Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

0015584F.001

of 69

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

.          .,
          INTEGRATED PLANNING ACT 1997                                                                       IDAS Assessment Checklist, Version 18.0, 10 November 2006
          Operational works in atidal areaor       |9,   The application involves operational work that is: (tick the applicable box/es)
          So ea g           eT ett coemore              Ci)      tidal work*® as defined under the Coastal Protection and Management Act 1995 (the
          information about prescribed tidal work in local       Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
          eee lida! areas refer   arene 002 ne}         Eli).    tidal work that is prescribed tidal work" other than in a canal"? -complete Part P of Form     1; oF
           ness you answered ‘none of the a   ,              -        .        a                                      oo,
          application requires assessment by the        (J (ii)  carried out within a coastal management district under the Coastal Act and for - complete
         Environmental Protection Agency (EPA).                  Part M of Form 1 if any box/es (a) to (i) below are ticked.
          Man ae te he apptaien EPA ss concurrence               [J (a)    constructing or installing works in a watercourse between MHWS and HAT (ie.
          agency for the application in relation to this matter.           other than those works in tidal water) where the development has been determined not
         Local government & the assessment manager for at                  to be assessable against the Water Act 2000 ;
         prescri      work.                                                          ,              .                               .
                                                                 (J (b)    constructing a canal’? intended to be connected to tidal waters;
                                                                 LJ (c)    constructing an artificial waterway;
                                                                  (J (d)   reclaiming land under tidal water;
                                                                  (] (e)   disposing of dredge spoil or other solid waste material in tidal water;
                                                                  [J (f)   interfering with quarry material on State coastal land above high-water mark;
                                                                  (1) (g)  draining or allowing drainage or flow of water or other matter across State
                                                                           coastal land above high-water mark;
                                                                  [_](h)   removing or interfering with coastal dunes on land, other than State coastal land,
                                                                           that is in an erosion prone area and above high-water mark;
                                                                  (_] (i)  constructing a bank or bund wall to establish a ponded pasture on land, other
©                                                                          than State coastal !and, above high-water mark; or
                                                            (iv)  none of the above.
          Operational work below high water       | 10.  The application involves operational work that is: (tick the applicable box/es)
         mark     formation refer to Guide 18. For more   C1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
          information about prescribed tidal work work in local   Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
          ene aetna                  en ov                7 (ii) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; OF
                you answer                                     ve     .         ae                                  gs
          the application triggers referral to Queensland [_] (iii) carried out within a coastal management district'S under the Coastal Act and for -
          Transport (QT) (Maritime Safety Qld) as a                         .     .                   '             .               ee     ge
          concurrence agency.                                     (-] (a)  disposing of dredge spoil or other solid waste material in tidal water - complete Part
          Local government is the assessment manager for alt               M of Form 1;
               i   j     k.                                                      noe                 .
          Prescribed tal wor                                      [1 (b)   reclaiming land under tidal water - complete Part M of Form 1; or
                                                                  (_](c}   constructing a canal’, if the canal is associated with reconfiguring a lot - complete
                                                                           Part M of Form 1;
                                                          [X] (iv)  none of the above.
          Coastal management                        11.  The application involves: (tick the applicable box/es)
          For more information refar to Guide 18,         CL) (i)   material change of use assessable under a planning scheme involving operational
           Unless you answered "none of the above" to Q11,                    ‘                              i                             jetrict5
          ine application requires assessment by the                work carried out completely or partly in a coastal management district
©         Environmental Protection Agency (EPA).          {_]{ii)   a material change of use assessable under a planning scheme involving building
          ran ore he ppleaton EPA eet oe                            work, carried out completely or partly in a coastal management district that is —
           agency for the application in relation to this matter.   e the construction of a new premises with a GFA’ of at least 1000m2
                                                                    e the enlargement of the GFA of existing premises by more than 1000m?
                                                          LJ (iii)  reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
                                                                    completely or partly in a coastal management district
                                                          [_] (iv)  reconfiguring a fot'® assessable under schedule 8 of the IPA and in connection with
                                                                    the construction of a canal'® — complete Part M of Form 1
                                                              (v)   none of the above

          10 Tidal work is defined in sch 10 of the IPA.
          11 Prescribed tidal work is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
          {2 Canal means canal as defined under the Coastal Protection and Management Act 1995
          13 Tidal work is defined in sch 10 of the IPA.
          14 Prescribed tidal work is defined in the Coastaf Protection and Management Regulation 2003 and inctudes certain tidal works cornpletety of partly within a tocal government tidal area.
          15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
             coastal management district under section 47(2) of that Act.
          16 Canal means canal as defined under the Coastal Protection and Management Act 1995
          17 GFAis defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
          18 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
             accompanied by the application for the operational works to construct the artificial waterway.
                                                                                          Page 4

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015584F.001.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.