Wintergreen’ Couch Grass eo +9° O'S 75mm deep 20-40mm River Pebbles
oro
(Cynodon dactylon) oo oe
BRYAN STREE
Q Os
\ }
®\ << 2; y,
a /
\O a SRieting
aH Ex ‘Sting YSN
ART re Clete (eetpuan stl. @ Design
IS392 eS
OFS Mey ae Oh 5 =
ROT
foe mi] | | | Architects
oy | Hoch S SSS Bark Design Pty Ltd
AT | FIN SS ACN 101 764 612
| [Ret yt ABN 30 101 764 612
_— ee ———— — —— PTET TTT rey S$ ~ 36 PO Box 1355 Noosa Heads
~ Ati PR eH Queensland Australia 4567
pas By SS \ Facsimile 07 5471 0343
DRIVEWAY 1 eS ae ; SQ’ N Telephone 07 5471 0340
Steve Guthrie 0418 876 394
BOSSE SSS ~~ “N Lindy Atkin 0412 127 904
Email [email protected]
gi trt titties ™ ~ Prov Le { aad scaped 36 RAIA member 28409
Aechitects Registration No
: rit Ty tir tT i ei és ‘ bagh) track to beach nen i 3088 (SG)
Ti
1 | Project
et | i tt Ny coast apartments
—+ se ewe Lt | | wan wwe oe \l for Yellow Oyster
ja om - ~ ee eee RnR \ LANE Properties Pty Ltd
f..
-_- Tt) I
st TERRACE Wie fe leuca ss nt (S)
9 ni nrgengrv: at VP | Drawing Title
“st Ground Cover -
Apartment 1 wee * | Apartment 1 (south)
Landscape Architect
“Landform
ag 02286
an® 9 Project No
oe | oo O°0 Xo I~ ss) Drawing No G.12
26.9% BA.37
oa
i | ee ~ Revision A
“oOSection 56
Use figured dimensions in preference
,
aA ' to scale. All dimensions to be verified
' and checked on site. These designs
«\ oot eer et ee ew ' Eee drawings specifications and the copy
right thereof, are the property of Bark
i Design Pty Ltd and must not be used
retained or copied without the written
Mf authority of Bark Design Pty Ltd
POOL POOL TERRACE !
DECK
Apartment 1
LJ
yi
wy tS Arcthe
© ‘2
eae,
wee ake x | ft
KL yy TT
R ) o-* ox) J
et
gt
Lr) =e eee
¥ ss tirtttt TT pet
‘' 7 a | yy yr ~ eee -- \
AO rm | PEE EE
PO (Yory > | | jt tt Ltt
fo) fats PSX)
AY nae eve, —— vit ttt yg il
eg ~~4
_E PEt ttt] UPPER
S : ro} ENTRY Po Es SHARED TERRACE |
Lis AID i y | | | | StI. @ Design
are es H— —A Sj tt a Architects
ra Xs!
5 SE US Oa: — —,
Pr EERE EEE EEE HH Bark Design Pty Ltd
ACN 101 764 612
S i e un une ptt ABN 30 101 764 612
ae a
t Lt Soo Ht | prmerremmerermmrmsetem PO Box 1355 Noosa Heads
Sh beeen
Gs Pd rye yey tt Peter ptt
t SCeEEe ee PCC Pe Queensland Australia 4567
bE
_ Telephone 07 54710340
Facsimile 07 5471 0343
rye ae tate aan Pt | a8 Lindy Atkin 0412 127 904
ttt ig PTT Ly ty ay] | Apartment 2 Steve Guthrie 0418 876 394
Py
PP ded | | et Yt i Email [email protected]
iy | Braichuy
S Pet | cece Ab Lt | tt POOL POOL Pty TERRACE Architects Registration No.
et yanuun Pt Lt RAIA member 28409
Lt aaa
re pt DECK rt i mom =a, 3668 (SG)
is IT an an), Project
Lif
PIN Ty Pt Nase COaSt apartments
PY RET Lj f
PEP NT Py i rte i
pt
Sy Cha 7aacts! | ptt Pi for Yellow Oyster
7 Pe Lt Properties Pty Ltd
wo Rt pe Li yt]
tl TA Pt ptt
BCLS CAH Lt Ltt
pi a
BB, | REC Pt TEE ETT PP a ts Date November 2006
aun
N 3 mot Pitty ann San REE 14
Lt} YP a
reas yt Yt Tt
ARERR pt HY i re
Pt Vo
ith Fn eft PCP Drying Court Drawing Title
Sees Po
Peiwr Care rete tte
ae CI | a Ground Cover -
et a ptt tt tt + a2 RRS ee ee - a --- wae am eee
Pit ty tt Pitre Apartment 2 (north)
S| coon Pe
eri tt
tol TTT AT
|
re irr tty Pt LL | Peo! Landscape Architect
i) Pr py t “Landform"
Re Pia ee 2a UL Z| eae
SCT PEP Tt ryt To 1
© eo Roce Ras Pte TT tt Ty Project No G.12
—e RE OIE mae ee el
Jorn smoeth| s
ex vet) Ing Boot bt Drawing No BA.38
Revision
AThe text continues on section 57.