INTEGRATED PLANNING ACT 1997                                                                  IDAS Assessment Checklist, Version 18.0, 10 November 2006
         Electricity infrastructure              18.  The application involves: (tick the applicable box/es)
         Fax more information refer to schedule 2of the IF (J (i) reconfiguring a fot where any part of the fot is -
         Untess you answered ‘none of the above” to 18,        « subject to an easement in favour of a distribution entity or transmission entity under the
         the application triggers referral to the agency to       Electricity Act 1994 and the easement is for a transmission grid or supply network under
        which the easement is granted in favour of as advice      that Act; or
         ey.                                                   « situated within 100m of a substation site;
                                                      (_ (ii)  a material change of use, assessable against a planning scheme and not associated
                                                               with reconfiguring a lot if ~
                                                               « any part of the premises is subject to an easement in favour of a distribution entity or
                                                                  transmission entity under the Electricity Act 1994 and the easement is for a transmission
                                                                  grid or supply network under that Act; and
                                                               ¢ any structure or work that is the natural and ordinary consequence of the use is, or will be,
                                                                  located wholly or partly in the easement;
                                                      C (iii)  a material change of use, assessable against a planning scheme and not associated
                                                               with reconfiguring a lot if any part of the premises is situated within 100m of a substation
                                                               site;
                                                      CJ (iv)  operational work that is filling or excavation assessable against the planning scheme,
                                                               not associated with reconfiguring a lot, if -
                                                               e any part of the premises is subject to an easement in favour of a distribution entity or
                                                                  transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
                                                                  the easement;
@                                                              e the work is located wholly or partly within 10m of a substation site;
                                                       XJ (v)_ none of the above.
         Land designated for community           19.  Does the application involve development assessable against the planning scheme and on land
         infrastructure                               designated for community infrastructure?
         arrinated for com aity neastucre rey bigger   (i) intended to be supplied by a public sector entity; and
         this referral,                                (ii) on land not owned by or on behalf of the State; and
         For more information refer to schedule 2 of tha IP wes
         Regulation,                                   (iii) other than development —
         If you answered "YES" to 019, the application     (a)  for the designated purpose; or
         fequires assessment by the chief executive of the          .                                 .
         department administering the Act authorising the  (b)  carried out by, or on behalf of, the designator.
         development for the designated purpose.       & NO
         If an agency other than the designator is the
         assessment manager for the application, the    | YES
         designating agency will be a concurrence agency for
          the application in relation to this matter.

                                                                                      Page 6

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015584F.001.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.